We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for BIM software.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

BIM software×トリンブル・ソリューションズ - List of Manufacturers, Suppliers, Companies and Products

BIM software Product List

31~45 item / All 50 items

Displayed results

[BIM Software Implementation Case Study] Bjelgste Office Building

We combine traditional building materials like wood with modern design and manufacturing techniques!

"Birgstad Financial Park" was constructed as an office building for SpareBank 1 in Stavanger, Norway. The above-ground structure uses wood (a natural, renewable, and locally sourced material) as the primary load-bearing element. The floors are made of cross-laminated timber panels, supported by laminated beams and columns. The main wooden components are designed with strength in mind, and through high-precision processing, most of the wood can be directly joined without the use of metal fasteners, thereby shortening the construction process. Thanks to the advanced modeling technology of "Tekla Structures," the beams not only achieve aesthetic beauty but also meet practical requirements. *For more details, please refer to the PDF document or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 3D CAD
  • antenna
  • 2D CAD Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Transformation of North Sea Oil Field Platform Construction

Efficient design and manufacturing automation! Achieving advanced automation in the design and manufacturing processes!

The two platforms of the Johan Sverdrup oil field are designed and manufactured by the Norwegian company Aibel. Currently, the company's massive project is transitioning from a shipyard in the tropical region of Thailand to the rough seas of the North Sea. This project faced challenges such as compliance with standard requirements in the oil and gas industry and the integration of Tekla software with existing solutions. To address these challenges, experts in three-dimensional design using Tekla software collaborated to successfully semi-automate the drawing creation process with Tekla. They generated accurate information in a data format suitable for collaboration with machine tools, achieving up to 95% efficiency in the company's production labor and quality. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 3D CAD
  • antenna
  • 2D CAD Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Concentrated Solar Power Plant

The main steel structure consists of 16 columns! It is supported by three main platforms!

SteelPro 4 s.r.o. undertook the basic design, general layout creation, and modeling of all connections for a steel structure 3D model of a solar receiver (MSR) with a total weight of approximately 900 tons and a height of 36 meters. The main steel structure will be completed, including secondary structures such as platforms, various walkways, and supports for equipment. Appropriate solutions were required to resolve technical space requirements and interference with the structure. A significant reason for the success of this project was the sharing of the 3D model among members of different professions, which not only allowed for progress tracking but also enabled close collaboration among stakeholders. Additionally, the structure was divided into production units in line with the delivery schedule, and the 3D model was provided to steel trading companies and steel fabricators. This made it possible to create drawings both at the manufacturing plant and on-site. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special site below ⇩

  • 3D CAD
  • antenna
  • 2D CAD Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] New National Football Stadium in Slovakia

The stability of the roof structure of the entire stand is ensured by braces arranged in a truss pattern!

The new national soccer stadium, "Tehelné Pole Stadium," is a project with the largest investment level in the modernization of Slovakia's soccer stadiums to date. The new stadium is being built on the site of the old Tehelné Pole Stadium, maintaining the surrounding environment. The stands feature a cantilever roof made of membrane structure, a cutting-edge technique, which covers the entire stand to provide shade and protect against inclement weather. This cantilever roof is composed of a truss structure, with individual components supported by reinforced concrete foundations. The construction of this new stadium has become a unique and highly challenging project in terms of its distinctive shape and structural complexity. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 3D CAD
  • Modeler
  • 2D CAD Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] HelsinkiGramofoni

Eliminate mistakes and unnecessary waste! You can easily visualize usable locations in a spot!

Helsinki Gramofoni is a residential building made of precast concrete structures, supported by a footing foundation on a 5/6-story ground. The construction company Skanska has begun to realize that models from a different design sector are very useful. For example, "Tekla Structures" was used for site management and schedule management. "The company was seeking reliable construction management and effective schedule management, as well as a way to eliminate inconsistencies and mistakes from design. Building Information Modeling provides undeniable benefits in this regard," said the company's development director. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special site below⇩

  • 3D CAD
  • 2D CAD Construction
  • Modeler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Stadium (Sochi, Russia)

We would like to introduce a case where a massive curved roof structure was realized using Tekla!

Inspired by the Easter egg of a Russian jeweler, the stadium designed features integrated walls and a roof that shine in the sunlight, attracting attention as a beautiful stage. The stadium is a steel structure with a gently curved, massive shape, requiring advanced technology for calculations of beam nodes and dimensions of joints with the basic structure. Additionally, during the modeling process, Mostproekt discovered that the size of the joint components posed transportation issues and conducted simulations on the Tekla model to create alternatives. As a result, by manufacturing products that consider shipping conditions, potential troubles were prevented. "Tekla Structures" played a significant role in solving such issues. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special site below ⇩

  • 3D CAD
  • 2D CAD Construction
  • Modeler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Guacolda Coal-Fired Power Generation Facility

Introducing examples of overcoming communication barriers such as time differences, distance, and different languages!

We would like to introduce the construction of coal-fired power generation facilities in the Republic of Chile, South America, which Mitsubishi Heavy Industries, Ltd. received an order for in 2006. Chile, the manufacturing site, is located exactly on the opposite side of the Earth from Japan. The time difference, geographical distance, and different languages pose significant obstacles to information communication in design, manufacturing operations, and their process management. To address this, the company utilized "Tekla Structures" to accumulate and manage all information from design to manufacturing within a single 3D model. By doing so, they maintained consistency of information between the design site in Japan and the manufacturing site in Chile, aiming to reduce rework and inconsistencies in design and manufacturing operations. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • Software (middle, driver, security, etc.)

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Brominmaki Wastewater Treatment Facility

Structural design is carried out entirely based on BIM! We will introduce a case that achieved the management of a vast amount of data.

The new wastewater treatment facility being constructed in Blominmäki, Espoo, Finland, has a high processing capacity and can remove 99% of phosphorus from water. This facility, which has buildings and storage tanks installed on a site of over 10 hectares, utilizes Nordic construction methods for underground excavation. The project is diverse and presents many challenges, while also featuring a very interesting design. The biggest challenge has been managing the vast amount of data handled in the project. The design employs numerous modeling software, including "Tekla Structures" and "Trimble Connect." Additionally, all structural design is carried out based on BIM and is modeled in greater detail than the level of detail (LOD) specified by Finland's COBIM. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 2D CAD Construction
  • 3D CAD
  • Modeler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Tripla Project

Expanding the scope of BIM application and demonstrating its effectiveness in various processes! Case studies from large-scale construction sites.

The development project of Tripla, located in the center of Pasila, Helsinki, the capital of Finland, utilizes BIM tools for various design tasks. The project's procurement team efficiently calculates quantities of construction materials by leveraging the BIM model. "Tekla Structures" allows for the aggregation and classification of cost estimation information under various conditions, enabling the visualization of costs at detailed levels, such as by work process or contractor, which aids in accurately understanding estimated prices. Additionally, the Tekla model has achieved significant results in examining the feasibility of construction, such as investigating the delivery routes for escalators to be installed within the building. [Case Overview] ■ Implementation Site: Tripla Project (Helsinki, Finland) *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special site below⇩

  • 3D CAD
  • 2D CAD Construction
  • antenna

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Karasuma Racecourse Redevelopment Project

Tekla is effective for designing buildings with large curves! Examples from redevelopment projects such as spectator stands.

The redevelopment of the Karasuyama Racecourse is a project to construct world-class facilities. The company responsible for the project is handling everything from design to detailed design, manufacturing, and the construction of the main viewing stand roof using a 45-meter cantilever beam. The very complex roof shape had significant restrictions on deflection and allowable tolerances, but by utilizing "BIM" and "Tekla Structures," they conducted precise detailed design that considered the use of fabrication drawings. [Case Overview] ■ Challenge: The very complex roof shape had significant restrictions on deflection and allowable tolerances. ■ Results - Achieved precise detailed design that considered the use of fabrication drawings. - Tekla is very effective for designing buildings with large curves, like the Karasuyama Racecourse. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 2D CAD Construction
  • 3D CAD
  • Modeler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] UAE Pavilion at the Dubai International Expo

Completing the project through collaboration! Introducing case studies of implementation in commercial facility construction.

The National Media Council of the United Arab Emirates adopted the design proposal by architect Santiago Calatrava for the UAE Pavilion at the 2020 Dubai International Expo. In July 2017, Arabtec Construction, a 100% subsidiary of Arabtec Holding, which is responsible for infrastructure development, won the construction contract for the pavilion. Despite facing various challenges, including a very tight deadline and the fact that all major rib materials were cambered, we received positive feedback stating, "Thanks to Tekla Structures and Tekla BIMsight, we were able to complete the project while collaborating effectively." [Challenges] ■ Very tight deadline ■ Composed mostly of beams joined with special specifications ■ All major rib materials are cambered *For more details, please refer to the PDF document or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special website below⇩

  • 2D CAD Construction
  • 3D CAD
  • Modeler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] 2020 Dubai International Expo

Easily coordinate with other stakeholders! Here is an example of how we solved challenges with "Tekla Structures."

We would like to introduce a case study of BIM software implementation at the "2020 Dubai International Expo Mobility Pavilion." In this project, Tiger Steel was responsible for everything from the detailed design and fabrication of the steel structure, including the examination of joints, to construction. The three-dimensional structure and complex joints were very challenging, but this was resolved by using "Tekla Structures." The biggest advantage of using this software is that it makes coordination with other stakeholders easier. [Case Overview] ■ Challenge: The three-dimensional structure and complex joints were very difficult. ■ Result: This was resolved by using Tekla Structures. ■ Benefit: Coordination with other stakeholders became easier. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 2D CAD Construction
  • 3D CAD
  • Modeler

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Maren Corporation's Circulating Fluidized Bed Boiler

Improvement in detailed design of joints through modeling! A case where design errors were minimized.

We would like to introduce a case study on the implementation of BIM software in the design of Maren's Circulating Fluidized Bed (CFB) boiler. In this project, the use of "Tekla Structures" was essential for coordinating and adapting various piping and structural designs across different sections. Tasks were allocated early in the bidding phase, and effective detailed design of joints allowed for quick generation of drawings, minimizing design errors. At the points where structural steel components connect to the plant piping supports, structural members either converted IFC data to raw data of the same product or referenced IFC as information to be displayed in product drawings for verification. High-level detailed design has led to zero errors. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 2D CAD Construction
  • 3D CAD
  • Other CAD related software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Domestic Utilization Case Studies] Steel Frame Detailed Modeling

A case study utilizing Tekla Structures for steel detailing modeling has been published in the "Nikkankensetsu Tsushin Shimbun."

By downloading the PDF, you can view the catalog for the structural BIM software 'Tekla Structures' (Steel Detail Modeling) and case study articles on its use in Japan. (If the PDF button is not displayed) ⇩ Case study articles can be downloaded from the special site below ⇩

  • 3D CAD
  • antenna
  • 2D CAD Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Domestic Utilization Case Studies: Detailed Modeling of Concrete

A case study utilizing Tekla Structures for detailed concrete modeling has been published in the "Daily Construction Communication News."

By downloading the PDF, you can view the catalog for the structural BIM software 'Tekla Structures' <Concrete Detailing Modeling> and case study articles on its use in Japan. (If the PDF button is not displayed) ⇩ You can download the case study articles from the special site below ⇩

  • 3D CAD
  • 2D CAD Construction
  • antenna

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration