We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction Method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction Method Product List and Ranking from 113 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Nov 26, 2025~Dec 23, 2025
This ranking is based on the number of page views on our site.

Construction Method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Nov 26, 2025~Dec 23, 2025
This ranking is based on the number of page views on our site.

  1. E&Dテクノデザイン Aichi//Testing, Analysis and Measurement
  2. 三和グランド Tokyo//Building materials, supplies and fixtures
  3. ラスコジャパン Hyogo//Building materials, supplies and fixtures
  4. 4 第一カッター興業 本社 Kanagawa//others
  5. 5 フクユー緑地 Fukuoka//others

Construction Method Product ranking

Last Updated: Aggregation Period:Nov 26, 2025~Dec 23, 2025
This ranking is based on the number of page views on our site.

  1. Foundation construction method without using concrete: "Screw Pile Foundation Method" フクユー緑地
  2. Mangle roll for textile machinery (steam-resistant) 朝日護謨工業所
  3. Permeable blast furnace slag paving material "Color Sand" 三和グランド
  4. Boarding-type scraper "HBS-2000" 第一カッター興業 本社
  5. 4 Designing office spaces! "Paintable zinc coating" ローバル

Construction Method Product List

166~180 item / All 350 items

Displayed results

[Construction Example] Food Factory 2nd Floor: Settlement Correction Work and Unevenness Correction Work

Correction of unevenness and settlement on a floor with a special structure! Resolving issues with cart operations caused by unevenness.

We would like to introduce a case of "settlement correction work and unevenness correction work" carried out on the second-floor slab of a food factory located in Kanagawa Prefecture. Unevenness occurred in the floor panels of the refrigerated room, causing issues with the movement of carts transporting goods, and the panels were being held down with anchors to suppress the unevenness. After the construction, the settlement in front of the entrance was resolved, and the floor panels' floating issue was also eliminated by filling the urethane layer with new urethane. 【Case Overview】 ■ Construction Area: 46.17m² ■ Maximum Settlement Amount: 42mm ■ Void Amount: 46.17 ■ Area: Kanagawa Prefecture ■ Construction Period: 4 days (including ancillary work) *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Factory: Ground Floor Settlement Correction Work

Materials and cargo are not stacking straight! Here are examples of how we corrected sinking and resolved issues.

Here is an example of "floor sinking correction work" carried out at a factory in Iwate Prefecture. At this factory, the floor had sunk due to ground subsidence, causing issues such as materials and cargo not stacking straight and forklifts being unable to access certain areas. The maximum subsidence was approximately 130mm, and the work was done over a large area of about 2000m2, completed in 16 days. 【Case Overview】 ■ Work Area: Approximately 2000m2 ■ Maximum Subsidence: Approximately 130mm ■ Maximum Void: Approximately 80mm ■ Area: Iwate Prefecture ■ Construction Period: 16 days *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Office/Parts Storage: Settlement Correction Work

No interruption in operations, correction of subsidence! Introducing a case where the floor level was adjusted and the gaps in the walls were improved.

We would like to introduce a case of "settlement correction work" carried out at the office and parts warehouse of an automobile manufacturer located in Hokkaido. In this company, the building had tilted due to settlement, causing issues with the opening and closing of doors and creating gaps in the ceiling. Therefore, the Upcon method was adopted because it could be implemented without stopping operations and within a short construction period. After the work was completed, the floor levels throughout the office and parts warehouse were corrected, and the gaps in the walls that had existed before the construction were also improved. 【Case Overview】 ■ Construction Area: 345m2 ■ Maximum Settlement: 63mm ■ Maximum Gap: 70mm ■ Area: Office of an automobile manufacturer located in Hokkaido ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Distribution Station: Floor Slab Settlement Correction / Underfloor Void Filling Work

Due to the extensive area of the modifications, the construction was carried out in several phases!

We would like to introduce a case of "floor sinking correction" and "underfloor void filling work" carried out at a distribution station of a product manufacturer located in Niigata Prefecture. Due to consolidation settlement, various areas within the station showed signs of sinking and sagging, prompting the adoption of the Upcon method, which allows for quick corrections. Since the area requiring correction was extensive, we utilized weekends during business shutdowns to divide the construction period and carry out the work. [Case Overview] ■ Construction Area: Approximately 1,460m2 ■ Maximum Settlement: 103mm ■ Maximum Void: 90mm ■ Area: Distribution station of a product manufacturer in Niigata Prefecture ■ Construction Period: 8 working days (Note: Construction was carried out in several phases) *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Large Product Storage Warehouse: Floor Slab Settlement Correction Work / Construction in 2010

Adopting the up-con method for short-term intensive repairs! Construction carried out to accommodate multiple plant vehicles.

We would like to introduce a case of "floor sinking correction work" conducted at a large product storage warehouse in Ibaraki Prefecture. Due to ground subsidence, the stacked cardboard boxes were leaning. For concentrated repairs over a short period, the Upcon method was adopted, and our company carried out the work with multiple plant vehicles. 【Case Overview】 ■ Construction Area: Approximately 2,000m2 ■ Maximum Subsidence: 110mm ■ Area: Large product storage warehouse in Ibaraki Prefecture ■ Construction Period: 6 days (Day 1: 4 vehicles, Days 2-6: 2 vehicles for construction) *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Supermarket: Floor Deflection Correction / Settlement Correction Work

Correction during nighttime while business is suspended! A case of correcting floor sagging due to ground subsidence in a short construction period.

We would like to introduce a case of "floor deflection correction" and "settlement correction work" carried out at a certain supermarket in Ibaraki Prefecture. The customer in this case was troubled by the floor inside the store being deflected due to settlement. Using the Upcon method, the work was conducted only at night, with minimal impact on business. The work was completed in a short period of two days without closing the store. 【Case Overview】 ■ Construction Area: Approximately 450m2 ■ Maximum Settlement Amount: Approximately 83mm ■ Area: Ibaraki Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF materials or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Game Center: Earthquake Recovery Work / Floor Slab Settlement Correction Work

Due to the impact of the China-Vietnam earthquake, part of the floor inside the store has sunk! Case study of sinking correction work at a game center.

We would like to introduce a case where "disaster recovery construction" and "floor sinking correction work" were carried out at a game center located along a national highway in Niigata Prefecture. In this case, part of the floor inside the store sank due to the effects of the Chuetsu earthquake. As it was possible to correct the sinking in a short period, our company was requested to perform the sinking correction. The sinking was corrected using the Upcon method with rigid polyurethane foam. The construction was completed in one day. 【Case Overview】 ■ Area of sinking correction: Approximately 83m2 ■ Maximum sinking amount: -77mm ■ Planned correction value: Within 16mm ■ Area: Niigata Prefecture ■ Construction period: 1 day *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Drugstore: Settlement Repair Work (Niigata Prefecture)

Floor sagging due to ground subsidence! A case of straightening the floor before store renovation.

Here is a case study of "settlement correction work" conducted at a drugstore in Niigata Prefecture. In this case, the store's floor had sagged due to settlement. At the time of the store renovation, they wanted to correct the floor to make it level, and our Upcon method was adopted. The construction area was approximately 1500m2. Using the concrete replacement method, a project that typically takes one month was completed in just four days. (Settlement amount approximately 100mm) 【Case Overview】 ■ Construction Area: Approximately 1500m2 ■ Maximum Settlement Amount: Approximately 100mm ■ Area: Drugstore in Niigata Prefecture ■ Construction Period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Toy Retail Store / Electronics Retail Store: Earthquake Recovery / Floor Settlement Correction Work

Due to the impact of the Great East Japan Earthquake, the floor inside the store has significantly sunk! There have been cases where gaps have formed between the floor and the walls, as well as between the walls and the ceiling.

We would like to introduce a case of "earthquake recovery construction" and "floor subsidence correction work" carried out at a toy retail store and an electronics retail store in Fukushima Prefecture. Due to the impact of the Great East Japan Earthquake, the floor inside the toy retail store sank significantly. As a result of the floor subsidence, gaps were observed between the floor and walls, as well as between the walls and ceiling. Therefore, an up-con method that can be corrected during the night while the store is closed was adopted, and our company carried out the correction work. Additionally, since there were voids under the floor, we also implemented void filling work by injecting polyurethane resin into the gaps. 【Case Overview】 ■ Construction Area: Approximately 2,300m2 ■ Maximum Subsidence: 144mm ■ Area: Fukushima Prefecture ■ Construction Period: Continuous 11 nights (2012) *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Shopping Center: Subfloor Settlement Correction Work

Due to consolidation settlement, the floor has sunk over a wide area inside the store! A gap has occurred between the floor and the wall.

We would like to introduce a case of "subfloor sinking correction work" and "subfloor void filling work" carried out at a shopping center in Iwate Prefecture. Due to consolidation settlement, sinking was observed over a wide area of the floor. As a result of the floor sinking, gaps appeared between the floor and walls, causing various issues throughout the store. An Upcon method that could be corrected during the night while the store was closed was adopted, and our company performed the corrections. Additionally, since voids and cavities were also observed under the floor, void filling work using urethane was carried out as well. [Case Overview] ■ Construction Area: Approximately 540m² ■ Maximum Settlement Amount: 71mm ■ Maximum Void Amount: 190mm ■ Area: Iwate Prefecture ■ Construction Period: Continuous 7 nights *For more details, please refer to the PDF materials or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Supermarket: Subfloor Settlement Correction Work (Gifu Prefecture)

Floor subsidence due to weak ground! Introducing a case where repairs were made during nighttime while the business was closed.

We would like to introduce a case of "subfloor sinking correction work" carried out at a large supermarket located in Gifu Prefecture. A large portion of the backroom and store interior had sunk, causing gaps to appear between the floor and walls due to the floor sinking, resulting in various issues throughout the store. An Upcon method that can be corrected during the night while the store is closed was adopted, and our company performed the corrections. 【Case Overview】 ■ Construction Area: Approximately 700m2 ■ Maximum Sinking Amount: 85mm ■ Area: Gifu Prefecture ■ Construction Period: Continuous 5 nights (2013) *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Leisure Facility: Subfloor Settlement Correction Work (Ibaraki Prefecture)

Due to the impact of the Great East Japan Earthquake, subsidence occurred! Adjustments of 350m2 were made over four consecutive nights of construction.

Here is a case study of "subfloor sinking correction work" conducted at a leisure facility in Ibaraki Prefecture. We carried out correction work for a significantly sunken floor in the pachinko area within the facility. Sinking was also observed in other areas, including in front of the machine room and in the restrooms, and we performed sinking correction work over a total construction area of approximately 350m2 over four consecutive nights. [Case Overview] ■ Construction Area: Approximately 350m2 ■ Maximum Sinking Amount: 93mm ■ Area: Ibaraki Prefecture ■ Construction Period: Four consecutive nights (2011) *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Large Pachinko Parlor: Subfloor Settlement Correction Work (Miyagi Prefecture)

Significant damage from the Great East Japan Earthquake! Introducing a case of subsidence correction with a maximum subsidence of 112mm.

Here is a case study of "subfloor sinking correction work" conducted at a large pachinko parlor located in Miyagi Prefecture. The large pachinko parlor suffered significant damage due to the Great East Japan Earthquake. Extensive renovation work was carried out for a swift reopening. Sinking also occurred in the store's flooring, and the Upcon method, which allows for quick corrections, was adopted. Our company implemented the floor sinking correction by injecting urethane resin under the subfloor, successfully correcting all areas within the construction scope, including a section that had sunk by a maximum of 112mm, to within the planned values. [Case Overview] ■ Construction Area: Approximately 230m2 ■ Maximum Sinking Amount: 112mm ■ Area: Miyagi Prefecture ■ Construction Period: 1 day (2011) *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Earthquake-Induced Settlement Repair Work (Miyagi Prefecture)

Addressing the sinking of slab foundation houses due to earthquakes in a short construction period! A case where all areas were corrected to within -10mm.

We would like to introduce a case of "settlement correction work" for a slab foundation house located in Sendai City, Miyagi Prefecture. Due to the impact of an earthquake, there was significant settlement from the bedroom towards the entrance. Cracks and gaps appeared in the columns and stairs of the entrance porch. All points, including a maximum settlement of 73mm, were corrected to within -10mm. 【Case Overview】 ■ Construction Area: Approximately 80m² ■ Construction Period: 2 days ■ Maximum Settlement Amount: 73mm *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Settlement Correction Work (Tottori Prefecture)

No need for large-scale demolition work! Here we present a case where a settlement of up to 46mm was corrected.

Here is an example of "settlement correction work" carried out on a slab foundation house in Unnan City, Tottori Prefecture. Due to a maximum settlement of 46mm observed, resin was injected under the slab foundation to implement the correction. The company was chosen because the correction could be made without large-scale demolition work or moving. 【Case Overview】 ■ Construction Area: Approximately 106m2 ■ Maximum Settlement Amount: 46mm ■ Area: Unnan City, Tottori Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration