[Case Study] Sanwa Robotics Co., Ltd.
A case where "a 50% reduction in annual working hours" was achieved through the thorough implementation and refinement of work standards!
We would like to introduce a case where Sanwa Robotics Co., Ltd., which operates precision machinery and smart factory businesses, has implemented our "Roland DG Assemble." For many years, the company faced a significant challenge in thoroughly standardizing operations. After the implementation, clear numerical benefits have emerged, with on-site working hours reduced from 705 hours to 368 hours annually, a reduction of approximately 50%. Additionally, the dashboard is being utilized for analyzing work hours by employee. 【Case Overview】 ■Challenges - There are no rules for on-site operations - Work standards are not unified ■Benefits - On-site working hours reduced from 705 hours to 368 hours annually, approximately a 50% reduction - Established efficient worker methods as standards, visualizing and analyzing waste on-site *For more details, please download the PDF or feel free to contact us.
- Company:ローランド ディー.ジー. Roland DG Assemble 事業部
- Price:Other