Cutting coolant sludge recovery case 2 (Tank fills halfway in 3 months)
[Issue] Fine sludge cannot be completely removed, and it accumulates to about half of the tank in three months!
◇ Introduction Background 〇 The conveyor for chip discharge alone cannot remove the fine sludge generated during the cast iron processing. 〇 Sludge adheres inside the machine, necessitating frequent maintenance to prevent issues such as pipe and pump blockages. 〇 Cleaning, which costs about 100,000 yen each time, needed to be done four times a year, among other reasons. ◆ Introduction Effects ● After one and a half years of implementation, the amount of accumulated chips in the six months following installation was less than that in the three months before installation. ● Cleaning frequency reduced from once every three months to once every six months. ● In addition to labor and cleaning costs, coolant expenses were also reduced to half, down to 200,000 yen after implementation, among other benefits.
- Company:サノテック
- Price:Other