List of Clean Booth products
- classification:Clean Booth
1~45 item / All 364 items
Reduce the workload from handling heavy objects! Here are five case studies that solved customer challenges! We are also accepting free consultations and tests tailored to your work!
- Other conveying machines
By combining parts, it is possible to produce large pallets of 2m x 4m size. Even if damaged, partial replacement is possible, making it economical. *Available from a single piece.
- palette
By enclosing only locally instead of surrounding the entire device, efficient dust collection can be achieved without the need for a large dust collector.
- Clean Booth
- Other clean room equipment and facilities
Completely shut out external dust and particles! A case of transforming a corner of the factory into a clean room.
- Clean Booth
- Other clean room equipment and facilities
The measurement results show that there is no visible dust at all! A significant improvement in the concern of foreign substances entering.
- Clean Booth
- Other clean room equipment and facilities
Since we are using a HEPA filter for air supply, we have cleared a clean class of 10,000.
- Clean Booth
- Other clean room equipment and facilities
Cleaning only the main parts! Introducing a case study where significant cost reductions were achieved.
- Clean Booth
- Other clean room equipment and facilities
By introducing a dust collector, we have eliminated dust leakage and significantly reduced maintenance efforts! If you are considering the introduction of a dust collector, leave it to us!
- Dust collector
- Oil Mist Collector
- Clean Booth
Reduction of defective products! Introducing a case of preventing condensation in a cardboard manufacturing company.
- Clean Booth
- Exhibition planning/construction
- Machinery and equipment installation/dismantling/relocation
Introducing a case where a large painting booth was installed by renovating an existing room within the factory!
- Clean Booth
- Exhibition planning/construction
- Machinery and equipment installation/dismantling/relocation
Dust collection of welding fumes in a welding factory with push-pull overall ventilation! Introducing case studies.
- Clean Booth
- Exhibition planning/construction
- Machinery and equipment installation/dismantling/relocation
Are you struggling with defects or foreign matter due to dust and dirt? Clean room construction can be completed in a short period of 2 to 3 days at a low cost!
- Dust collector
- Clean Booth
- Other clean room equipment and facilities
Part of it has been converted into a clean room! The process has also been shortened, and costs have been reduced.
- Clean Booth
- Other clean room equipment and facilities
It seems that they were satisfied with both the price and effectiveness of the dust collector introduction, and they have installed several similar units in another factory of the same company! If you...
- Dust collector
- Oil Mist Collector
- Clean Booth
Custom-designed and constructed dust collectors, providing what our customers need the most! Whether large or small, leave your dust collector installation considerations to us!
- Dust collector
- Oil Mist Collector
- Clean Booth
Ideal as a pre-filter dust collector for bag filters! It is extremely effective during times of high dust levels! If you are considering the introduction of dust collectors, whether large or small, le...
- Dust collector
- Clean Booth
- Ventilation and Exhaust
The issue of dust scattering around has been resolved! Waste emissions have also significantly improved, leading to increased work efficiency! If you are considering the introduction of dust collector...
- Dust collector
- Deaeration device
- Clean Booth
The introduction of the dust collector has made waste disposal very easy, significantly improving both work time and running costs! If you are considering the introduction of a dust collector, leave i...
- Dust collector
- Clean Booth
- Ventilation and Exhaust
No installation or assembly required! Can switch between negative pressure and positive pressure according to the desired situation!
- Ventilation and Exhaust
- Air purifiers
- Clean Booth
Particles of 0.1μm or larger in the air per cubic meter are the standard! Our company conducts cleanliness measurements after construction.
- Clean Booth
- Other clean room equipment and facilities
Directly linked to productivity and profit margins! Introducing the benefits of implementing our clean rooms in the manufacturing industry.
- Clean Booth
- Other clean room equipment and facilities
- Contract manufacturing
We provide high-quality and reasonably priced clean rooms! We design according to the needs of your site.
- Clean Booth
- Other clean room equipment and facilities
- Contract manufacturing
To everyone considering the introduction of a clean room! Please feel free to consult us about any concerns you have.
- Clean Booth
- Other clean room equipment and facilities
- Contract manufacturing
Part of the existing factory will be converted into a clean room! It is possible to significantly reduce initial costs for the construction.
- Clean Booth
- Other clean room equipment and facilities
- Contract manufacturing
Clean only the equipment with pinpoint accuracy! It is possible to reduce initial costs and running costs.
- Clean Booth
- Other clean room equipment and facilities
- Contract manufacturing
A tent type that can be used outdoors! It features both negative pressure and positive pressure specifications, which can be easily switched between.
- Clean Booth
- Other clean room equipment and facilities
- Contract manufacturing
A tent-type clean room has been installed in part of the factory! The process is shorter, and costs have been reduced.
- Clean Booth
- Other clean room equipment and facilities
- Contract manufacturing
Construction took 10 days, and the cleanliness level is Class 10,000! We received very positive feedback from our customers!
- Clean Booth
- Other clean room equipment and facilities
- Contract manufacturing
Yoshida Industries' cleanroom construction achievements! We received feedback that it is "comfortable to use."
- Clean Booth
- Other clean room equipment and facilities
- Contract manufacturing
The cleanliness level is class 10,000! We were able to complete the work in a short period of just 2 days!
- Clean Booth
- Other clean room equipment and facilities
- Contract manufacturing
The construction period is 1 day! The 0.5μm particles decreased from 408,000 to 34,600, achieving Class 100,000.
- Clean Booth
- Other clean room equipment and facilities
- Contract manufacturing
No installation work required! Air purification technology used in the aerospace field × high-performance HEPA filter!
- Ventilation and Exhaust
- Air purifiers
- Clean Booth