[Dry Mist Installation Case] Automobile Inspection Station
Introducing a case where improvements in the hot working environment were achieved through installation at a vehicle inspection station.
We would like to introduce a case study of the introduction of dry mist at an automobile inspection station. The installation at the inspection station has improved the hot working environment. By implementing it in an environment where air conditioning cannot be used, we expect high effectiveness. The dry performance also allows for humidification in large spaces such as horticultural facilities. 【Case Overview】 ■ Area Covered: Approximately 250m2 ■ Total Number of Nozzles: 66 ■ Water Usage: 3.3L/min ■ Power Consumption: 0.75kW *For more details, please refer to the PDF document or feel free to contact us.
- Company:なごミスト設計