Ballast Water Treatment System "ERMA FIRST FIT"
Two-stage treatment with filter + electrolysis! A product that meets the demands for price, performance, and safety.
"ERMA FIRST FIT" is a full electrolysis ballast water treatment system manufactured by ERMA FIRST. Despite being an electrolysis system, it can handle treatment at 0.9 PSU and is capable of processing in freshwater operations, making it suitable for treatment in freshwater areas. The components are manufactured by reputable high-quality manufacturers from the United States and Europe, and there is a wide service network for both new builds and retrofits worldwide, with numerous sales achievements. 【Features】 ■ No holding time ■ Hydrogen generation is close to zero, eliminating the need for hydrogen treatment measures ■ Low power consumption (average 19.8 kW per FIT1000 unit) ■ High cost performance (running and maintenance) ■ Flexible equipment installation requirements (horizontal, vertical, skid options, etc.) *For more details, please refer to the PDF materials or feel free to contact us.
- Company:シービーエスアイ
- Price:Other