See Contract Services's detailed category ranking
OK in narrow spaces! A compact pressure reducing valve with water-saving effects [Registered product of the Japan Water Works Association, compliant with RoHS2 directive].
We provide comprehensive support for the chemical business! If you are looking for synthesis, experimentation, packaging, blending, or mass production facilities for chemicals, please contact us first!
Comprehensive in-house support for measuring instruments across a wide range of fields! Some JCSS calibrations are also available.
We are the only domestic manufacturer of rotating horizontal multi-axis continuous wall machines, offering models suitable for use in confined spaces with height restrictions.
Easy temperature control and environmentally friendly heating power supply device! We offer a lineup tailored for a wide range of applications.
The average height of a self-parking multi-story parking garage is 2 to 2.5 meters! An explanation of self-parking multi-story garages and their height.
Conducted resin injection work while managing levels! A case completed in 4 days.
We can provide cost-effective proposals such as temporary measures and partial equipment enhancements in the current state of wastewater treatment.
The design intent becomes clear! Obtain parts more freely! Also suitable for updating existing equipment and retrofitting.
24-hour remote monitoring of utility facilities, optimizing energy conservation and maintenance operations for the entire factory!
After the equipment arrives, it will be shipped within 5 business days in principle. It supports various measuring instruments, including field devices for different manufacturers' measuring instruments and plant equipment.
Corrected a maximum settlement of 46mm! A case where the distortion of the door frame caused by settlement was resolved.
A maximum settlement of 500mm occurred! An example of correction using a combination of the up-con method and single pipe pile driving method.
Maximum sinking of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.
A case study of correcting liquefied ground due to the earthquake! A maximum settlement of about 60mm was corrected in a day and a half.
A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.
Possible to carry out without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.
The ground floor slab sank due to the earthquake! A case study of improving the gaps between the floor and walls, and between the walls and ceiling.
A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.
No need for large-scale demolition work! Here is an example of correcting a settlement of up to 95mm in just two days of construction.
Even in cases where the space between neighboring properties is very narrow, construction is possible! A maximum settlement of 66mm can be corrected in 3 days.
Disaster recovery and emergency response for roads! 100% filling of gaps and voids with polyurethane resin.
An example of quickly correcting the unevenness in the concrete pavement slab at a highway toll booth!
Our method, which raises the CO pavement using the foaming pressure of rigid urethane resin, has been adopted!
Performed repairs for the subsidence of the toll booth! Partial corrections were also made in areas where there was a step difference with the U-shaped drainage ditch.
The construction period is 1 day! A case study of the correction work for the sinking of the platform section inside the toll booth conducted in Saitama Prefecture in December 2012.
Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.
Correction of subsidence while checking the level! A case of pavement repair work at the entrance of a toll booth.
Repairing the apron step and gaps without removing the apron! A case where our construction method was adopted.
Correction of road surface irregularities and unevenness in a short construction period! Introducing examples of port facility repair work.
Injecting chemical solution to a depth of 20m! Permanent ground improvement: Chemical injection method (suspension and solution type)












































































































