1~31 item / All 31 items
Displayed results
Filter by category
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Inquiry Form1~31 item / All 31 items
Filter by category

We would like to introduce a case study that achieved a reduction in defect rates through the centralization of quality management data. In response to challenges such as the operation of aging core systems and the inability to monitor the operational status due to old machines without communication functions, this case led a project to smoothly transition to a highly scalable cloud ERP. Additionally, by retrofitting old machines with sensors that lack communication functions, we achieved cost-effective visualization of operational rates. 【Support Details】 ■ Smooth transition support from aging core systems to cloud ERP ■ Introduction of retrofitted sensors to old machines without communication functions and visualization of operational rates ■ Support for on-site challenges and appropriate implementation assistance *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We will introduce a case where we supported the construction of an integrated data platform that consolidates data scattered between locations, as well as the selection and establishment of DX tools based on issue extraction. Traditionally, systems were isolated by factory or department, and quality data was dispersed across processes. In this case, we conducted interviews centered around the voices from the field to support the selection of truly usable IT tools and the establishment of operational rules. We achieved the integration and collaboration of data scattered between locations, enabling the analysis and prevention of defect occurrence trends through the centralization of quality management data, as well as the establishment of a foundation for cross-analysis by management. [Challenges] ■ Systems were isolated by factory or department ■ Quality data was dispersed across processes *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case that achieved a reduction of approximately 1,690 hours in working time and a reduction of about 4.7 million yen in labor costs. Previously, we struggled with the manual aggregation of paper work daily reports and the issue of quality data being dispersed across different processes. In this case, by implementing DX consulting for the manufacturing industry, we were able to automatically aggregate work data in the cloud, allowing managers to instantly visualize production status and bottlenecks. We integrated the quality data that was previously scattered by process, enabling us to analyze and prevent trends in defects from the data. [Challenges] ■ The burden of aggregating data from paper work daily reports and the lack of visualization of quality management data dispersed across processes. *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We will introduce a case where we implemented DX consulting in the manufacturing industry, developed an internal training program for company-wide DX personnel, and promoted the automation of inspection work using AI image judgment. We faced challenges in the inspection process, which relied heavily on visual checks, but we cultivated core personnel who could lead and promote digital initiatives in-house without depending on external vendors. We planned the introduction of AI cameras in the inspection process, promoting labor reduction and standardization of inspection accuracy. [Challenges] ■ Labor reduction and standardization of inspection accuracy in the inspection process that relied on visual checks. *For more details, please download the PDF or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We will introduce a case study of DX (Digital Transformation) efforts in the manufacturing site (factory). In this case, before implementation, there was a state of "not knowing where to start." By maintaining both a field perspective and a management viewpoint, we conducted current situation assessment and diagnosis, analysis and proposal, and requirements definition and implementation support. We clarified appropriate DX goals and steps for our company and, as "practitioners" rather than just theorists, we accompanied the manufacturing site challenges, resulting in a reduction in defect rates through the centralization of quality control data. [Challenges] ■ The state of "not knowing where to start." *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Here are some case studies of the introduction of "Work Style Reform Consulting." In the design and management departments of the manufacturing industry, where telework is considered difficult, routine tasks were automated and streamlined using RPA and other technologies, allowing personnel to shift towards higher value-added planning tasks. A proper balance between remote work and in-office work was established, and the working environment, information sharing, meeting formats, and inter-departmental collaboration were redesigned not just theoretically but as "practitioners," resulting in improved productivity and standardization. 【Implementation Process】 ■STEP-0.5 Lecture (Sharing experiences, Q&A, cultivating mindset) ■STEP-1 Current Situation Assessment and Diagnosis (Understanding the current state of work styles, identifying waste and inefficiencies, investigating automation of decluttering tasks) ■STEP-2 Analysis and Proposal (Understanding the current state regarding the theme, prioritizing and specifying measures, creating proposals) ■STEP-3 Requirements Definition and Implementation (Setting project goals, defining requirements, supporting implementation (contracts/development)) *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We will introduce a case study of "Work Style Reform Consulting." Amid challenges related to weekend facility checks, this case enabled monitoring of alerts and operational status via smartphones, eliminating the need for weekend work. A system was established to balance childcare and caregiving with work, enhancing recruitment capabilities and corporate branding. This was not just a simple change in policy; it involved redesigning the working environment, information sharing, meeting structures, and inter-departmental collaboration, leading to improved productivity and standardization. 【Implementation Effects】 ■ Eliminated weekend facility checks and enabled monitoring of alerts and operational status via smartphones. ■ Established a system to balance childcare and caregiving with work, enhancing recruitment capabilities and corporate branding. *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
Here is a case study of the introduction of work style reform consulting. Previously, unnecessary travel time between offices and barriers between departments were challenges. After implementation, we reviewed the purpose of regular meetings and utilized online tools to reduce unnecessary travel time. Furthermore, we created a system for information sharing that breaks down barriers between departments, fostering an active organizational culture for exchanging opinions. This was not just a change in systems; we redesigned the working environment, information sharing, the nature of meetings, and inter-departmental collaboration, achieving improvements in productivity and standardization. [Results] ■ Reduction of travel time through the review and online transition of regular meetings ■ Fostering an active organizational culture through information sharing that breaks down barriers between departments *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
This case study introduces the implementation of work style reform consulting. Issues such as overwork (overtime) for specific employees and reliance on veteran staff were identified. However, by visualizing employee skills and establishing a system where individuals can handle multiple processes, as well as implementing the manualization and digitalization of tasks, we achieved the promotion of paid leave acquisition and a reduction in the turnover rate of younger employees. [Challenges] ■ Overwork (overtime) is occurring for specific employees ■ There are tasks that rely on veteran staff *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case study of "Work Style Reform Consulting" that achieved a reduction of approximately 1,690 hours in working time and about 4.7 million yen in labor costs. The challenge was the labor involved in aggregating data due to the use of paper for daily reports and inspection forms. After implementation, we eliminated paper operations and switched to tablet input, reviewed workflows, created a database, and built a portal site, which reduced the effort required for aggregation and achieved improvements in productivity and standardization. [Challenge] ■ Labor involved in data aggregation due to the use of paper for daily reports and inspection forms *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We will introduce a case where 3D data before and after construction is regularly updated and serves as the foundation for project progress management during large-scale renovations. Operational status data and maintenance history are linked to equipment pins on the 3D model, enabling intuitive management. On the "FACTORY 3M CLOUD," all stakeholders can visualize progress in real-time, allowing for intuitive asset management. [Case Overview] ■ Asset management through linking equipment ledgers and 3D models ■ Foundation for project progress management during large-scale renovations ■ Linking operational status data and maintenance history to equipment pins on the 3D model ■ Real-time visualization of progress for all stakeholders *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case where the integration of P&ID drawings and point cloud data was achieved without carrying paper drawings to the site. Information from the drawings is linked on the point cloud, allowing for remote verification of connections such as piping. The reduction of travel time for on-site verification using "FACTORY 3M CLOUD" significantly contributes to improving operational efficiency. 【Case Overview】 ■ Integration of P&ID drawings and point cloud data ■ Remote verification without carrying paper drawings to the site ■ Information from the drawings linked on the point cloud ■ Reduction of travel time for on-site verification *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We will introduce examples of data collaboration, such as layout synchronization, between departments like design, manufacturing, and maintenance, as well as with partner companies. Access rights are finely configured to safely share only specific area data with external vendors. By allowing all stakeholders to reference the "FACTORY 3M CLOUD," we prevent rework and oversight in confirmations before they occur. 【Case Overview】 ■ Layout synchronization between departments and data collaboration with partner companies ■ Preventing rework and oversight by allowing all stakeholders to reference the information ■ Fine configuration of access rights ■ Safe sharing of data from specific areas with external vendors *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case where the management of drawings on paper and local folders, which had become personalized, was abolished, establishing the first step towards factory digital transformation (DX). Until now, point cloud data was heavy, making it difficult to smoothly operate and verify on a regular PC. By utilizing "FACTORY 3M CLOUD," even heavy point cloud data can be easily manipulated on a regular PC. 【Case Overview】 ■ Smoothly operate heavy point cloud data ■ Complete paperless transition through cloud migration of drawing management ■ Abolishment of drawing management on paper and local folders ■ Establishment of the first step towards factory DX *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We will introduce a case study on managing multiple factory data from both domestic and international locations on a single platform, enabling integrated management and cross-comparison. Previously, 3D and point cloud data from factories were scattered, posing significant challenges for centralized management and searchability. By consolidating this data into a dedicated cloud platform, "FACTORY 3M CLOUD," anyone can instantly access the information whenever needed. [Case Overview] - Centralized management of 3D data across the company and improved searchability - Integrated management and cross-comparison of factory data from multiple locations - Consolidation of scattered factory 3D and point cloud data onto the cloud - Instant access for anyone whenever needed *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case where the 3D scanning technology "SPLAT TWIN" was utilized for relocation simulations during factory layout changes and for providing accurate maintenance instructions to external contractors. When introducing new equipment, it is possible to simulate by placing 3D models of the planned relocations on the clearance and transport routes with existing equipment. Construction areas that are difficult to convey through verbal communication or 2D drawings can be accurately communicated by sharing a 3D space. [Case Overview] ■ Relocation simulations during factory layout changes and accurate maintenance instructions to external contractors ■ Simulation possible by placing 3D models of planned relocations on the clearance and transport routes with existing equipment ■ Construction areas that are difficult to convey through verbal communication or 2D drawings can be accurately communicated by sharing a 3D space *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case study of our 3D scanning technology "SPLAT TWIN." By placing pins in the 3D space at inspection points, we ensure a reliable handover of inspection work without any omissions. It is possible to link the tacit knowledge from the field to the relevant locations in the 3D space, turning it into a digital asset shared across the company. [Case Overview] ■ Visualization of regular inspection points in 3D space, digitizing the field's "tacit knowledge" ■ Placing pins in the 3D space at inspection points to ensure a reliable handover of inspection work without omissions ■ Linking previously verbalized field know-how to the relevant locations in the 3D space, creating a digital asset shared across the company *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case study utilizing our 3D scanning technology "SPLAT TWIN." Even in locations where it is difficult to grasp the situation with just IoT sensor data, we quickly detect the initial signs of trouble. When an error occurs, technicians at our headquarters can understand the on-site situation in a realistic 3D space and provide accurate recovery instructions. 【Case Overview】 ■ Real-time trouble response through the integration of IoT sensors and 3D technology ■ Quickly detecting the initial signs of trouble to prevent escalation ■ When an error occurs, technicians at headquarters grasp the on-site situation in a realistic 3D space and provide accurate recovery instructions *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case where the 3D scan "SPLAT TWIN" was utilized for OJT pre-learning for new employees and foreign workers. In high-risk situations such as working at heights or handling hazardous materials, we can safely confirm locations that are difficult to access in reality within a 3D space. It is possible to attach various educational materials, significantly enhancing the quality and retention rate of safety training. [Case Overview] ■ OJT pre-learning for new employees and foreign workers (Educational Revolution) ■ Attachment of video manuals and other materials is also possible ■ Safely confirm high-risk locations such as working at heights or handling hazardous materials within a 3D space, which are difficult to access in reality *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case study of our 3D scanning technology "SPLAT TWIN." We digitize the excellent line layout and workflow of the mother factory in 3D and quickly deploy it to other domestic and international locations. We solve the challenges of detailed expressions that are difficult with typical mesh data or point cloud data through realistic 3D representation. 【Case Overview】 - Remote measurement related to changes in the site layout - Effective simulations can be conducted remotely in a visually intuitive 3D space - We digitize the excellent line layout and workflow of the mother factory in 3D and quickly deploy it to other domestic and international locations *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce an example of using "KIMOTO360" for pre-construction meetings before renovation work. The current conditions of areas such as the ceiling space and piping, which are difficult to understand from just the drawings, are visualized using 360-degree images. By accurately sharing the on-site situation among stakeholders, we facilitate smoother discussions with the construction contractors. [Case Overview] ■ Purpose of pre-construction meetings before renovation work *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case study utilizing "KIMOTO360" as a fixed asset layout diagram. The layout of fixed assets within the factory is visualized in a 360-degree image, aiming to improve the efficiency of management tasks. It contributes to reducing the time spent on operations by smoothly transferring the on-site management of fixed assets, which has been dependent on veterans, to younger staff. [Case Overview] ■ Utilization as a fixed asset layout diagram *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We will introduce a case study utilizing "KIMOTO360" as a platform for centralized data management. Files and data related to equipment, such as equipment management, training, and maintenance information, are centrally managed in a 360-degree space. This has resolved the issues of poor information sharing and individual reliance, allowing both veterans and younger staff to share information appropriately. 【Case Overview】 ■ Utilization of a platform for centralized data management *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We will introduce examples of using "KIMOTO360" for safety education and hazard prediction for new employees. Before entering the actual factory, we allow them to check hazardous areas and blind spots of machinery, thereby enhancing their safety awareness. By attaching data such as video manuals, we achieve further educational effectiveness. [Case Overview] ■ Safety education and hazard prediction for new employees *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We will introduce a case study on utilizing "KIMOTO360" for pre-checks and preparations for equipment maintenance. Before maintenance personnel head to the site, they can access maintenance information and manuals for the equipment in question. By conducting pre-checks in a 360-degree panoramic virtual space, we contribute to improved work efficiency. 【Case Overview】 ■ Pre-checks and preparations for equipment maintenance *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
"KIMOTO360 EDITOR & VIEWER" is software that utilizes images from 360° cameras for centralized management of information and visualization. It allows for the connection of multiple 360° images, enabling users to verify as if they are on-site. Additionally, various file formats can be assigned as attributes within the 360° images. It facilitates sharing so that anyone can view the information when needed, eliminating dependency on specific individuals and significantly improving operational efficiency. 【Features】 ■ 360° View ■ Linking Function ■ Attribute Data Assignment ■ Offline Support *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
"Window" is a system that enables communication without feeling distance, whether on-site or in the office. It creates an environment where you can see, talk, and make decisions on the spot without spending time on travel or preparation. You can connect instantly and have casual conversations with minimal audio delay for a natural dialogue. With a 55-inch 4K monitor that displays life-sized images, it allows for conversations that feel as if you are talking face-to-face. [Features] ■ Sense of presence ■ Clear audio ■ Always connected ■ Stable communication environment *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce a case where we improved the workflow of "liquid production tasks" and "inspection operations" at our manufacturing site, the factory, and promoted digital transformation (DX). We automated the checking of manufacturing conditions and actual measurements. By effectively utilizing data and visualizing the on-site situation, we maximized the effects and value of digitalization. Through the review of workflows, database creation, and the establishment of a portal site, we achieved a reduction in work time and a significant decrease in manufacturing documentation. [Case Overview] ■ Manufacturing Workflow Reform - Workflow review + Database + Portal site ■ Reduction Effects - 44% reduction in manufacturing documentation - Annual reduction of 1,690 hours in work time *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
We would like to introduce our practical case study in which we thoroughly reviewed paper documents stored in our offices and factories. As a result of the review, approximately 745 meters worth of A4 paper was discarded, equivalent to about one-fifth of the height of Mount Fuji. Additionally, benefits such as enhanced information security, improved workflows, and increased productivity were also realized. [Case Overview (Partial)] ■ Overwhelming Cost Reduction - Space reduction equivalent to about 145 six-drawer cabinets - Annual savings of approximately 26 million yen in space and rent costs *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
"FACTORY 3M CLOUD" is an all-in-one service that covers everything from point cloud acquisition to 3D model creation, as well as centralized management, operation, and sharing in the cloud. It allows for easy remote verification of the site, automatically converting point cloud data into mesh models, significantly improving visibility and leading to time savings in site understanding. In relocation simulations, you can overlay 3D models on point cloud data for verification, which is effective in improving the accuracy of preliminary reviews and consensus building. 【Main Features (Partial)】 ■ Check/share data such as point clouds and 3D models on the cloud ■ Crop function ■ Data comparison ■ Annotation/tagging function / real-time sharing via email ■ Measurement function *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration
"SPLAT TWIN" is a 3D scanning technology that can reproduce photographic-like natural visual information. It solves issues such as the difficulty in expressing fine details, reflections, and transparency that are common with standard mesh and point cloud data, as well as the heaviness of data that leads to sluggish performance, through realistic 3D representation. It can create 3D models down to a single leaf of vegetation, and it accurately depicts reflections on surfaces like glass and metal. With lightweight data, it allows for quick situational awareness, enabling smooth operation. [Features] ■ Persuasive detailed representation ■ Realistic expression of transparency and mirror surfaces ■ Smooth operation is possible *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration