46~84 item / All 84 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us OnlineBefore making an inquiry
Download PDF46~84 item / All 84 items
We would like to introduce a case from a customer who plans to paint the walls of the packaging area in their factory within the half-year budget. Immediately after receiving the request, we visited the site with the painting contractor to conduct an on-site survey to determine the extent of the area to be painted and to check for repair spots and cracks. We submitted an estimate for painting an area of 300m2 with two coats, as well as for hole repairs and crack repairs. Additionally, at the customer's request to change the wall color, we mixed the desired color from the color sample book and carried out the construction. [Case Overview] ■ Industry: Medical Manufacturer ■ Target: Factory Interior Walls ■ Request Details: Wall Painting and Repairs ■ Construction Duration: 1 Day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Nakasei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from the customer stating, "There is currently one noren curtain installed in the factory, but we would like to install another noren curtain at a different entrance." First, we will ask the customer for details and confirm the existing noren curtain and the new location where they want to install it. After presenting the estimate, we received feedback that the expected cost was lower than anticipated, leading to the order being placed. The installation of the corner pipe for the net, attachment of the stainless steel net, installation of the noren curtain, and confirmation after completion took approximately just over 4 hours to complete. [Case Overview] ■ Industry: Chemical Manufacturing ■ Request Details: Installation of Noren Curtain and SUS Screen Door ■ Construction Duration: 1 Day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where a customer expressed concerns about feeling that efficiency was declining and requested maintenance for their cooling tower. Our company, in collaboration with a sales representative from Kuken Industries, the manufacturer of the cooling tower, visited the site to inspect the actual equipment. It was noted that dirt had accumulated on the cooling tower, which was believed to be the cause of the decreased efficiency. Subsequently, we joined the construction team to carry out the cleaning. We successfully removed the dirt and completed the work. [Case Overview] ■ Industry: Manufacturing ■ Request Details: Cooling Tower Cleaning Request ■ Work Duration: Approximately 2 weeks *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer who was concerned about heat dissipation from the exposed pump section, even though the piping was insulated. After discussing the customer's needs, we proposed insulation using a fine jacket. We confirmed that it could be installed without any issues in the requested location. The customer also appreciated that the installation method using Velcro allows for easy removal and reattachment during maintenance. 【Case Overview】 ■ Industry: Chemical Manufacturing ■ Subject: Piping Work ■ Request: Insulation for the Pump Section ■ Work Details: Measurement 0.5 days, Installation 0.5 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where we received a cleaning request from a customer stating, "The U-shaped drainage on the premises has become difficult to pass due to increased water levels from recent heavy rain, and it is causing problems." We visited the site with our partner company and removed the covers of the drainage to investigate where leaves and other debris were causing the water levels to rise, and to confirm the extent of the cleaning work needed. On the day of the work, we removed all the covers and grates of the drainage within the designated area and removed the soil that was clogged in the gaps of the covers. The area covered was approximately 13 meters, and the work was completed in about 2 hours. 【Case Overview】 ■ Industry: Manufacturing ■ Subject: Drainage on the premises ■ Request: Cleaning work ■ Work details: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Nakasei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request for leak prevention from a customer who is troubled by rainwater dripping through the factory window glass. The customer requested, "We would like you to come for a site survey as we have decided to apply caulking this time," so I immediately contacted a construction contractor to have them come to the site. Due to the complex shape of the factory, there are areas where high-altitude work vehicles are difficult to access, and there is a possibility that other construction work may be ongoing simultaneously. We had detailed discussions with the customer to coordinate the schedule and determine how to proceed with the construction. [Case Overview] ■ Industry: Food Factory ■ Target: Maintenance Work ■ Request Details: Leak Prevention ■ Construction Duration: Approximately 4 days *For more details, please refer to the PDF materials or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer who is concerned that 'we have introduced a new baking furnace, but there is equipment handling nitric acid next to it, and if no measures are taken, the baking furnace will corrode.' We confirmed the situation and dimensions on-site, and discussed with the customer to verify the installation location and specifications. As a response, there were pipes running through the installation area, so we processed the piping to ensure it would not be affected by the partition installation. Additionally, we implemented slit processing on the partition in the areas where contact would occur. [Case Overview] ■ Industry: Automotive parts manufacturing ■ Subject: Maintenance construction ■ Request: Installation of a partition ■ Construction details: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration"We had been applying layers ourselves until now, but they quickly peeled off, and no matter how much we painted, it felt endless." This is a case we received from a customer who was troubled and requested floor renovation. We addressed the unevenness with putty and leveling, finishing with a thick epoxy resin layer. Additionally, by applying a UV coating, the surface becomes less prone to dirt and easier to clean, making it suitable for maintaining aesthetics. This time, we finished with a non-slip matte surface, ensuring safety even in the presence of oil and moisture. 【Case Overview】 ■ Industry: Metal processing ■ Focus: Floor renovation and aesthetic maintenance ■ Request: Floor renovation and aesthetic maintenance ■ Work details: 2 days for floor coating, 1 day for UV coating *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer to install a foreign object prevention cover on the conveyor for product containers. Immediately after receiving the request, we conducted a confirmation process on-site. We measured the dimensions of the product container and the receiving outlet in advance and began the construction. By enclosing the conveyor on all sides with acrylic panels, we prevent foreign object intrusion from all directions while also allowing for visual confirmation of foreign objects through the use of acrylic panels. [Case Overview] ■ Industry: Automotive parts ■ Target: Conveyor ■ Request Details: Installation of foreign object prevention cover ■ Construction Duration: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationDust generated during work is causing issues, and we received a request from a customer to "install a dust cover to allow the dust collector to suck up the dust." Immediately after receiving the request, we conducted a confirmation work on-site. We introduced past construction examples, selected the framework and sheets, and submitted the completed design along with the corresponding estimate. Subsequently, we carried out the installation work on-site according to the completed design. [Case Overview] ■ Industry: Parts processing ■ Target: Dust collector ■ Request details: Installation work for the dust cover around the dust collector ■ Construction details: 1 day (3 weeks after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case of repairing an overseas-made compressor that we were commissioned to handle. The customer was struggling with the inability to perform maintenance on the overseas manufacturer's compressor outside of the manufacturer's service, facing delays and high costs. Therefore, our partner company took on the maintenance, proceeding while confirming with the customer based on the manual. Additionally, we obtained a supervisor license to carry out work on-site, ensuring a thorough safety system. 【Case Overview】 ■ Industry: Semiconductors ■ Subject: Overseas-made compressor ■ Request: Repair of overseas-made compressor ■ Construction Duration: 3 to 5 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where we received a request for repairs to equipment used to crush one-gallon cans for raw material storage at a chemical manufacturer. The customer stated, "The hydraulic cylinder is likely broken and is in a dangerous condition, so I would like it fixed urgently." Our representative visited the site to confirm the situation. The manufacturer that produced the original cylinder is no longer in production and cannot perform repairs, so we took on the task of restoring the functionality of the equipment. Based on the maximum output and operating stroke of the hydraulic cylinder that had been used, we selected a new hydraulic cylinder. 【Case Overview】 ■ Industry: Chemical Manufacturer ■ Subject: Hydraulic Cylinder ■ Request: Hydraulic Cylinder Repair ■ Work Details: 1 Day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe customer was planning to introduce new equipment in the factory to respond to increased production, and was considering measures to ensure that they could handle any troubles that might arise. Their request was, "We want to connect the separate pipes currently in use into one system so that even if one side stops, we can supply water from the other pipe, allowing us to keep the equipment running." To achieve this, we connected the PVC and white pipes at the junction points using flanges. Additionally, considering future uses, we installed ball valves to allow each pipe to be used independently while consolidating the piping. [Case Overview] ■ Industry: Electronic Components Manufacturing ■ Subject: Piping ■ Request: Piping Construction ■ Work Details: 1 day (1 week after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of additional work involving proximity sensors for a cleaning device. The customer was considering installing a sensor that would prevent operation when the door is open while the device is powered on, as a safety measure, or whether it could be set to emit a sound. We discussed the requested details and budget with the customer, and based on that information, we visited with our partner company to select the appropriate sensors. We secured the order within the customer's budget. It took about three weeks from receiving the order to the arrival of the product, and the work on the day of installation was completed without any issues in approximately four hours. 【Case Overview】 ■ Industry: Semiconductor ■ Target: Cleaning Device ■ Request: Implement safety measures ■ Construction Details: 1 day (3 weeks after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is a case where we received a consultation regarding the maintenance of a blower attached to production equipment. "We hadn't used the equipment for a while, so to be safe, we turned on the power early the next morning to use it, but we heard an unusual noise from the blower. We are concerned that it might be dangerous to use it as is, and we would like you to check it immediately," was the inquiry we received by phone. Since there was no backup equipment and production would be delayed without this blower, they urgently requested assistance. We rushed to the site to check the blower. The blower itself was light enough to be removed, so we took it to a cooperating contractor's factory for inspection. It was determined that there was an issue with the motor bearing, and we replaced the motor bearing. [Case Summary] ■ Industry: Manufacturing ■ Subject: Turbo Blower ■ Request: Blower Maintenance ■ Work Duration: 1 Day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer stating, "When we received the pump from Ebara Corporation that we purchased recently, we rearranged the existing pumps and installed the new pump ourselves, but we are experiencing vibrations and would like to improve this urgently." To determine whether we can proceed with maintenance urgently, we first called the contractor to explain the pump's manufacturer, model, serial number, the symptoms occurring, and the situation during installation, in order to identify the cause of the malfunction and the faulty parts. After confirming that maintenance could be scheduled for the weekend, we provided a quotation and proceeded with the replacement of the coupling and coupling bolts. [Case Overview] ■ Industry: Residential Equipment Industry ■ Subject: Pump Maintenance ■ Request Details: Resolution of pump vibration issues ■ Work Details: 1 day (1 week after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is a case study of a conveyor belt replacement project that we were commissioned to undertake. The customer requested, "I don't know what we are currently using, so I would like assistance with selection," and "Since we cannot stop the conveyor all day during the work, I would like to schedule the work for the afternoon." As soon as we received the request, we promptly sent craftsmen to the site to confirm the details and make proposals. Although time was limited, we were able to respond smoothly by having a pre-meeting, and we completed the work within the timeframe requested by the customer. 【Case Overview】 ■ Industry: Food Manufacturing ■ Subject: Conveyor ■ Request Details: Belt Replacement Work ■ Construction Details: 1 Day (1 week after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, North and Central Kisei regions (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case of jacket tank repair work that we were commissioned to undertake. We received a message from the customer stating, "This is the same tank that was repaired before, but there is a pinhole in a different location causing a water leak, so I would like it fixed." We immediately contacted a contractor who could perform welding work. The contractor was able to come to the site on the same day, so we coordinated a time with the customer for a site inspection. We discussed the plan to weld putty over the pinhole to prevent water leakage. After the work was completed, the customer confirmed the repaired welding area, and the job was finished. 【Case Overview】 ■ Industry: Food Factory ■ Subject: Jacket Tank ■ Request Details: Tank Welding Repair Work ■ Work Duration: 1 Day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from the customer to install a simple roof to prevent physical water droplets from falling on the production line as a condensation countermeasure. Additionally, there were requests such as "I would like the installation to be done without drilling holes and securing with bolts, or making any modifications to the equipment," so we conducted a site survey with the design and construction company and held a meeting with the customer to brainstorm ideas on-site. We proposed a custom socket with a shape that would not easily come off when installed, and by fitting that socket, we suggested creating a support structure to attach the roof, and we received the request. 【Case Overview】 ■ Industry: Food ■ Target: Conveyor ■ Request Details: Installation of a roof for the conveyor ■ Construction Duration: 14 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe customer regularly performed high-pressure cleaning of the heat exchanger panels, but they wanted their employees to focus on the crucial manufacturing line and did not want to assign them to cleaning tasks as overtime. Therefore, our company arranged for a contractor to observe the cleaning process on a day when employees were involved, confirming that the work could be carried out, and submitted a quotation. After cleaning 32 panels, we opened the valves to check for any water leaks before concluding the work. [Case Summary] ■ Industry: Textiles ■ Subject: Heat Exchanger ■ Request: Cleaning of heat exchanger panels ■ Work Details: Half a day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is a collection of case studies summarizing common issues encountered in manufacturing sites, their solutions, and subsequent customer feedback. It introduces completed products made from various materials such as metal, resin, and glass through custom processing, along with photographs. 【Do you have any of these issues? (Excerpt)】 ■ I want a whiteboard with my desired printing and a dedicated stand... ■ I have a funnel with a male thread, but I want to attach a valve, and the thread specifications don't match... ■ The desired display plate does not exist as a standard product... □■□ The case study collection reveals 37 cases all at once. □■□ * Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie) * For the case study collection of custom processed products, please view the PDF data from the download.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an introduction to examples of maintenance and construction work. At Sakashige, we carry out maintenance and construction for production facility equipment, as well as for company buildings and factories. 【Do you have any of these problems?】 ■ I want to quickly and cheaply repair a broken rain gutter... ~ We respond urgently. Repairs at low cost with minimal parts replacement. ~ * Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie) * For examples of custom processed products, please view the PDF data available for download.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an introduction to customized examples of safety and dust control measures. At Sakashige, we implement safety and dust control measures tailored to the equipment in production sites, as well as to the workers and work environment. 【Do you have any of these concerns?】 ■ Forklifts frequently run, and it's dangerous when people suddenly appear, so we want to take measures... ■ We want to introduce a printer that dislikes dust, but we also want to implement safety measures... *Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie) *Please view the case studies of custom-made products in the PDF data available for download.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an introduction to customization examples of vinyl chloride and aluminum composite panels. At Sakeju, we specialize in custom manufacturing various materials tailored to the equipment in production sites, as well as the needs of workers and the working environment. 【Do you have any of these concerns?】 ■ Currently, we are using mesh pallets with invoice holders, but there are issues with strength and convenience, so we would like them made to our desired specifications... ■ We want to create a sign for valve operation procedures... *Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie) *Please view the PDF data of custom processing examples available for download.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an introduction to custom processing of punching metal and custom manufacturing of distance pieces. At Sakeju, we offer custom manufacturing of various products and jigs tailored to the production site equipment, as well as the workers and work environment. 【Do you have any of these concerns?】 ■ I want to create metal processing in Mie while discussing face-to-face... ■ I want you to make distance pieces for the production line, but I want to achieve precision at this size... *Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie) *Please view the PDF data of the case studies for custom processed products available for download.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is a case study of custom manufacturing for pipe joints and stands for whiteboards. At Sakashige, we specialize in custom manufacturing various products and jigs tailored to the equipment in production environments, as well as to the needs of workers and work environments. 【Do you have any of these issues?】 ■ I want a custom print on a whiteboard and a dedicated stand... ■ I have a funnel with a male thread and want to attach a valve, but the thread specifications are different and it won't fit... *Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie) *Please view the PDF data of case studies for custom processed products available for download.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is a case introduction for custom manufacturing of display plates and belt roller jigs. At Sakashige, we provide custom manufacturing of various products and jigs tailored to the production equipment on-site, as well as to the workers and work environment. 【Do you have any of these issues?】 ■ The desired display plate does not exist as a standard product... ■ We are relying on another company, but there are issues with delivery times and prices... *Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie) *Please view the PDF data of custom processing case studies available for download.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an introduction to custom manufacturing examples of work jigs and partition blocks. At Sakashige, we provide custom manufacturing of various products and jigs tailored to the production site equipment, as well as the needs of workers and the work environment. 【Do you have any of these concerns?】 ■ We want to maintain the precision of parts. We would like the actual measurements to be taken and delivered... ■ We want to stabilize tools by placing partition boards in the toolbox... *Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie) *Please view the PDF data of custom processing examples available for download.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is a case study of custom manufacturing of spiral stirring rods and bearing insertion jigs. At Sakashige, we specialize in custom manufacturing various products and jigs tailored to the production equipment on-site, as well as the needs of workers and the working environment. 【Do you have any of these concerns?】 ■ I want to ensure the accuracy of the parts. I want the actual measurements to be taken and delivered... ■ I want to stabilize tools by placing a partition board in the toolbox... ■□■ Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie) ■□■ *Please view the PDF data of case studies for custom processing from the download section.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an introduction to a custom-made stainless steel seal pot and beaker cleaning tongs. At Sakashige, we specialize in custom manufacturing various products and tools tailored to the production environment, workers, and working conditions. 【Do you have any of these concerns?】 ■ If only there were a seal pot that separates moisture and gas... ■ I want to clean beakers with chemicals without using my hands... ■□■ Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie) ■□■ *Please view the PDF data of custom processing case studies available for download.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an introduction to custom manufacturing examples of PVC power covers and composite jigs made of resin and metal. At Sakashige, we offer custom manufacturing of various products and jigs tailored to the equipment in production sites, as well as to the needs of workers and work environments. 【Do you have any of these concerns?】 ■ I want to implement safety measures for the power supply section, but there are no suitable off-the-shelf products... ■ I want to create jigs using various materials, but there is no place where I can order them all at once... ■□■ Key service areas: Mie Prefecture, Hokusei District, Chusei District (around Mie) ■□■ *Please view the PDF data of custom processing examples from the download section.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is a case study of custom-made transparent vinyl shelves and metal insertion jigs. At Sakashige, we specialize in custom manufacturing various products and jigs tailored to the needs of production facilities, workers, and work environments. 【Do you have any of these concerns?】 ■ I want a shelf that can be seen from the outside. I want to organize... ■ I need a jig that fits objects of different dimensions... ■□■ Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie) ■□■ *Please view the PDF data of case studies for custom processing from the download section.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an introduction to a case study of custom manufacturing of SUS covers and POM roller conveyor jigs. At Sakashige, we specialize in custom manufacturing various products and jigs tailored to the equipment in production sites, as well as to the needs of workers and the working environment. 【Do you have any of these concerns?】 ■ I want to add a cover to the exhaust duct, but there’s nothing that fits... ■ I would like a special version of a manufacturer’s genuine product with different specifications... ■□■ Key Service Areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie) ■□■ *Please view the PDF data of the case studies for custom processed products from the download section.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is a case introduction for custom production of SUS workbenches and device slide cards. At Sakashige, we specialize in custom manufacturing various products and jigs tailored to the needs of workers and work environments, starting from equipment in production sites. 【Do you have any of these concerns?】 ■ The current workbench is inefficient, so I want a dedicated workbench suited for its intended use... ■ I would like to have a slide card made with the TATAI Bar Ultra Slide... ■□■ Key Service Areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie) ■□■ *Please view the PDF data of the case collection for custom processed products from the download section.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is a case introduction for custom manufacturing of stainless steel mesh strainers and receiving rollers. At Sakashige, we carry out custom manufacturing of various products and jigs tailored to the production site equipment, workers, and work environment. 【Do you have any of these concerns?】 ■ I am using a rectangular strainer but would like a semi-circular one with specified dimensions... ■ I want to obtain PEEK manufacturing rollers at a low cost... ■□■ Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie) ■□■ *Please view the PDF data of the case studies for custom processed products from the download section.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an introduction to custom-made stainless steel funnels and neoprene rubber bands for tanks. At Sakashige, we specialize in custom manufacturing various products and jigs tailored to the equipment in production sites, as well as the needs of workers and work environments. 【Do you have any of these concerns?】 ■ I would like to recreate glass items in SUS for safety reasons... ■ I don't know where to obtain white neoprene rubber bands... ■□■ Key Service Areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie) ■□■ *Please view the PDF data of our case studies for custom processing from the download section.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an introduction to custom-made stainless steel nozzles and piping covers. At Sakashige, we specialize in custom manufacturing various products and jigs tailored to the needs of production facilities, workers, and work environments. 【Do you have any of these concerns?】 ■ I want a SUS nozzle, but there are no manufacturers that can create it... ■ The piping is exposed, and I want to implement safety measures... ■□■ Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie) ■□■ *Please view the PDF data of custom processing case studies available for download.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an introduction to examples of custom manufacturing of stainless steel plate processing and PET device covers. At Sakashige, we specialize in custom manufacturing various products and jigs tailored to the equipment in production sites, as well as the needs of workers and the working environment. 【Do you have any of these concerns?】 ■ I want to cover the machine with stainless steel... ■ I would like to replicate from the actual item since there are no drawings... ■□■ Key Service Areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie) ■□■ *Please view the PDF data of case studies for custom processed products from the download section.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is a case study of custom manufacturing for pipe joints and stands for whiteboards. At Sake-shige, we specialize in custom manufacturing various products and jigs tailored to the needs of production equipment, workers, and work environments. 【Do you have any of these problems?】 ■ I want a whiteboard with my desired printing and a dedicated stand... ■ I have a funnel with a male thread and want to attach a valve, but the thread specifications are different and it won't fit... *Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie) *Please view the PDF data of case studies for custom processed products available for download.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration