[Construction Case] Leisure Facility: Subfloor Settlement Correction Work (Ibaraki Prefecture)
Due to the impact of the Great East Japan Earthquake, subsidence occurred! Adjustments of 350m2 were made over four consecutive nights of construction.
Here is a case study of "subfloor sinking correction work" conducted at a leisure facility in Ibaraki Prefecture. We carried out correction work for a significantly sunken floor in the pachinko area within the facility. Sinking was also observed in other areas, including in front of the machine room and in the restrooms, and we performed sinking correction work over a total construction area of approximately 350m2 over four consecutive nights. [Case Overview] ■ Construction Area: Approximately 350m2 ■ Maximum Sinking Amount: 93mm ■ Area: Ibaraki Prefecture ■ Construction Period: Four consecutive nights (2011) *For more details, please refer to the PDF document or feel free to contact us.