We have published examples of construction work for cavity filling (BCP measures).

We have newly published construction case studies on the service site for the Teratec method.
This is a case of filling voids beneath the floor slab conducted near an automatic rack warehouse in Toyama Prefecture. There were concerns about subsidence of the surrounding roads and building floors due to ground subsidence following the Noto Peninsula earthquake, and we received inquiries from clients regarding this issue.
We have been informed that the key factor for choosing our Teratec method was its ability to perform "short-term construction without stopping truck traffic." Additionally, the effectiveness of compacting loosened ground has also been highly evaluated.
Our company has extensive experience in subsidence countermeasures and void filling work while maintaining daily operations in logistics warehouses and factories. With eight branches nationwide, we are equipped to respond to issues related to ground subsidence and voids beneath floors, so please feel free to contact us if you have any concerns.
■ Construction case studies (Teratec method service site):
https://teretek.jp/repo/r180

Inquiry about this news
Contact Us OnlineMore Details & Registration
Details & Registration
Related Links
Related product
Related catalog(12)
![[Inclination/Subsidence/Step Difference/Cavity Filling] "TerraTech Method" Correction of subsidence in concrete floor slabs due to ground subsidence or disasters.](https://image.mono.ipros.com/public/catalog/image/01/494/209281/IPROS62099550671294161372.png?w=120&h=170)
Distributors
Building materials, supplies and fixtures
メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡