[Case Study] Built integration processing between Outlook and sales management system in about one month.
The system construction cost is about 1/10 of what was expected. Achieved with the no-code data integration tool "ASTERIA Warp Core"!
We would like to introduce a case study of "ASTERIA Warp Core" implemented at ABC Corporation. The company was struggling to find a scheduler that could integrate with their sales management system, and even for schedulers that could connect via API, building the integration process was not easy. Therefore, they decided to implement our product. As a result, they were able to seamlessly integrate their sales management system with Outlook, allowing both systems to sync every minute. This enabled the sales team to utilize new information without having to be conscious of the timing of data reflection. *For more details, please refer to the PDF document or feel free to contact us.*
- Company:アステリア アステリア株式会社
- Price:10,000 yen-100,000 yen