We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 483 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Dec 10, 2025~Jan 06, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Dec 10, 2025~Jan 06, 2026
This ranking is based on the number of page views on our site.

  1. フルサト工業 建材開発部 Osaka//Building materials, supplies and fixtures
  2. コスモシステム Tokyo//Industrial Machinery
  3. 富士ファーマナイト Kanagawa//Electricity, Gas and Water Industry
  4. 4 メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Tokyo//Building materials, supplies and fixtures
  5. 5 双和化学産業株式会社 Hyogo//others

Construction method Product ranking

Last Updated: Aggregation Period:Dec 10, 2025~Jan 06, 2026
This ranking is based on the number of page views on our site.

  1. The "Infrared Welding Machine Series" that changes plastic welding methods. コスモシステム
  2. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  3. Stop leaks from the valve gland! "Valve Gland Method" 富士ファーマナイト
  4. 4 FRP Waterproofing Polyroof PP Method Series Rooftop and Parking Lot Waterproofing Methods Edition 双和化学産業株式会社
  5. 5 Exposed-type elastic fixed column base method "Free Base Method" フルサト工業 建材開発部

Construction method Product List

76~90 item / All 1397 items

Displayed results

No clogging and long-lasting functionality! An environmentally friendly civil engineering drainage system.

Permeable sheets, waterproof sheets, and the embedding of crushed stone are unnecessary, allowing for labor-saving construction, shortened processes, and improved cost-effectiveness! *NETIS registered product

The civil drainage system utilizing drain belts and drain pipes excels in water collection and drainage performance, employing drain belts and drain pipes that do not clog. (NETIS registration number: KT-180128-A) Since there is no need to embed permeable sheets, waterproof sheets, or crushed stone, it allows for labor-saving construction, shortened processes, and improved cost-effectiveness. Additionally, it can handle both infiltrated water and spring water in the soil, leading to enhanced drainage functionality. Due to surface tension and capillary action, it drains only water, preventing clogging and maintaining functionality over a long period. Since it does not discharge soil particles from the soil during drainage, it can minimize the impact on the surrounding soil. 【Application Range】 - One unit during installation can connect drain belts of up to 50m on each side of the drain pipe for a maximum of 100m, and the length can be extended up to 50m by linking drain pipes. By connecting multiple units, it can be applied without limit. - Ground moisture conditions: A wide range from permeable ground to poorly drained ground. - Ground temperature: Above -20°C and below 65°C. *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Erosion Coat: A Preventive Agent for Flying Sand, Dust, and Soil Erosion

It also suppresses soil erosion caused by rainfall! It penetrates and adheres to the soil, providing a nurturing effect.

The "Super Erosion Coat" is a product that prevents flying sand, dust, and soil erosion for an extended period due to its strong binding layer and weather resistance. Since it is a low-viscosity liquid, it can be easily diluted. Additionally, it penetrates and adheres to the soil, providing a protective effect. Please feel free to contact us when you need our services. 【Features】 ■ Strong adhesion and weather resistance, preventing flying sand and dust ■ Reduces soil erosion caused by rainfall ■ Easy to dilute due to its low viscosity ■ Provides a protective effect as it penetrates and adheres to the soil *For more details, please download the PDF or feel free to contact us.

  • Coating Agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Bag Manufacturing Factory in Miyagi Prefecture

We will introduce a case of a bag manufacturing factory that sank due to ground subsidence and the impact of an earthquake!

We would like to introduce a case study of floor sinking correction work and subfloor void filling work carried out at a bag manufacturing factory located in Miyagi Prefecture. The neatly arranged bag-making machines were tilted due to floor sinking, which hindered production. As a temporary measure, legs (for height adjustment) were installed under the machines to level them, allowing work to continue. Consequently, we received a request for correction from the company, as we can quickly make adjustments without removing the machines, and we proceeded with the work. In addition to the floor sinking, voids were also observed under the floor, so we carried out the filling work as well. [Case Study] ■ Construction Area: Approximately 730m² ■ Maximum Sinking Amount: Approximately 110mm ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] T Printing Company Factory in Miyagi Prefecture

We would like to introduce several examples of factories in the industrial zone of Miyagi Prefecture that have been modified using our construction method!

We would like to introduce a case of floor vibration suppression work carried out at the T Printing Company factory located in Miyagi Prefecture. In a factory where a machine weighing approximately 26 tons is placed, the floor began to vibrate after the earthquake. To confirm the situation before the installation of the machine, core drilling was performed at several locations. As a result, it was confirmed that there was a gap of up to approximately 180mm beneath the concrete. By carrying out gap filling work, we were able to restore the original performance of the concrete floor and suppress the floor vibrations. Additionally, we also conducted floor subsidence correction work at a factory of T Industry located in Miyagi Prefecture. 【Case Study】 <Floor Vibration Suppression Work at T Printing Company Factory in Miyagi Prefecture> ■ Construction: (Phase 1) July 2011, (Phase 2) October 2011 ■ Maximum Gap Size: Approximately 180mm ■ Total Construction Area: Approximately 160m2 ■ Actual Working Days: 1.5 days *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Road Upcon Method (Concrete Pavement Slab Repair Method)

We will correct various defects that occur in concrete pavement slabs within a short construction period.

New Technology from Upcon Contributing to the Longevity of Road Infrastructure Upcon quickly corrects deformations in concrete pavement slabs: - Elimination of step differences - Correction of subsidence - Resolution of fluttering - Elimination of voids and cavities - Restoration of water drainage slopes - Correction of subsidence in bearing plates For repairs on high-strength-demanding surfaces such as highways, we use a uniquely developed high-strength polyurethane resin to make quick corrections to concrete pavement slabs. *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Correction Work for Floor Subsidence in Store - Continuous Night Work Without Stopping Business

Maximum subsidence of 144mm, construction area of approximately 2,300m2! Introduction of a case where corrections were made over 11 consecutive nights of construction.

Due to the impact of the Great East Japan Earthquake, the floor inside the store has significantly sunk. As a result of the floor sinking, gaps were observed between the floor and walls, as well as between the walls and ceiling. Therefore, our company carried out repair work. The "Upcon Method," which can be implemented at night during the business suspension, was adopted for the repairs. Additionally, voids were observed under the floor, so filling work was also conducted. 【Construction Overview】 ■ Construction Area: Approximately 2,300m2 ■ Maximum Settlement: 144mm ■ Construction completed in 2012, with repairs made over 11 consecutive nights. *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Vibration Suppression in Precision Parts Manufacturing Factory - Void Filling Work

"The earthen floor is sagging, causing the machine to vibrate." "The vibration of the machine affects product accuracy." Quickly resolved with the up-con method.

This time, we will introduce a case study of a precision parts manufacturing factory in Saitama Prefecture. Due to ground subsidence, cracks and deflection occurred in the concrete floor, causing vibrations in the machinery. To prevent the impact of vibrations on product accuracy, we carried out subsidence correction work to alleviate deflection and void filling work under the concrete floor. The Upcon method was adopted because it allows for construction without moving the machinery and without stopping operations. 【Site Information】 Saitama Prefecture / Precision Parts Manufacturing Factory Construction Area: 287 square meters Maximum Subsidence: 44 mm Maximum Void Volume: 50 mm Construction Period: 3 days You can view detailed construction information in the PDF download below.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Correction of floor subsidence and tilt due to earthquakes and ground subsidence in a short construction period: Upcon method.

Quickly correct the sinking of concrete floors with rigid polyurethane resin without stopping operations or business【Factory, warehouse, store, residential, etc.】【Case studies available】

The "Upcon Method" is a concrete floor slab sinking correction method that quickly adjusts floor tilts, steps, and voids caused by earthquakes or ground subsidence using rigid polyurethane resin. It does not require the dismantling of existing floors, nor does it necessitate the movement of machinery or products, allowing for corrections to be made without stopping operations or business. In addition to correcting sinking and filling voids in concrete floors of factories, warehouses, stores, and slab foundation houses, the "Upcon Method" is widely adopted for correcting steps and fluctuations in concrete pavement slabs for roads and port facilities. 【Features of the Upcon Method】 ■ Short construction period Reduces construction time to about 1/10 of conventional concrete replacement methods. ■ No interruption of operations or business Since there is no need to move machinery or goods, construction can be carried out without stopping production lines or business operations. ■ Comprehensive high technical capability Construction is performed by 100% in-house technical staff who have received specialized training. The floor level is managed to the millimeter, providing a high-precision finish. ■ Compact construction system Construction can be carried out using a truck equipped with all necessary materials and equipment, eliminating the need for large plant installation or removal. *For more details, please refer to the PDF materials (catalogs, case studies) or contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Parts Manufacturer Factory: Floor Slab Settlement Correction Work

A case where the earthen floor, which had subsided and developed gaps due to the earthquake, was repaired in a short construction period without demolishing the existing floor!

We would like to introduce a case of "floor slab settlement correction work" and "void filling work under the floor slab" conducted at a parts manufacturer factory in Fukushima Prefecture. There were various areas within the factory experiencing settlement and deflection, resulting in a wavy floor slab and the formation of voids in addition to the settlement. After the work was completed, the floor slab in the factory was corrected to nearly level, and to suppress vibrations caused by forklift passage, focused injection filling was performed in the aisle areas to mitigate vibrations. [Case Summary] ■ Construction Area: Approximately 1,470 m² ■ Maximum Settlement: 40 mm ■ Maximum Void: 60 mm ■ Area: Parts manufacturer located in Fukushima Prefecture ■ Construction Period: 11 days *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Food Processing Plant: Earthquake Recovery Floor Slab Settlement Correction Work

Settlement of the earthen floor caused by the earthquake! Correcting the settled floor before the factory renovation work in a short period.

We would like to introduce a case of "floor sinking correction work (earthquake recovery work)" carried out at a food processing factory in Iwate Prefecture. Due to the impact of the Great East Japan Earthquake, extensive renovations were necessary, and to achieve a swift recovery, the Upcon method, which allows for quick corrections, was adopted. The construction area was approximately 1,135 m², with a maximum gap of 221 mm. The construction period was six days, utilizing two construction plant vehicles. 【Case Overview】 ■ Construction Area: Approximately 1,135 m² ■ Maximum Gap: 221 mm ■ Area: Iwate Prefecture ■ Construction Period: 6 days (※ Supported by two construction plant vehicles) *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Warehouse and Factory: Floor Slab Settlement Correction and Void Filling Work

Due to ground subsidence, there is sinking and sagging in the concrete floor! The items remain as they are, and the concrete floor will be repaired in a short time.

We would like to introduce a case of "floor sinking correction and void filling work" carried out at a warehouse and factory located in Hokkaido. Due to the effects of ground subsidence, there were signs of sinking and sagging in the floor, and we received a request for correction from the company. Before the work, the racks used for storing goods, which had become tilted due to floor sinking, were adjusted in height using spacers, but after the work, they became flat. [Case Overview] ■ Construction Area: 334m2 ■ Maximum Sinking Amount: 105mm ■ Construction Period: 3 days ■ Area: Sapporo City, Hokkaido *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Large Pachinko Parlor: Earthquake Recovery Work / Slab Floor Settlement Correction Work

Settlement due to compaction: Significant sinking of the floor inside the store due to the impact of the Great East Japan Earthquake! We will introduce our response case.

We would like to introduce a case of "earthquake recovery work" and "floor subsidence correction work" carried out at a large pachinko parlor located in Fukushima Prefecture. In this case, the floor inside the store significantly subsided due to consolidation settlement and the impact of the Great East Japan Earthquake. The tilt of the floor caused discomfort while walking inside the store. An up-con method that can be corrected during nighttime when the store is closed was adopted, and our company carried out the subsidence correction work. 【Case Overview】 ■ Construction Area: Approximately 700m2 ■ Maximum Subsidence: 161mm ■ Area: Fukushima Prefecture ■ Construction Period: Continuous 4 nights *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Supermarket: Subfloor Settlement Correction Work (Chiba Prefecture)

Due to the impact of the Great East Japan Earthquake, the floor inside the store sank! A case where repairs were made during the night while the store was closed.

Here is a case study of "subfloor sinking correction work" conducted at a large supermarket in Chiba Prefecture. Due to the impact of the Great East Japan Earthquake, the floor inside the store sank significantly. The Upcon method, which can be corrected during the night while the store is closed, was adopted, and our company carried out the correction. Since the store mainly handles fresh food products, during the construction, we not only used plastic sheets for protection around the injection gun but also enclosed the injectors to prevent resin dispersion while working. [Case Overview] ■ Construction Area: Approximately 2,000 m² ■ Maximum Sinking Amount: 99 mm ■ Area: Chiba Prefecture ■ Construction Period: Continuous 9 nights * To expedite the construction period, two construction plant vehicles were used (2011). * For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Repairing the gaps in the floors and walls of a large shopping center.

A significant subsidence of the floor due to weak ground! Introducing a case where repairs were made at night during the business closure.

Here is a case study of "floor sinking correction" conducted at a large shopping center in Nara Prefecture. Due to weak ground, the floor sank significantly. As a result of the floor sinking, gaps were observed in various places, such as between the floor and the walls and between the walls and the ceiling. An up-con method that can be corrected during nighttime while the business is closed was adopted, and our company carried out the correction. 【Case Overview】 ■ Construction Area: Approximately 3,240m2 (Backyard 405m2, Inside Store 2,835m2) ■ Maximum Sinking Amount: 94mm ■ Area: Nara Prefecture ■ Construction Period: 25 nights ※ Supported by 2 construction plant vehicles *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Apartment: Correction of Sunken Floor in Entrance Hall / Filling of Underfloor Gaps and Voids

Resolve issues such as 'gaps between the wall and ceiling' in just one day with the Upcon construction method!

We would like to introduce a case of "subfloor sinking correction work" and "subfloor void filling work" carried out in a condominium located in Niigata Prefecture. In the RC apartment building (1st floor) we are introducing this time, due to floor sinking, there were issues not only with "floor tilting" but also with "gaps occurring between the walls and ceiling" and "doors not closing." After completing the subfloor sinking correction work and the subfloor void (cavity) work, the gaps between the walls and ceiling were eliminated, and the misaligned tile joints were leveled. Additionally, the doors that had been unable to close due to frame distortion from sinking were now able to close properly. 【Case Overview】 ■ Construction Area: 69m2 ■ Maximum Sinking Amount: 36mm ■ Maximum Void Amount: 190mm ■ Area: Niigata Prefecture ■ Construction Period: 1 day *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration