Tohoku University Technology: Summer Concrete Construction Period Map: T23-100
Pinpoint display every 1 km² on the map app.
In concrete construction under high-temperature conditions, the hydration reaction of cement is accelerated, which is why JASS5 specifies a hot weather period. This limits the working time from the usual 120 minutes to within 90 minutes during hot weather, as insufficient measures may lead to a risk of strength reduction. The specified application period above serves only as a guideline for major cities and may not accurately reflect the actual necessary period for each construction site. The present invention is a program that estimates the application period in a grid pattern of 1 km² and displays it color-coded on a map application, effectively improving the efficiency of the determination of the application period and rationalizing construction planning (cost reduction).
- Company:Tohoku Techno Arch Co., Ltd.
- Price:Other