[Construction Case] Middle School (Gymnasium): Floor Settlement Correction Work
Short-term repairs to the middle school gymnasium! Injecting urethane resin to ensure there is no strain on the concrete floor.
We would like to introduce a case of "floor sinking correction work" that we conducted. Due to the Kumamoto earthquake, a gymnasium at a junior high school in Kumamoto Prefecture sank. Because it could be corrected in a short time, we received a request for construction. The area of the sinking correction was approximately 897m2. The maximum sinking amount was 53mm, and the planned correction value was within -10mm. The construction period was 7 days. 【Case Overview】 ■ Area of sinking correction: Approximately 897m2 ■ Maximum sinking amount: 53mm ■ Planned correction value: Within -10mm ■ Area: Junior high school gymnasium, Kikuchi District, Kumamoto Prefecture ■ Construction period: 7 days *For more details about the case, you can view them through the related links. For more information, please refer to the PDF document or feel free to contact us.
- Company:アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
- Price:Other