List of consulting products
- classification:consulting
1~45 item / All 582 items
Reduce the workload from handling heavy objects! Here are five case studies that solved customer challenges! We are also accepting free consultations and tests tailored to your work!
- Other conveying machines
We can accommodate high resistance over 10,000 ohms, with diameters ranging from approximately 30 mm to 8 inches, and we also offer thinning and chip processing arrangements!
- Other semiconductors
- Processing Contract
- Wafer
Centralized monitoring of WBGT, oxygen concentration, and tank entry logs in the cloud. Immediate alerts for unseen risks during tank operations.
- Safety Management
- Other safety equipment
- Oxygen gas concentration meter
When you produce, import or sell fertilizer. From sorting out ordinary fertilizer registration, special fertilizer notification and seller notification.
- Legal
- Product Development
- Quality Display
When you use or sell alcohol of 90 percent or more. From choosing between general and specified alcohol to bookkeeping and annual reports after licensing.
- Legal
- Manufacturing Facility
- Safety Management
For plants using poisonous or deleterious substances in electroplating or metal heat treatment. From determining whether notification is needed to filing within 30 days.
- Legal
- Manufacturing Facility
- Safety Management
When you sell or transfer poisonous or deleterious substances. From choosing the registration type and the requirements for selling without stock to the application.
- Legal
- Product Development
- Safety Management
When you manufacture or import poisonous or deleterious substances. From checking facility standards and the handling supervisor to the registration application.
- Legal
- Manufacturing Facility
- Safety Management
For five-year license renewals and the on-site inspection that comes with them. From checking procedures and records to attending on the day.
- Legal
- Product Development
- Hygiene Management
We prepare full ingredient labeling from your formula in line with the PMD Act, including converting foreign ingredient names for imported products.
- Legal
- Product Development
- Quality Display
We review wording on landing pages, social media and packaging under the PMD Act and the Premiums and Representations Act, and deliver alternative wording and a report.
- Legal
- Product Development
- Quality Display
When you launch new cosmetics or change responsible persons. We manage marketing notifications and change notifications together.
- Legal
- Product Development
- Quality Display
When you export cosmetics. The export notification for cosmetics and obtaining the certificates of free sale requested by the importing country.
- Legal
- Product Development
- Quality Display
When you import and sell overseas cosmetics. Licenses, the foreign manufacturer notification, product notifications and checks of ingredients and Japanese labels.
- Legal
- Product Development
- Quality Display
When you sell OEM-made cosmetics under your own brand. The licenses you need depend on who becomes the marketing authorization holder.
- Legal
- Quality Display
- Product Development
We prepare GQP procedures, required for the cosmetics marketing license, and recommended GVP procedures, tailored to your actual operations.
- Legal
- Product Development
- Hygiene Management
When you manufacture, fill, package or store cosmetics. From choosing the category that matches your operations to the license application.
- Legal
- Product Development
- Manufacturing Facility
When you launch cosmetics under your own brand. From the responsible-person structure and GQP/GVP procedures to the license application and on-site inspection.
- Legal
- Quality Display
- Product Development
When you fill or recover fluorocarbons in commercial air conditioners and refrigeration equipment. From checking requirements to the registration application.
- Legal
- Other environmental measures and recycling
- Manufacturing Facility
For PCB waste such as old transformers and ballasts left at your plant. From annual storage notifications to planning disposal.
- Legal
- Other environmental measures and recycling
- Safety Management
Before demolishing a plant, selling land or carrying out large-scale grading. From identifying when notification is required to filing.
- Legal
- Other environmental measures and recycling
- Safety Management
When you install air compressors, presses or crushers. From checking coverage to filing at least 30 days before construction starts.
- Legal
- Other environmental measures and recycling
- Manufacturing Facility
When you install boilers, drying furnaces or incinerators. From checking size thresholds to the notification and planning around the 60-day construction restriction.
- Legal
- Other environmental measures and recycling
- Manufacturing Facility
When you install equipment that discharges wastewater. From checking whether it is a specified facility to filing at least 61 days before construction starts.
- Legal
- Other environmental measures and recycling
- Manufacturing Facility
When your plant outsources industrial waste to treatment contractors. We review the required contract items and manifest reporting.
- Legal
- Other environmental measures and recycling
- Safety Management
For five-year renewals, notifications of vehicle or officer changes, and adding waste types. We manage the deadlines for you.
- Legal
- Other environmental measures and recycling
- Safety Management
When you unload, transfer or store collected industrial waste at your own site before onward transport. From zoning and prior consultation to the permit application.
- Legal
- Other environmental measures and recycling
- Safety Management
When you transport specially controlled industrial waste such as waste oil, waste acids or alkalis. From determining whether the waste qualifies to the permit application.
- Legal
- Other environmental measures and recycling
- Safety Management
When you start transporting industrial waste as a business. From checking the training course, vehicles and financial basis to the permit application.
- Legal
- Other environmental measures and recycling
- Safety Management
When starting to sell gas or adding sales locations. From notifications for each sales office to appointing a sales supervisor.
- Legal
- Safety Management
- Manufacturing Facility
When using special gases such as monosilane, or hydrogen and liquid oxygen above set amounts. We handle the notification required on the user side.
- Legal
- Safety Management
- Manufacturing Facility
When installing nitrogen or carbon dioxide tanks or production equipment. From determining whether a permit or notification applies to preparing the notification.
- Legal
- Safety Management
- Manufacturing Facility
When changing the type or quantity of hazardous materials at a permitted facility. From checking that no modification permit is needed to filing 10 days in advance.
- Legal
- Safety Management
- Manufacturing Facility
Once added materials or larger volumes exceed the designated quantity, a small-quantity notification is no longer enough. From temporary storage approval to the permit and discontinuation notice.
- Legal
- Safety Management
- Manufacturing Facility
For storing resin pellets, combustible liquids or wood products above set amounts. From checking items and quantities to filing the notification.
- Legal
- Safety Management
- Manufacturing Facility
Even below the designated quantity, one-fifth or more requires a notification. From calculating the multiple to checking the storage area and preparing the notification.
- Legal
- Safety Management
- Manufacturing Facility
For expanding or replacing equipment at a permitted hazardous materials facility. We start by determining whether a modification permit or a notification is needed.
- Legal
- Safety Management
- Manufacturing Facility
For warehouses and tanks storing solvents, paints or fuels at or above the designated quantity. From the permit application to the completion inspection.
- Legal
- Safety Management
- Manufacturing Facility
When your plant manufactures or handles hazardous materials at or above the designated quantity. From classifying the facility to the permit application and completion inspection.
- Legal
- Safety Management
- Manufacturing Facility
For the annual report due 30 June. From identifying target substances and helping calculate releases and transfers to preparing the report.
- Legal
- Safety Management
- Other environmental measures and recycling
For the expanded list of regulated substances and JIS Z 7253:2025. From checking ingredients to drafting SDSs and labels and managing five-year reviews.
- Legal
- Safety Management
- Quality Display
A separate procedure from the CSCL. From notification of hazard investigation results to small-quantity confirmation (up to 100 kg a year per workplace).
- Legal
- Safety Management
- Hygiene Management
For new polymers. If the criteria are met, one confirmation removes the need for annual applications, and the substance name is not published.
- Legal
- Safety Management
- Product Development
For new chemical substances used as intermediates, in closed systems or for export only. No volume cap, and one confirmation replaces the standard notification.
- Legal
- Safety Management
- Product Development
For new chemical substances over 1 tonne and up to 10 tonnes a year. From the first-year procedure to annual quantity applications.
- Legal
- Safety Management
- Product Development
New chemical substances up to 1 tonne a year require an application every fiscal year. We manage the schedule and file electronically, even when your staff changes.
- Legal
- Safety Management
- Product Development
Before manufacturing or importing more than 1 tonne a year of a new chemical substance. From checking exemptions to preparing and filing the notification.
- Legal
- Safety Management
- Product Development