Easy installation and removal of 【Pura Road】! High-strength temporary road materials.
The allowable load for long-term loading is 40 kN/m² or less! Introducing materials for a simple temporary road that can support T-25 traffic.
"Plaroad" eliminates the need for joints and connection fittings, allowing for manual installation and reducing construction time by 60%. It is lightweight, making transportation, installation, and removal easy. Being made of plastic, it can also be installed in rainy conditions. When not in use, its volume is reduced to one-third and its area to one-twenty-fifth, allowing for rapid installation of 50 to 60 m² per person per day. 【Features】 ■ Passable for T-25 ■ Allowable stress of 90 kN/m² (the allowable load for long-term loading in material storage areas, etc., is below 40 kN/m²) ■ Weight is approximately 6.5 kg per sheet ■ Easy transportation, installation, and removal ■ Made of plastic *For more details, please refer to the PDF document or feel free to contact us.
- Company:新舘建設
- Price:Other