List of Control and Electrical Equipment products
- classification:Control and Electrical Equipment
8311~8325 item / All 54125 items
Reduce the workload from handling heavy objects! Here are five case studies that solved customer challenges! We are also accepting free consultations and tests tailored to your work!
- Other conveying machines
Ideal for micro-machining! Achieves deburring of holes and double-sided machining in one pass, which was difficult with conventional tools!
- Other machine tools
We will be exhibiting at Mecatronics Tech Japan 2021 from October 20 (Wednesday) to October 23 (Saturday)!
Our company will exhibit at "Mechatrotech Japan 2021," which will be held at Portmesse Nagoya from Wednesday, October 20 to Saturday, October 23, 2021. We will introduce our tools, including the 'Bar Off Tool' capable of chamfering and deburring from a diameter of 0.8 mm, and the 'FEM' tool breakage detection device that reliably detects breakage. We look forward to your visit. (Booth number: 2B12)
A smart and environmentally friendly way to expand small and medium-sized networks.
- Other FA equipment
- Other network tools
Powerful deodorization of ink odor according to purpose!
- Gas recovery/treatment equipment
Powerful deodorization of VOCs tailored to the application! Contributes to reducing running costs.
- Gas recovery/treatment equipment
Decomposing exhaust gases according to their purpose! Contributing to reduced running costs.
- Gas recovery/treatment equipment
Powerfully eliminate unpleasant odors according to the purpose!
- Gas recovery/treatment equipment
Re-liquefy BOG and support the efficient operation of LNG tanks!
- Gas recovery/treatment equipment
- Cooling system
- Other physicochemical equipment
Re-liquefy BOG and support the efficient operation of LNG tanks!
- Gas recovery/treatment equipment
- Cooling system
- Other physicochemical equipment
Approximately 1000 to 1800 kg/day of re-liquefaction is possible per unit!
- Gas recovery/treatment equipment
- Cooling system
- Other physicochemical equipment
Achieving a maximum of 1800 kg/day of LNG re-liquefaction per unit.
- Gas recovery/treatment equipment
- Cooling system
- Other physicochemical equipment
Approximately 1000 to 1800 kg/day of re-liquefaction is possible per unit!
- Gas recovery/treatment equipment
- Cooling system
- Other physicochemical equipment
Re-liquefy the BOG of the fishing boat to reduce fuel costs!
- Gas recovery/treatment equipment
- Cooling system
- Other physicochemical equipment
LED lighting primarily uses punched products made of reflective, diffusive, and insulating sheets!
- LED lighting
Achieving sub-micron position control! A compact design that balances high precision and responsiveness.
- Other process controls