Improvement of quality through optimization of the drying process.
【Problem】Insufficient drying after washing leads to moisture remaining in the coating, causing pinholes. 【Cause】Insufficient drying time / Low drying temperature / Residual moisture on the surface / Bubble formation inside the coating. 【Management Standards】It is essential to ensure appropriate drying temperature and time, and to achieve complete drying. 【Improvement Example】By optimizing the drying process, the occurrence rate of pinholes significantly decreased.
Inquire About This Product
Related Videos
basic information
Materials: Iron, Stainless Steel, Aluminum | Issues: Pinholes, Bubbles | Measures: Temperature, Time Management
Price range
Delivery Time
Applications/Examples of results
Pre-treatment and surface treatment of metal parts before painting.
Company information
We are not just a "subcontracted painting factory." Established in 1958, our company has a foundation of painting technology and also specializes in chemical treatment, stripping, and cleaning, functioning as the "external surface treatment department" in your organizational chart. Based on our philosophy of "preparation is eight-tenths of the work," we emphasize participation from the "upstream process" before the drawings are finalized. We conduct test painting on a wide range of metals and difficult materials, and we produce the entire process from assembly, packaging, to delivery, thereby reducing your management workload. Additionally, by being able to perform zinc phosphate treatment in-house, we achieve stable painting quality. Furthermore, our micro-heating stripping technology, which does not use chemicals, maintains the electrical state of the "jigs (hangers)" that influence painting quality. Our approach of "pre-treatment determines painting quality" ensures the stability of the paint film during mass production. Rather than simply "applying specified standards," we work backwards to achieve optimal painting specifications and prevent scratches during transportation, sparing no effort in thorough discussions from the outset. This diligent preparation is the shortest path to preventing rework and minimizing total costs. From the development stage, please utilize the expertise of our specialists as part of your production line.





