List of Process Control System products
- classification:Process Control System
166~180 item / All 1526 items
For those who have isolators. Achieving high chemical resistance and workability. Low cost and short delivery times are also possible for glove box and isolator gloves.
- Work gloves
Notice of participation in 'INTERPHEX Week Tokyo' from May 20 (Wednesday) to May 22 (Friday), 2026.
Ito Corporation will be exhibiting at "INTERPHEX Week Tokyo" held at Makuhari Messe. This exhibition is the largest in Japan, showcasing a wide range of products and services related to the research and manufacturing of pharmaceuticals, cosmetics, and regenerative medicine from 25 countries and regions around the world. Pharmaceutical and cosmetic manufacturers, as well as regenerative medicine companies, will be attending from all over the globe. We will be showcasing "Gloves for Glove Boxes/Isolators" manufactured by Tron Power. We look forward to your visit.
Customizable settings to meet customer challenges and needs! Highly flexible application!
- Process Control System
28 inches, equipped with Elkhart Lake Atom/Celeron CPU, high brightness 1,000 cd/m², railway standard EN50155
- Sales Management
- Process Control System
- Industrial PCs
37.6 inches, Elkhart Lake Atom/Celeron CPU, high brightness 1,000 cd/m², railway standard EN50155
- Sales Management
- Process Control System
- Industrial PCs
LITEMAX, 48.5 inches, equipped with Apollo Lake Atom CPU, ultra-high brightness 3,000 cd/m2, fully waterproof IP65.
- Sales Management
- Process Control System
- Industrial PCs
Approximately 70% reduction in communication costs for shift changes via phone! Significant efficiency improvements in communication tasks for controllers and security personnel have been achieved.
- Process Control System
Introduction of the case study for the security industry control system "Daily Report 365 for Security".
Our company has implemented the security management system "Daily Report 365 for Security" for Kyokuto Security Co., Ltd., which primarily operates in the Tokyo metropolitan area. The company undertakes a wide range of operations, including office buildings, hospitals, factories, apartments, and government facilities. However, communication for the shift changes of security personnel was done via phone, which could be challenging at certain times. After the implementation of this system, phone costs were reduced by approximately 70%, and security personnel who did not send email timestamps for departures and shift changes are alerted, allowing the control officers to respond without missing anything. [Effects after implementation] - Security personnel who do not send email timestamps for departures and shift changes are alerted, enabling control officers to respond without oversight. - Communication is handled through email exchanges, eliminating inefficiencies such as "unable to connect by phone" and "work hindered by phone responses." - Approximately 70% of the costs associated with phone communication have been reduced. *For more details, please contact us or download the materials from the link below.
Streamlining daily and monthly data aggregation makes work smoother! The ability to manage not only in-house costs but also outsourced labor costs from partner companies is a major attraction.
- Process Control System
[Case Study Release] Streamlining Daily and Monthly Data Aggregation for Smoother Operations! / Kudo Construction Industry Co., Ltd.
We have published a case study on the introduction of the daily report and attendance management system "Daily Report 365" to Kudo Construction Co., Ltd., which primarily engages in subcontracting work for structural bodies, reinforcing bar work, formwork work, and scaffolding and earthwork. Due to the expansion of their business scale, the company has broadened its scope of contracted work, requiring a significant amount of time for administrative tasks such as daily reports and attendance management. After implementing the system, data is automatically aggregated, eliminating the need for re-entry and leading to a reduction in work hours. 【Customer Challenges】 ■ The number of workers and sites is vast, making it time-consuming to aggregate and verify daily and monthly data, placing a heavy burden on the aggregation staff. ■ They want to simplify the management of outsourced labor costs. ■ They want to prevent omissions caused by data transcription. *For more details, please refer to the PDF document or feel free to contact us.
By sharing handwritten daily report photos, the travel time to submit reports is reduced to zero! Achieving efficiency between the field and the office.
- Process Control System
Introduction of the daily report and attendance system "Nippo 365" for the construction industry (Case study of Otani Sogyo).
Our company has implemented the daily report and attendance system "Daily Report 365" for Ohtani Sogyo Co., Ltd., which is based in Matsuyama City, Ehime Prefecture, and conducts temporary construction work, dismantling, and rental of temporary materials nationwide. The company wanted to streamline arrangements and attendance management as it expanded its operations. After the implementation of the system, arranging workers became easy with drag-and-drop functionality, and attendance aggregation was automatically compiled into Excel, making it convenient. Additionally, by having supervisors take pictures of handwritten daily reports with their smartphones and send them, the time spent submitting daily reports to the office has been reduced to zero. [Effects After Implementation] ■ Arranging workers is easy with drag-and-drop ■ The automatically compiled attendance sheet can be conveniently output to Excel ■ Daily report submission is as simple as uploading a handwritten report ■ Travel time for submitting daily reports has been reduced to zero *For more details, please contact us or download the materials from the link below.
First, systematize analog communication and management! Then, enable unique personnel arrangements through customization.
- Process Control System
For those struggling with "work quality" and "skill transfer" on-site. We are currently offering a leaflet featuring case studies of customers who have reduced annual work on-site by 50%!
- Process Control System
Obtain accurate work hour information consistent with work performance! Analyze "Work Log" to promote productivity improvement.
- Process Control System
A thorough explanation of on-site reforms utilizing "voice input solutions"! We will also introduce numerous successful cases of reducing work hours, cutting personnel, and improving operational effic...
- Process Control System
The first step of DX (Digital Transformation) in the manufacturing industry is the timely collection of on-site data through voice and its utilization.
- Process Control System
There are still many handwritten records on paper in the factory, and by using voice input, work efficiency has improved ninefold, with input errors reduced to one-seventh!
- Process Control System
Are you giving up on voice input due to noise in factories or on-site? Data entry via voice is possible even in noise environments of around 90 dB.
- Process Control System