List of Other contract services products
- classification:Other contract services
1621~1665 item / All 7922 items
The floor has sunk due to consolidation settlement! Voids (cavities) can be seen under the floor, and construction will be carried out by our company.
- Other contract services
Utilizing spring break for quick subsidence correction! The cycle from construction to restoration is short.
- Other contract services
Up to 60mm of subsidence in the central Slavic region! Ground compaction reinforcement with the foaming pressure of polyurethane resin.
- Other contract services
The foamed polyurethane resin compressively strengthens the ground! It suppresses the occurrence of voids, cavities, and gaps after construction.
- Other contract services
We will introduce a case where the number of preparations was reduced, leading to a 15% shortening of delivery time and cost reduction!
- Processing Jig
- Other contract services
We have our own factory fully equipped. We accept the manufacturing of any type of tent or sheet.
- Other contract services
Decarbonization through the P-D-C-A cycle! We propose suitable renewable energy and energy-saving options.
- Other contract services
The first step towards DX transformation, "going paperless," is best left to the professionals.
- Other contract services
Corrected a maximum settlement of 46mm! A case where the distortion of the door frame caused by settlement was resolved.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
A case study of correcting liquefied ground due to the earthquake! A maximum settlement of about 60mm was corrected in a day and a half.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
A maximum settlement of 500mm occurred! An example of correction using a combination of the up-con method and single pipe pile driving method.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Maximum sinking of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Our method, which raises the CO pavement using the foaming pressure of rigid urethane resin, has been adopted!
- Other contract services
- Exhibition planning/construction
- Calibration and repair
The construction period is 1 day! A case study of the correction work for the sinking of the platform section inside the toll booth conducted in Saitama Prefecture in December 2012.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Correction of road surface irregularities and unevenness in a short construction period! Introducing examples of port facility repair work.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Possible to carry out without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
The ground floor slab sank due to the earthquake! A case study of improving the gaps between the floor and walls, and between the walls and ceiling.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
No need for large-scale demolition work! Here is an example of correcting a settlement of up to 95mm in just two days of construction.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Even in cases where the space between neighboring properties is very narrow, construction is possible! A maximum settlement of 66mm can be corrected in 3 days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Disaster recovery and emergency response for roads! 100% filling of gaps and voids with polyurethane resin.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
An example of quickly correcting the unevenness in the concrete pavement slab at a highway toll booth!
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Performed repairs for the subsidence of the toll booth! Partial corrections were also made in areas where there was a step difference with the U-shaped drainage ditch.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Correction of subsidence while checking the level! A case of pavement repair work at the entrance of a toll booth.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Conducted resin injection work while managing levels! A case completed in 4 days.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
Repairing the apron step and gaps without removing the apron! A case where our construction method was adopted.
- Other contract services
- Exhibition planning/construction
- Calibration and repair
A case created to have a clean appearance while maintaining a relaxed atmosphere without becoming too stiff!
- Other contract services
- Corporate information portal/groupware
A case created with the intention of conveying that it is an award with a historical significance!
- Other contract services
- Corporate information portal/groupware
Expressing an atmosphere where activities can be carried out brightly and with peace of mind! We also take accessibility into consideration.
- Other contract services
- Corporate information portal/groupware
We can provide both website creation and maintenance in a one-stop service!
- Other services
- Other contract services
Designing logo marks and logotypes! A case of production considering accessibility.
- Other contract services
- Corporate information portal/groupware
The main color is sky blue! We have made efforts to clearly display the business content and location.
- Other contract services
- Corporate information portal/groupware
Using the performance information management system! Announcements of winners and various performance information from Osaka are published.
- Other contract services
- Corporate information portal/groupware
Disseminating various information about intractable diseases! Designed to be simple and easy to find the information you want.
- Other contract services
- Corporate information portal/groupware
No damage to the actual machine, no danger! The electrical control plan progresses regardless of the progress of equipment manufacturing.
- 3D CAD
- Other contract services
A top-class group of engineers in the country. Supporting the realization of FA through dedicated machine development with an in-house integrated system.
- Other contract services
Shall we promote local procurement? Leave the specification confirmation with the local area and the progress of the factory to us!
- Machinery and equipment installation/dismantling/relocation
- Other contract services
It is possible to create connections with a new user base through the notebook! You can differentiate from competing products.
- Other contract services
During production, care is taken to ensure that there are no dimensional errors diagonally during the assembly of the square pipes!
- Other contract services
We received a request from a design office to create a "functional gatepost"!
- Other contract services
Sharing customer requests among engineers! Producing while aligning on details.
- Other contract services
Predict the warping to some extent when welding, and perform reverse warping during welding to finish the product without distortion!
- Other contract services
After multiple meetings based on technology, budget, and preferences, we have reached a satisfactory form! The material is SUS304.
- Other contract services