Civil Design CAD [Civil 3D] User Case Vol. 2
Three years after the start of CIM utilization, we have already received the director's award! The key is to enjoy new technologies.
We would like to introduce a case study of how Uekigumi Co., Ltd. utilized Autodesk's civil engineering CAD "Civil 3D." <Overview> Uekigumi, headquartered in Kashiwazaki City, Niigata Prefecture, embarked on serious BIM/CIM utilization with three members of its civil engineering department starting in 2016. The results bore fruit just three years later, when the "Shinnozumi Bridge Pier No. 2 Construction," completed in December 2019, was recognized by the Hokuriku Regional Development Bureau of the Ministry of Land, Infrastructure, Transport and Tourism and received a Director's Award. The company emphasizes that BIM/CIM should never be outsourced. We will introduce their thoughts on and methods of utilizing BIM/CIM. <Utilization Methods and Results> Please check the PDF document for more details.
- Company:SB C&S
- Price:Other