[Scale Measures Case Study] Ryouzen Nishi-Shinjuku Store (Bento Delivery - Tokyo)
The bio-water peeled off the scale in the boiler inner tube after 2 weeks at 1/3 concentration!
We would like to introduce a case study from Rishin Nishi-Shinjuku Store (Bento Delivery, Tokyo). A scale removal field test was conducted. The Bio Water 1/3 was installed in the hyper steamer. Before installation, it was completely filled with scale, but after 2 weeks of installation, the scale began to peel off. [Case Study] ■ Location: Installation of Bio Water 1/3 in the hyper steamer *For more details, please refer to the PDF document or feel free to contact us. *The section titled 'Trigger for Interest' displayed during PDF download is generated by Ipros Inc.'s AI.
- Company:T.K.K.エボリューション (株式会社エランビタールは2022年4月1日より社名変更しました)
- Price:Other