Eliminate the arrangement loss of "waiting for drawings" to zero! Even with an incomplete BOM, run MRP in advance from confirmed units and dramatically shorten lead times with automatic calculations of required quantities.
In the field of custom order production, are challenges such as "not entering arrangement calculations until the drawings and BOM are 100% complete, which puts pressure on delivery times" and "chaotic material arrangements due to manual complex calculation errors and omissions" becoming the norm? FUSE's "Material Requirements Planning (MRP)" function completely eliminates these time losses and mistakes in arrangement calculations. Linked with demand data and the bill of materials (BOM), the system automatically calculates the required quantities and timing of necessary parts and materials in an instant. Taking into account inventory and expected arrivals, it automatically generates the optimal arrangement plan (planned orders). The greatest strength is the full support for FUSE's standout feature, "staggered arrangements." Without waiting for the completion of the entire BOM, MRP can be run in advance for completed units or parts (line items of the BOM), allowing for proactive arrangement planning. This breaks the bottleneck of "waiting for drawings" and dramatically shortens the overall production lead time. *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
Automatic extraction and ordering of materials based on orders / automatic generation of work instructions 【FUSE Functions】 - Quotation management, order management, shipping management, invoicing management, purchasing and outsourcing management, receiving and inspection management, payment management, inventory management, stocktaking management, lot traceability management, picking management, inventory dashboard, work instruction management, process progress management, work performance management, drawing and video management, quality management, bill of materials (BOM) management, material requirements planning (MRP), production planning scheduler, AI automatic planning, quotation actual management, landing forecast (future profit prediction), sales performance aggregation, individual cost aggregation, BI dashboard integration, Web-EDI integration, external accounting system integration *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
Recommended for such issues: - Cannot arrange without complete drawings - Cannot pre-order long lead-time parts - Production planning is halted due to reliance on veterans
catalog(1)
Download All CatalogsCompany information
Nihon Computer Development Co., Ltd. is a company primarily engaged in the IT transformation of businesses. We focus on supporting the IT implementation of small and medium-sized enterprises, with a key business objective of revitalizing local communities that are deteriorating due to declining birth rates, an aging population, and economic concentration in metropolitan areas. For system development, implementation, and maintenance using userware (proficiency technology), please consult with us.


![[DX Promotion] Advanced Work Analysis and Improvement Tool 'Time Prism'](https://image.mono.ipros.com/public/product/image/b8c/2000419232/IPROS99182972907542311320.png?w=280&h=280)
