We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for CAD.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

CAD Product List and Ranking from 150 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Jan 14, 2026~Feb 10, 2026
This ranking is based on the number of page views on our site.

CAD Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jan 14, 2026~Feb 10, 2026
This ranking is based on the number of page views on our site.

  1. 進和電機 Aichi//Consumer Electronics
  2. i CAD - 機械設計向け3DCAD(3次元CAD)開発元 - Tokyo//CAD/CAM
  3. ECAD Solutions Co., Ltd. Saitama//CAD/CAM
  4. 4 Design Creation Inc. Tokyo//software
  5. 5 エーディーディー Kyoto//software

CAD Product ranking

Last Updated: Aggregation Period:Jan 14, 2026~Feb 10, 2026
This ranking is based on the number of page views on our site.

  1. Electrical design CAD 'Unidraf X / Unidraf G' 進和電機
  2. 2D3D Integrated CAD CADPAC-CREATOR [Free Trial Version] Design Creation Inc.
  3. 3D CAD for Aluminum Products 'apdX' SUS
  4. 4 [Mechanical Design] Free 3D CAD Seminar for Mechanical Devices and Production Equipment i CAD - 機械設計向け3DCAD(3次元CAD)開発元 -
  5. 5 Socia partition CAD data ソシアパーティション (旧 株式会社コマツパーティション)

CAD Product List

121~150 item / All 541 items

Displayed results

On-site poured concrete BIM software Tekla Structures

Structural BIM software 'Tekla Structures' enables efficient concrete pouring planning and on-site concrete construction.

"Tekla Structures" improves the productivity and quality of concrete placement planning and on-site concrete construction. ◆ The patented features specifically designed for on-site concrete work promote efficiency from preparation before construction to the actual pouring. ◆ It allows for the rapid creation of detailed 3D BIM models of concrete, enabling the calculation of accurate quantities necessary for bidding, budgeting, ordering, and on-site progress management. ◆ It is possible to perform quantity takeoffs for construction, including the amount of concrete and the quantities of rebar and embedded hardware. ◆ Monitoring and adjusting construction progress, as well as visualizing communication with other contractors, can be carried out accurately. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 3D CAD
  • Other CAD
  • 2D CAD Construction
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Forum Groningen

The created drawings total over 28,000 sheets! Temporary support structures used during installation have also been modeled!

The steel structure of the Forum Groningen, designed by NL Architects, consists of eight steel "masses" made of spatial trusses fixed on two concrete cores that serve as the foundation. These concrete cores are connected at the top by a bridge structure, designed to have deflections in separate directions, requiring the steel "masses" to also face in their respective directions. The detailed design, fabrication, assembly, tolerance assurance, and logistics of such a twisted structure proved to be complex, presenting significant challenges. As a result, all of the main structure, as well as the supporting structure of the facade made of natural stone that moves in three directions (2,600 tons), were modeled using Tekla. The design, modeling, production drawing creation, fabrication, and installation were carried out concurrently at two locations, but were executed on schedule thanks to the collaboration of the engineering team. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special site below ⇩

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Santiago International Airport

The production drawings are generated directly from the Tekla model! This ensures the management and improvement of production quality and safety.

VINCI Construction Grands Projets, in collaboration with Astaldi, is overseeing the conceptual design and construction of the expansion project at Santiago International Airport in Santiago, Chile. The conceptual design began in 2015, and the construction phase, which started in June 2016, had to be completed by the end of 2020. Since this project is designed based on strict seismic standards, adapting the structure to meet these requirements has been a significant challenge. To address this, collaboration tools such as "Tekla" and "Tekla BIMsight" were used. Thanks to the ability to create highly detailed models, adjustments can be made with certainty. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 2D CAD Construction
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Heating Furnace for Oil Refining Plant

The model object perfectly matches the blueprint! The design team is flexible in responding to major changes!

In this project, we are engineering a heating furnace with an air preheater, platform, and auxiliary support structures. There were two major challenges in this project. The first was the need to fit equipment into the confined space of the existing plant, while also facing constraints in the work area due to project specifications and equipment requirements. Through three-dimensional modeling with "Tekla Structures," we were able to accurately understand all requirements early in the project, evaluate the pros and cons of possible options, and confirm accessibility. The next challenge arose from layout changes to the equipment that occurred later in the project, necessitating extensive additional design work that affected both structural components and auxiliary support structures. Since the model objects perfectly matched the design drawings, the design team was able to respond flexibly to significant changes, mitigate impacts on the project schedule, and proactively avoid serious issues that could arise in design and fabrication. *For more details, please feel free to contact us. ⇩ The catalog can be downloaded from the special site below ⇩*

  • 3D CAD
  • antenna
  • 2D CAD Construction
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Linnanmaki Amusement Park

Modeling the foundation and ride facilities of a roller coaster, and constructing it between existing attractions!

The roller coaster at Linnanmäki Amusement Park in Helsinki, Finland, began construction in 2018 and was completed in 2019. The project was agreed to be carried out during the amusement park's off-peak season, so the demolition work started after the summer peak season and the attraction needed to be completed before the following summer. Ensuring sufficient distance from existing structures and facilities was a major challenge in determining the shape of the roller coaster, and the varying landscape due to height was also a consideration in designing the foundation. The contractor conducted extensive laser scanning of the bedrock surface at the construction site, and this information was used in the design of the foundation for excavation and the installation of stress anchors. "Tekla Structures" can incorporate laser-scanned terrain data, allowing for the design of the foundation that secures the rails based on that data. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special site below⇩

  • 3D CAD
  • 2D CAD Construction
  • Modeler
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Tokyo Skytree(R)

Discovery and resolution of potential issues! It was also used to confirm the construction steps on site!

In Japan, a super high-rise building at 634 meters is an unknown territory, and it posed a significant challenge for Obayashi Corporation, which undertook the construction. Considering the necessity of avoiding interference through prior verification and ensuring construction accuracy, it was determined that the use of a 3D design system was essential. As a result of comparing several software options, "Tekla Structures," a structural BIM software that has been adopted by various fabricators and has a proven track record in the design of special-shaped steel structures, was selected. "We received feedback that by placing various components that attach to the tower in a 3D model and repeatedly conducting prior verification (interference avoidance), we were able to eliminate on-site correction work (rework and defect fixes) and proceed with construction smoothly." *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 3D CAD
  • 2D CAD Construction
  • Modeler
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Sutter Medical Center

Dramatically reduce on-site errors with a single 3D model! Reduce time and costs with BIM technology!

Sutter Medical Center, located in Castro Valley, California, had a schedule that was 30% shorter than comparable healthcare projects in California. This required the introduction of construction principles and technologies from lean production methods, such as BIM. "Tekla Structures" is one of the tools that enabled the integration of Harris Rebar into this process. By using Tekla, it became possible to quickly and accurately identify design and constructability issues and discrepancies, as well as to communicate with other contractors. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • Software (middle, driver, security, etc.)
  • 3D CAD
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Mechanical (Cultural Center)

Adopting an appropriate solution! A case where work was coordinated through open communication.

This project connects two reinforced concrete structures using steel trusses with concrete slabs on each floor. The complexity of the joints in the steel structure, as well as the joints between the steel and reinforced concrete structures, increased due to their shapes and angles, becoming a challenge for the project. By maintaining open communication among the design architects, structural engineers, and fabrication team, we were able to smoothly discuss and adopt appropriate solutions even for very challenging aspects of the overall steel construction. 【Case Overview】 ■Challenges - Complexity of the joints in the steel structure - Increased complexity of the joints between the steel and reinforced concrete structures due to their shapes and angles ■Result: We were able to adopt appropriate solutions *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special website below⇩

  • Software (middle, driver, security, etc.)
  • Other CAD related software
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Brookfield Place Tower

Widely used for identifying interference points with design! We will introduce case studies of BIM software implementation.

The ICD Brookfield Place Tower, with 54 floors and a height of 282 meters, was constructed at the Dubai International Financial Centre. Considering the complex shape and the precision required at each construction stage, the steel structure design using Tekla played a crucial role in the project's success. "Tekla BIMsight" was widely used to identify interference points in the design by contractors for the roof and facade, equipment vendors, concrete contractors, and other stakeholders, and the detected interference points were resolved during the design phase. Adjusting the unique and complex steel structure was a challenging task, but BIM facilitated smooth coordination with the design and other stakeholders, as well as the generation of fabrication drawings, contributing to successful construction on schedule. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special site below ⇩

  • Software (middle, driver, security, etc.)
  • Other CAD related software
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Kilpilahti Industrial Area Wastewater Treatment Facility

Avoiding interference, reducing rework and additional costs! A case where significant time was saved.

This project is an industrial initiative boasting the highest level of safety, modeled through seamless collaboration among designers from various countries, utilizing "Tekla Structures" and "Tekla Model Sharing." In addition to preliminary quantity calculations, estimate creation, and determining the pouring sequence, adjustments to rebar placement with rebar processing contractors, material quantity calculations, site layout, monitoring of progress and costs, and HVAC design were all conducted using Tekla Structures, which also incorporated plumbing design as a reference model. By using Tekla models to collaborate with other departments, not only can a clear image of the actual construction site be obtained, but detailed change information can also be verified, allowing for the avoidance of conflicts and the reduction of rework and additional costs. Modeling not only deepens the understanding of the design process but also enables more extensive and flexible technical decisions than ever before, significantly shortening the time required. *For more details, please refer to the PDF document or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 2D CAD Construction
  • 3D CAD
  • Modeler
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Pasila District Development Project

Utilizing modeled information extensively in the production plan! Achieving impressive facade architecture.

Tripla is a large-scale project located in the Pasila district, consisting of a mixed-use area in Block 3, which includes the construction of the Tripla Mall, offices, apartments, hotels, and the renovation of Pasila Station. The success of the project can be attributed to the open attitude of all stakeholders towards BIM and digitalization, adopting an experimental approach. Various software products and technologies have been tested and utilized in the project. In cases where existing solutions are not available, custom solutions and methods have been established to support this large-scale development project. The construction of the BIM model and model-based visualization played a crucial role not only in negotiations among various stakeholders but also in marketing. [Case Overview] ■Challenge: The enormous data size of the design model ■Response: Dividing the model into units and separating the published model and documentation from the actual building's solid model *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special website below⇩

  • 2D CAD Construction
  • 3D CAD
  • Modeler
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Subway Extension Line Ranchi Metro

Effectively utilized in various situations! Case study of implementation in one of Finland's largest infrastructure projects.

The Länsimetro is a subway line that connects the city of Helsinki with the neighboring city of Espoo. The construction of eight new stations, each with its own unique characteristics, has enabled passengers to travel using the subway. To realize this large-scale project, the engineering company A-Insinoorit began the design work in 2009. It was clear from the outset that BIM was necessary to manage the construction of the underground stations, which have various aspects. Multiple CAD programs were used for design and equipment planning, but structural design was fully implemented using "Tekla Structures." 【Case Overview】 ■ Implementation Site: Subway Extension Line Länsimetro (One of the largest infrastructure projects in Finland) ■ Implemented Product: Tekla Structures *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special site below⇩

  • 2D CAD Construction
  • 3D CAD
  • Modeler
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] West Terminal 2 Project

Achieving high-difficulty construction in a short period! A case study of executing a project using BIM.

West Terminal 2 is a new ferry passenger terminal in Helsinki, Finland, completed in March 2017. The new terminal was designed with a focus on functionality to ensure smooth and efficient boarding and disembarking for passengers. Many stakeholders utilized BIM throughout the project, from design to manufacturing and construction, in pursuit of design and quality. BIM software was introduced for design, structure, and equipment design, and "Tekla Structures" was adopted for the design of the building, which features a geometric design including a curved roof, sloped canopies and facades, and tall glass walls. BIM is not only an excellent tool for adjusting various design requirements and achieving complex construction within a short timeframe, but the client also appreciates that it helped deepen the understanding of the design. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • Other CAD related software
  • 2D CAD Construction
  • 3D CAD
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Shopping Center Project

Achieving High Quality! A Case Study on Effectively Utilizing BIM Models as a Communication Tool

About 100 years ago, Porin Puuvilla was used as a spinning mill, and in 2014, it was transformed into a large shopping center with offices, a housing sales center, warehouses, and parking, while retaining some of the factory's features. The 13 companies involved in this large-scale renovation project utilized model-based design and leveraged BIM throughout the project, significantly improving the construction process and the quality of the building. Parma, which handled the design, manufacturing, and construction of precast concrete, worked on BIM within a very tight schedule. They not only extensively utilized rich model information in manufacturing and construction but also focused on modeling with consideration for the needs of all stakeholders, facilitating collaboration among them at each phase. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special website below⇩

  • Other CAD related software
  • 2D CAD Construction
  • Modeler
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Denver International Airport Expansion Project

All stakeholders use Tekla to achieve efficient collaboration! Case study on the introduction of BIM software.

At Denver International Airport, the construction of a new train station connecting downtown to the airport and a hotel is underway. The design of this hotel, including its curved roof, evokes the image of an airplane when viewed as a whole. To achieve this exterior, which consists of many curved surfaces and intricate parts, technology was required to accurately process various complexly bent shapes of plates. Therefore, the project team set it up so that the coordinate location information output from "Tekla Structures" is automatically displayed on each fabrication drawing. This made precise processing possible. By having all stakeholders use Tekla, it has become easier for team members to carry out various tasks such as planning, data exchange, and defect corrections, thereby achieving efficient collaboration. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special site below⇩

  • Other CAD related software
  • 2D CAD Construction
  • Modeler
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Amaar Bakke

Reducing issues in the pre-construction phase! One of the largest environmental projects in Europe utilizing BIM.

The new plant "Amar Bakke," aimed at waste incineration and energy recovery, has replaced the Amar incinerator, which had been in use for 40 years until 2017, and features ski slopes and a climbing wall. The Danish engineering company Moe A/S was responsible for the planning of the structure and the management of the Amar Bakke project. Utilizing "Tekla Structures," they detailed the modeling from rivets to bolts, and also used it for generating quantity specifications, bid lists, order catalogs, and construction management. This product is consistently used daily by a drafting and modeling team of 3 to 6 people, while structural engineers check intricate details within the model and take measurements, sharing the model with other project stakeholders for collaboration. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • Other CAD related software
  • antenna
  • 2D CAD Construction
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Oslo Airport Terminal 2

Harnessing the power of Open BIM! Introducing examples where everything except analysis was done using Tekla Structures.

Oslo Airport's Terminal 2 is a massive construction project involving over 100 affiliated companies, which must ensure safety and airport security on a daily basis while smoothly and reliably carrying out regular operations. This has posed a challenge for Aas-Jakobsen, the main structural engineer. The project required smooth collaboration with the airport management company, Avinor, and end clients, necessitating modeling by the affiliated companies. After trying several software solutions, Avinor decided to adopt "Tekla Structures" for this project. By using the Tekla Structures model for visualization, the creation of reinforced concrete, generation of documentation, and scheduling have become easier, and the model has also been beneficial to the affiliated companies. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • Other CAD related software
  • 2D CAD Construction
  • Modeler
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Lamprell Company (Marine Structures)

Significant improvement in the efficiency of the structural design department! Introducing the case of Lamprell, which achieved high precision.

Lamprell, a company engaged in the engineering of marine structures, chose "Tekla Structures" with a good understanding of the speed, accuracy, consistency of detailed design, and the interference checking function between steel components, as well as the benefits of visualization. Initially, there were some doubts about the plan to use Tekla software for the fabrication of the barge, but considering the accuracy of the software, it was unanimously decided that utilizing 3D modeling would be the better approach. The modeled barge was able to extract various detailed information, such as platforms and handrails, within approximately 4 to 5 months. The team has a strong trust in the support system of this product and expresses great satisfaction with the ease of managing documentation on the software and the functionality for keeping records of drawing changes. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special website below⇩

  • Other CAD related software
  • 2D CAD Construction
  • Modeler
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Blue Lock Quarry

Achieving great results even in challenging projects between remote locations through the use of Tekla Structure!

Fulton Hogan Quarries undertook a project to renovate the crushing and screening plant at the Blue Rock Quarry located in Cedar Creek, Queensland, Australia. The Blue Rock Quarry is situated approximately 50 km south of Brisbane's city center. The objective of this project was to expand the production capacity of the crushing and screening plant to meet the anticipated increase in demand for aggregate and road base products. Proindustrial Construction Company (Portugal) closely collaborated with contractors NascoTech and Southern Cross Engineering to carry out the civil works and structural design of the steel structures for this complex facility. The company was also responsible for creating various types of drawings and documents used in steel fabrication, including detailed designs for connections and joints, as well as shop drawings. Although this was a challenging project that required design collaboration between remote locations in Australia and Portugal, significant achievements were made thanks to the use of Tekla Structure and the dedicated efforts of the participating team members.

  • 3D CAD
  • 2D CAD Construction
  • antenna
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Agora Evry Arena

Even when faced with unexpected challenges, it became possible to continue working by utilizing Tekla Model Sharing.

This construction is a renovation project for the Agora Evry Arena, which was built as an auditorium in 1970. At that time, it was a complex project that required high technical skills, and the expertise of the Bordan Châtauneuf team was necessary for the construction. The first challenge of this project was to recreate the design model of the existing building from scratch in order to add a new structure. The modeling was based on a manual created by Bordan Châtauneuf in 1970. Using point cloud data obtained from a 3D scan of the existing structure, the components were adjusted by a few centimeters. It was confirmed that the measured point cloud data had position information very close to that of the actual building. This "research" faced several unexpected challenges, but despite the difficulties, it became possible to continue working by utilizing Tekla ModelSharing.

  • 3D CAD
  • 2D CAD Construction
  • antenna
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Metropolitan Bus Terminal

All 3D models, including documents such as production drawings and work processes, are created using Tekla Structures!

The Integrated Transport Center is the largest investment project of the Lublin city government, and as part of this, the contractor Budimex has constructed a new bus station along with the reconstruction of the transport system. The company responsible for this impressive steel structure is Mostostal Kraków. The highlight of this project, the Lublin Metropolitan Bus Terminal's roof, is a representative landmark of Lublin, with the weight of the steel columns and truss sections with crowns totaling approximately 1550 tons. Its artistic appearance is composed of precise processing techniques and complex welding. MTA Engineering was responsible for the structural calculations, and the design engineering department of Mostostal Kraków led the detailed design work. The station's roof was designed as a spatial structure, supported by diagonal columns. All 3D models, including production drawings and work process documents, were created using Tekla Structures.

  • 3D CAD
  • 2D CAD Construction
  • antenna
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Tampere Deck Arena

Utilizing BIM in all designs! A case of a unique activity complex located above the railway in the city center.

The Tampere Deck Arena project is part of a large-scale development taking place around the central station of Finland's third-largest city. The construction of a unique activity complex that has emerged above the railway tracks in downtown Tampere was a highly unusual and challenging project even on an international level. The scale of construction, the complexity arising from various design requirements, the number of stakeholders involved, and overlapping responsibilities were challenges for the project, but these issues were resolved by combining various BIM models. One of the challenges faced by the designers was the coordination of interference issues that would have been unmanageable without the use of BIM for a project of this scale. By utilizing BIM, adjustments to the structures around the railway tracks and the positioning of ceilings and equipment were carried out without any problems. A large number of engineers participated in this project, and advanced BIM software was helpful when explaining construction decisions. Additionally, the use of BIM software allowed designers and other project stakeholders to focus on key tasks such as design and project management.

  • 3D CAD
  • 2D CAD Construction
  • antenna
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A comprehensive document explaining the seven reasons successful companies adopt BIM is now available!

Explaining the benefits and utilization methods of 'BIM' that contribute to solving issues such as design stage defects, rework in construction, and project schedule delays!

To promote DX in Japan's construction industry, the Ministry of Land, Infrastructure, Transport and Tourism is actively encouraging the spread of BIM/CIM, leading many companies, including major general contractors, to adopt BIM one after another. BIM is expected to provide innovative solutions as a trump card to solve the complex challenges faced by the construction industry, such as defects in the design phase, rework during construction, and delays in project timelines. This article will thoroughly explain the significant advantages that BIM brings to designers, contractors, and clients, detailing its specific benefits and utilization methods from a functional perspective. By exploring the potential of BIM, you may find new solutions to the challenges your projects face. If you are considering the introduction of BIM, please use this as a reference. [Contents (Excerpt)] ■ Definition of BIM: BIM is not just a design tool ■ Centralized management of all information ■ Data consistency ■ Prevention of errors and reduction of rework and correction tasks *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

US System Linked System Construction Drawing CAD

The input data is linked from the RC structure software to automatically generate 3D drawings.

Automatically draw construction drawings while measuring the RC wall-type structural quantity!

  • Other operation management software
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The only CAD customization consulting service in the country.

Peace of mind, safety, and reliability! We provide top-class service and technical expertise!

We provide maximum assistance to customers considering system development using AutoCAD / IJCAD / BricsCAD, ensuring they can complete better systems more reliably. We can offer various technical information that is useful to our customers, including design policies, various proposals, sample programs such as prototypes, technical education specialized for business, and a point of contact for technical questions related to development. We will supplement any necessary or lacking parts of your design and development operations. Please feel free to consult with us first. 【Service Highlights】 ■ Comprehensive technical support for customers in various aspects ■ Proposals considering the balance between operation and system ■ A complete support system with a single point of contact from consultation to technical support, emphasizing "quality" ■ Proposals considering scalability and versatility, etc. *For more details, please download the PDF or feel free to contact us.

  • Other services
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Non-contact cutting of synthetic fiber materials is possible! Laser straight cutting device.

Non-contact cutting machine using laser. It produces no cutting waste and can also prevent fraying.

To prevent fraying of synthetic fiber materials (such as banners), it is possible to perform non-contact heat cutting in a straight line using laser light. The laser head can cut in a reciprocating direction, and the travel speed can also be adjusted. Non-contact cutting with a laser does not produce cutting debris, and the laser cutting melts the cut surface of the material, achieving a fraying prevention effect.

  • Textile Processing Machinery
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Instantly bundle carbon fibers for high-speed cutting! Carbon high-speed cutting machine.

Cuts carbon fiber instantly with a super hard guillotine blade.

This is a device that quickly cuts multiple bundles of carbon fibers. The guillotine blade has a special shape and uses a super-hard blade. The lower blade is also made of super-hard material, allowing it to cut the material instantly. The bobbin stand can accommodate up to 30 spools and prevents tangling with a separation bar. (A photo of the bobbin stand is included in the catalog.) Custom manufacturing of optional items like the bobbin stand is possible from a single unit, so please feel free to contact us.

  • Textile Processing Machinery
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

無人裁断で効率アップ!スポンジVカット裁断装置

必要な操作は材料セットと裁断ピッチの入力だけ。あとは無人で裁断し続けます。

2台のカッターでベッド芯材をV字カット。 必要な操作は材料セットと裁断ピッチの入力だけ。あとは無人で裁断し続けます。生産効率の向上が見込めます。 仕上がりも綺麗で、効率・質ともに向上が見込めます。

  • Textile Processing Machinery
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Cost-effective with commercially available knives! OLFA running film cutting device.

For cutting harder materials like PET film and linoleum! It uses commercially available OLFA round blades, allowing for inexpensive knife replacements!

Run a commercially available OLFA round blade cutter to cut through hard materials! Since we are using a commercially available knife, we can replace the knife at a low cost! Additionally, replacing the knife is very easy as it only requires removing one screw!

  • Textile Processing Machinery
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pickup of products at the time of shipment! Work alignment conveyor system.

Since it operates independently, it can be integrated even in the middle of the line.

This is a conveyor that aligns the center position of the workpieces, such as rice bags, for pickup by a transport robot arm. Since it operates independently, it can be added to the middle of a line. (Various settings can also be performed independently on this machine.)

  • Textile Processing Machinery
  • Conveyor
  • CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration