We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 45 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

  1. 三和グランド Tokyo//Building materials, supplies and fixtures
  2. シャープ化学工業 大阪本社 Osaka//Chemical
  3. 小泉製麻 神戸本社 Hyogo//Manufacturing and processing contract
  4. 4 長野大信工業 Nagano//Manufacturing and processing contract
  5. 5 第一カッター興業 本社 Kanagawa//others

Construction method Product ranking

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

  1. No paint leaks from the gaps in the protective covering! Edge painting protective method LCL method. シャープ化学工業 大阪本社
  2. Attention those struggling with ivy clinging to fences! Introducing 'Bariosu Net'! 小泉製麻 神戸本社
  3. Construction method "Cage mat multi-layer stacking type" 長野大信工業
  4. 4 Permeable blast furnace slag paving material "Color Sand" 三和グランド
  5. 4 Land Stitch Anchor for securing air conditioning outdoor units. キャムズ 本店/統括センター

Construction method Product List

316~330 item / All 351 items

Displayed results

[Construction Case] Drugstore: Settlement Repair Work (Niigata Prefecture)

Floor sagging due to ground subsidence! A case of straightening the floor before store renovation.

Here is a case study of "settlement correction work" conducted at a drugstore in Niigata Prefecture. In this case, the store's floor had sagged due to settlement. At the time of the store renovation, they wanted to correct the floor to make it level, and our Upcon method was adopted. The construction area was approximately 1500m2. Using the concrete replacement method, a project that typically takes one month was completed in just four days. (Settlement amount approximately 100mm) 【Case Overview】 ■ Construction Area: Approximately 1500m2 ■ Maximum Settlement Amount: Approximately 100mm ■ Area: Drugstore in Niigata Prefecture ■ Construction Period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Toy Retail Store / Electronics Retail Store: Earthquake Recovery / Floor Settlement Correction Work

Due to the impact of the Great East Japan Earthquake, the floor inside the store has significantly sunk! There have been cases where gaps have formed between the floor and the walls, as well as between the walls and the ceiling.

We would like to introduce a case of "earthquake recovery construction" and "floor subsidence correction work" carried out at a toy retail store and an electronics retail store in Fukushima Prefecture. Due to the impact of the Great East Japan Earthquake, the floor inside the toy retail store sank significantly. As a result of the floor subsidence, gaps were observed between the floor and walls, as well as between the walls and ceiling. Therefore, an up-con method that can be corrected during the night while the store is closed was adopted, and our company carried out the correction work. Additionally, since there were voids under the floor, we also implemented void filling work by injecting polyurethane resin into the gaps. 【Case Overview】 ■ Construction Area: Approximately 2,300m2 ■ Maximum Subsidence: 144mm ■ Area: Fukushima Prefecture ■ Construction Period: Continuous 11 nights (2012) *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Shopping Center: Subfloor Settlement Correction Work

Due to consolidation settlement, the floor has sunk over a wide area inside the store! A gap has occurred between the floor and the wall.

We would like to introduce a case of "subfloor sinking correction work" and "subfloor void filling work" carried out at a shopping center in Iwate Prefecture. Due to consolidation settlement, sinking was observed over a wide area of the floor. As a result of the floor sinking, gaps appeared between the floor and walls, causing various issues throughout the store. An Upcon method that could be corrected during the night while the store was closed was adopted, and our company performed the corrections. Additionally, since voids and cavities were also observed under the floor, void filling work using urethane was carried out as well. [Case Overview] ■ Construction Area: Approximately 540m² ■ Maximum Settlement Amount: 71mm ■ Maximum Void Amount: 190mm ■ Area: Iwate Prefecture ■ Construction Period: Continuous 7 nights *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Supermarket: Subfloor Settlement Correction Work (Gifu Prefecture)

Floor subsidence due to weak ground! Introducing a case where repairs were made during nighttime while the business was closed.

We would like to introduce a case of "subfloor sinking correction work" carried out at a large supermarket located in Gifu Prefecture. A large portion of the backroom and store interior had sunk, causing gaps to appear between the floor and walls due to the floor sinking, resulting in various issues throughout the store. An Upcon method that can be corrected during the night while the store is closed was adopted, and our company performed the corrections. 【Case Overview】 ■ Construction Area: Approximately 700m2 ■ Maximum Sinking Amount: 85mm ■ Area: Gifu Prefecture ■ Construction Period: Continuous 5 nights (2013) *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Leisure Facility: Subfloor Settlement Correction Work (Ibaraki Prefecture)

Due to the impact of the Great East Japan Earthquake, subsidence occurred! Adjustments of 350m2 were made over four consecutive nights of construction.

Here is a case study of "subfloor sinking correction work" conducted at a leisure facility in Ibaraki Prefecture. We carried out correction work for a significantly sunken floor in the pachinko area within the facility. Sinking was also observed in other areas, including in front of the machine room and in the restrooms, and we performed sinking correction work over a total construction area of approximately 350m2 over four consecutive nights. [Case Overview] ■ Construction Area: Approximately 350m2 ■ Maximum Sinking Amount: 93mm ■ Area: Ibaraki Prefecture ■ Construction Period: Four consecutive nights (2011) *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Large Pachinko Parlor: Subfloor Settlement Correction Work (Miyagi Prefecture)

Significant damage from the Great East Japan Earthquake! Introducing a case of subsidence correction with a maximum subsidence of 112mm.

Here is a case study of "subfloor sinking correction work" conducted at a large pachinko parlor located in Miyagi Prefecture. The large pachinko parlor suffered significant damage due to the Great East Japan Earthquake. Extensive renovation work was carried out for a swift reopening. Sinking also occurred in the store's flooring, and the Upcon method, which allows for quick corrections, was adopted. Our company implemented the floor sinking correction by injecting urethane resin under the subfloor, successfully correcting all areas within the construction scope, including a section that had sunk by a maximum of 112mm, to within the planned values. [Case Overview] ■ Construction Area: Approximately 230m2 ■ Maximum Sinking Amount: 112mm ■ Area: Miyagi Prefecture ■ Construction Period: 1 day (2011) *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Earthquake-Induced Settlement Repair Work (Miyagi Prefecture)

Addressing the sinking of slab foundation houses due to earthquakes in a short construction period! A case where all areas were corrected to within -10mm.

We would like to introduce a case of "settlement correction work" for a slab foundation house located in Sendai City, Miyagi Prefecture. Due to the impact of an earthquake, there was significant settlement from the bedroom towards the entrance. Cracks and gaps appeared in the columns and stairs of the entrance porch. All points, including a maximum settlement of 73mm, were corrected to within -10mm. 【Case Overview】 ■ Construction Area: Approximately 80m² ■ Construction Period: 2 days ■ Maximum Settlement Amount: 73mm *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Settlement Correction Work (Tottori Prefecture)

No need for large-scale demolition work! Here we present a case where a settlement of up to 46mm was corrected.

Here is an example of "settlement correction work" carried out on a slab foundation house in Unnan City, Tottori Prefecture. Due to a maximum settlement of 46mm observed, resin was injected under the slab foundation to implement the correction. The company was chosen because the correction could be made without large-scale demolition work or moving. 【Case Overview】 ■ Construction Area: Approximately 106m2 ■ Maximum Settlement Amount: 46mm ■ Area: Unnan City, Tottori Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Settlement Correction Work Due to Earthquakes and Liquefaction

Maximum sinking of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.

We would like to introduce a case of "settlement repair work" carried out on a slab foundation house located in Urayasu City, Chiba Prefecture. The slab foundation house experienced settlement due to liquefaction caused by the Great East Japan Earthquake. Living in a tilted house also led to health issues such as poor physical condition. We corrected a maximum settlement of approximately 80mm over two days. 【Case Overview】 ■ Maximum Settlement: 80mm ■ Area: Urayasu City, Chiba Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Apartment: Correction of Sunken Floor Slab / Underfloor Void Filling Work

The ground floor slab sank due to the earthquake! A case study of improving the gaps between the floor and walls, and between the walls and ceiling.

We would like to introduce a case of "floor sinking correction work" and "underfloor void filling work" carried out in a condominium located in Higashi Ward, Kumamoto City, Kumamoto Prefecture. Due to the impact of the Kumamoto earthquake, the floor of the first floor of the condominium sank, creating gaps between the floor and the walls, as well as between the walls and the ceiling. By adopting the Upcon method, which allows for corrections without the need to move, the gaps that had formed between the floor, ceiling, and walls due to the sinking were improved. [Case Overview] ■ Construction Area: 1200m2 ■ Maximum Sinking Amount: 61mm ■ Area: Kumamoto City, Kumamoto Prefecture ■ Construction Period: 15 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Settlement Correction Work (Gifu Prefecture)

A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.

We would like to introduce a case of "settlement correction work" carried out at a certain house with a flat foundation in Gifu Prefecture. There was a request to perform settlement correction before the exterior wall work, and we were contacted by the client. We injected resin under the flat foundation to correct the settlement, completing the work in two days. 【Case Overview】 ■ Construction Area: Approximately 36m² ■ Maximum Settlement Amount: 48mm ■ Area: Gifu Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Elementary School (Classroom): Floor Sunken Correction Work and Deflection Correction Work

Due to ground subsidence, the classroom floor has sagged! The floor subsidence was corrected in a short work period of one day.

We would like to introduce a case of "sunken floor correction work and deflection correction work" carried out in a classroom of an elementary school in Tokyo. Due to ground subsidence, a maximum of 80mm of sinking occurred in the center of the floor, causing deflection. Concerns for safety and health rendered the classroom unusable. We corrected the sunken areas of the classroom floor from the outer edges towards the center, reducing the sinking to -10mm. The deflection of the classroom floor was resolved, and the work was completed. 【Case Overview】 ■ Construction Area: 63m2 ■ Maximum Subsidence: 80mm ■ Construction Period: 1 day ■ Area: Tokyo *For more detailed information about the case, please refer to the related links. For further details, please check the PDF materials or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Process Video] Elementary School (Gym Floor): Settlement Correction Work

The gymnasium floor that has sunk and warped due to an earthquake and ground subsidence! Short construction period correction using the Upcon method.

We would like to introduce a video of the correction of the sinking floor in the gymnasium of an elementary school located in Miyagi Prefecture. The floor of the gymnasium has significantly sunk due to earthquakes and ground subsidence. This video explains the construction process of the Upcon method used in the gymnasium. The construction area is 665m2, and the construction period is 6 days. Please take a look. 【Site Information】 ■ Construction Area: 665m2 ■ Construction Period: 6 days ■ Maximum Sinking Amount: 133 ■ Maximum Void Amount: 90mm ■ Area: Miyagi Prefecture *For more detailed information, please refer to the related links. For more details, please check the PDF materials or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Elementary School (Classroom): Settlement Correction Work

Concerns about children's safety and health! A case of correcting floor sagging in the classroom within a short construction period.

We would like to introduce a case where we performed "subsidence correction work" in an elementary school classroom in Miyagi Prefecture. In this classroom, floor sagging occurred due to ground subsidence, raising concerns about the safety and health of the children. We raised the floor using the foaming pressure of polyurethane resin, correcting the maximum subsidence from -112mm to the planned value of -22mm. [Case Overview] ■ Construction Area: 1406m2 ■ Maximum Subsidence: 112mm ■ Construction Period: 6 days ■ Area: Miyagi Prefecture *For more details about the case, you can view it through the related links. For more information, please refer to the PDF materials or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Elementary School: Filling Work for Gaps Under the Concrete Floor + Correction Work for Concrete Floor Settlement

Our company can offer construction proposals tailored to your needs, such as work scheduled to align with school events!

We would like to introduce a case of "subfloor void filling work + subfloor settlement correction work" carried out at an elementary school in Miyagi Prefecture. Due to the impact of the Great East Japan Earthquake, settlement occurred in various areas within the school, including classrooms, the health room, the principal's office, and the gymnasium. The construction area was approximately 530m2, with a maximum settlement of 71mm and a maximum void volume of 250mm. 【Case Overview】 ■ Construction Area: Approximately 530m2 ■ Maximum Settlement: 71mm ■ Maximum Void Volume: 250mm ■ Area: Aijima Elementary School in Natori City, Miyagi Prefecture ■ Construction Period: August 2013 *For more detailed information about the case, please refer to the related links. For further details, please check the PDF materials or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration