iPROS Manufacturing
  • Search for products by classification category

    • Electronic Components and Modules
      Electronic Components and Modules
      55974items
    • Machinery Parts
      Machinery Parts
      71027items
    • Manufacturing and processing machinery
      Manufacturing and processing machinery
      95562items
    • Scientific and Physics Equipment
      Scientific and Physics Equipment
      33043items
    • Materials
      Materials
      34915items
    • Measurement and Analysis
      Measurement and Analysis
      52781items
    • Image Processing
      Image Processing
      14553items
    • Control and Electrical Equipment
      Control and Electrical Equipment
      50324items
    • Tools, consumables, and supplies
      Tools, consumables, and supplies
      62921items
    • Design and production support
      Design and production support
      11729items
    • IT/Network
      IT/Network
      40575items
    • Office
      Office
      13226items
    • Business support services
      Business support services
      32047items
    • Seminars and Skill Development
      Seminars and Skill Development
      5717items
    • Pharmaceutical and food related
      Pharmaceutical and food related
      23817items
    • others
      59808items
  • Search for companies by industry

    • Manufacturing and processing contract
      7355
    • others
      5040
    • Industrial Machinery
      4430
    • Machine elements and parts
      3291
    • Other manufacturing
      2871
    • IT/Telecommunications
      2520
    • Trading company/Wholesale
      2456
    • Industrial Electrical Equipment
      2316
    • Building materials, supplies and fixtures
      1817
    • software
      1645
    • Electronic Components and Semiconductors
      1576
    • Resin/Plastic
      1492
    • Service Industry
      1413
    • Testing, Analysis and Measurement
      1131
    • Ferrous/Non-ferrous metals
      981
    • environment
      702
    • Chemical
      630
    • Automobiles and Transportation Equipment
      559
    • Printing Industry
      506
    • Information and Communications
      436
    • Consumer Electronics
      422
    • Energy
      321
    • Rubber products
      311
    • Food Machinery
      303
    • Optical Instruments
      282
    • robot
      274
    • fiber
      250
    • Paper and pulp
      232
    • Electricity, Gas and Water Industry
      172
    • Pharmaceuticals and Biotechnology
      165
    • Warehousing and transport related industries
      145
    • Glass and clay products
      142
    • Food and Beverage
      134
    • CAD/CAM
      122
    • retail
      111
    • Educational and Research Institutions
      107
    • Medical Devices
      101
    • Ceramics
      96
    • wood
      88
    • Transportation
      83
    • Petroleum and coal products
      61
    • Medical and Welfare
      61
    • Shipbuilding and heavy machinery
      52
    • Aviation & Aerospace
      48
    • Fisheries, Agriculture and Forestry
      39
    • Public interest/special/independent administrative agency
      24
    • self-employed
      23
    • equipment
      20
    • Mining
      17
    • Research and development equipment and devices
      17
    • Materials
      16
    • Government
      15
    • Finance, securities and insurance
      13
    • Individual
      10
    • Restaurants and accommodations
      8
    • cosmetics
      8
    • Police, Fire Department, Self-Defense Forces
      7
    • Laboratory Equipment and Consumables
      3
    • Contracted research
      3
    • Raw materials for reagents and chemicals
      2
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Electronic Components and Modules
  • Machinery Parts
  • Manufacturing and processing machinery
  • Scientific and Physics Equipment
  • Materials
  • Measurement and Analysis
  • Image Processing
  • Control and Electrical Equipment
  • Tools, consumables, and supplies
  • Design and production support
  • IT/Network
  • Office
  • Business support services
  • Seminars and Skill Development
  • Pharmaceutical and food related
  • others
Search for Companies
  • Search for companies by industry

  • Manufacturing and processing contract
  • others
  • Industrial Machinery
  • Machine elements and parts
  • Other manufacturing
  • IT/Telecommunications
  • Trading company/Wholesale
  • Industrial Electrical Equipment
  • Building materials, supplies and fixtures
  • software
  • Electronic Components and Semiconductors
  • Resin/Plastic
  • Service Industry
  • Testing, Analysis and Measurement
  • Ferrous/Non-ferrous metals
  • environment
  • Chemical
  • Automobiles and Transportation Equipment
  • Printing Industry
  • Information and Communications
  • Consumer Electronics
  • Energy
  • Rubber products
  • Food Machinery
  • Optical Instruments
  • robot
  • fiber
  • Paper and pulp
  • Electricity, Gas and Water Industry
  • Pharmaceuticals and Biotechnology
  • Warehousing and transport related industries
  • Glass and clay products
  • Food and Beverage
  • CAD/CAM
  • retail
  • Educational and Research Institutions
  • Medical Devices
  • Ceramics
  • wood
  • Transportation
  • Petroleum and coal products
  • Medical and Welfare
  • Shipbuilding and heavy machinery
  • Aviation & Aerospace
  • Fisheries, Agriculture and Forestry
  • Public interest/special/independent administrative agency
  • self-employed
  • equipment
  • Mining
  • Research and development equipment and devices
  • Materials
  • Government
  • Finance, securities and insurance
  • Individual
  • Restaurants and accommodations
  • cosmetics
  • Police, Fire Department, Self-Defense Forces
  • Laboratory Equipment and Consumables
  • Contracted research
  • Raw materials for reagents and chemicals
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Building materials, supplies and fixtures
  3. メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡
  4. Product/Service List
Building materials, supplies and fixtures
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡

EstablishmentJuly 2001
capital2000Ten thousand
number of employees100
addressTokyo/Edogawa-ku/5-2-3 Nishikasai, NEXTAGE Nishikasai 7th floor
phone03-5878-9101
  • Special site
  • Official site
last updated:May 12, 2025
メインマークlogo
  • Contact this company

    Contact Us Online
  • Before making an inquiry

    Download PDF
  • Company information
  • Products/Services(52)
  • catalog(28)
  • news(31)

メインマーク List of Products and Services

  • category

1~45 item / All 52 items

Displayed results

Filter by category

Teratec method for floor subsidence correction and void filling. Teratec method for floor subsidence correction and void filling.
Teratec Construction Method Case Studies Teratec Construction Method Case Studies
Ground improvement methods directly beneath the building. Ground improvement methods directly beneath the building.
Drain pipe Drain pipe
Building vibration survey and structural analysis services Building vibration survey and structural analysis services
class="retina-image"

Achieve a "smooth floor" in an auto repair shop in just one day! Measures against floor sinking and unevenness.

The Teratec method achieves the "smooth floor," one of the certification standards for the specific automobile maintenance system, in as little as one day!

●What is the Teratec Method… It is a patented method that injects rigid polyurethane foam "Teratec resin" under concrete floors, filling voids beneath the floor with its expansion force and leveling sunken floors. Since it does not damage the floor, there is no need to move shelves or machinery, allowing operations to continue without interruption! ▼Various issues faced by automotive maintenance shops that have been resolved - Malfunctions in measurement equipment for vehicle inspections - Inefficiencies in maintenance and inspections due to floor unevenness - Severe floor deterioration raising concerns about subsidence and safety - Feeling of shaking when moving heavy vehicles in and out - Poor drainage affecting hygiene and mobility - Ground subsidence occurring due to earthquakes or heavy rain ▼Features of the Teratec Method ■ Does not damage the floor ■ Does not stop on-site operations ■ 4,200 successful installations ■ Nationwide support 24/7, 365 days a year ■ Patented method ■ 10-year warranty for peace of mind: maximum warranty limit of 50 million yen Please feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Ground Improvement] "Permeation Solidification Injection Method" Ground improvement under buildings.

Injecting chemical solution to a depth of 20m! Permanent ground improvement: Chemical injection method (suspension and solution type)

"Permeation Solidification Injection Method" This is a permanent chemical injection method that selects injection materials and methods based on ground information to strengthen the ground and prevent water infiltration. It uses durable grout materials to permeate a wide area for ground improvement. 【Features】 ■ Permanent ground improvement ■ Allows for significant reduction in the number of injections, as it can permeate the agent over a wide area at low pressure from a large injection source ■ No surface uplift occurs after injection ■ No excavation work is required, thus no impact on adjacent structures ■ Minimal sludge discharge *For more details, please refer to the PDF materials or feel free to contact us. Toll-free number: 0120-873-835

  • Other contract services
  • Machinery and equipment installation/dismantling/relocation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Polyurethane injection "Teratec method" for addressing floor tilt, subsidence, step differences, and voids.

If you're troubled by floor tilting, sinking, unevenness, or voids! With construction that doesn't damage the floor, we won't stop operations and will provide an overwhelmingly short construction period!

●What is the Teratech Method... It is a patented method that injects rigid polyurethane foam "Teratech resin" under concrete floors, filling voids beneath the floor with its expansion force and leveling sunken floors. Since it does not damage the floor, there is no need to move shelves or machinery, allowing operations to continue without interruption! ▼Various issues we have resolved 【Tilt】 - Struggling with uneven factory floors. I want to make the concrete floor flat. - The warehouse floor has a gentle slope, causing automatic racks to misalign and malfunction. - The area where machinery is installed has sunk, resulting in tilting of the machinery. 【Settlement】 - The concrete floor is sinking towards the center. - The gymnasium floor at the school is sinking except for the underground beams. - There are depressions on the warehouse floor, raising concerns about product storage and worker safety. 【Step Differences】 - Struggling with floor step differences and tilts. I have repaired it with additional concrete but want a fundamental solution. - There is a step at the entrance of the refrigerated warehouse, making it difficult for forklifts to pass. 【Hollows and Gaps】 - The vibration of the machinery has worsened. I would like you to check for any voids. - There are cracks in the floor where trucks drive. I am concerned about the possibility of voids beneath the floor. - Due to flooding, the soil beneath the floor has been washed away, creating voids.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Numerous achievements in public works! Settlement floor correction method 'Teratec Method'

Teratec method: It's not just about replacement and resurfacing! A floor repair method!

【Numerous achievements with the Ministry of Land, Infrastructure, Transport and Tourism and various local governments】 Quickly and fundamentally resolve issues such as floor tilting, unevenness in public facilities, and voids under roads. Are you still considering just replacement or resurfacing? The Teratec method is chosen for public works as well as warehouses, factories, and stores, with a track record of 4,200 projects! ▼ What is the Teratec method? The "Teratec method" is a patented technique that injects Teratec resin under concrete floors to fill voids caused by sinking, restoring the floor to a level position using the resin's expansion force. "Using the expansion force of Teratec resin, we lift and level sinking or tilted floors." This innovative idea has made it possible to restore floors to a level position quickly without destruction. 【Features of the Teratec method】 - No. 1 market share in Japan* (4,200 construction achievements) - Available for construction 24 hours a day, 365 days a year - Reliable technology with patented and former NETIS registration (QS-080007) * (Market share for sinking correction work using urethane injection method / based on our research) ▶ For more details, please view the catalog from "PDF Download." Feel free to contact us by phone (0120-873-835) or email (info@mainmark.co.jp).

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Are you only considering redoing and repainting?" A method with overwhelmingly short construction time.

Short construction period! No damage to the floor! No interruption to operations! Available 24/7 throughout Japan.

"I replaced it six months ago. If I had known about this method earlier." This is a voice from our customers that we hear at exhibitions and other events. 【What is the Teratech Method?】 Unlike traditional methods of replacement or resurfacing, this method restores floor slopes, subsidence, and unevenness to a level surface without breaking the floor and without stopping operations. It is a patented method that injects Teratech resin beneath concrete floors (roads) to fill voids under the floor with its expanding force, bringing the sunken floor back to level. Since it uses injection holes smaller than a one-yen coin (6mm) to inject expanding resin without breaking the floor, there is no need to remove goods or machinery. This means there are no additional costs for moving items, temporary storage during construction, or disposal of industrial waste, aside from the construction costs. 【Main Features】 1: Can be constructed without stopping operations 2: Short construction period (150 to 200 square meters in about 8 hours) 3: No need to move goods, racks, or machinery since the floor is not broken 4: Normal use is possible immediately after construction For more details, please view the catalog from the "PDF Download" section. Feel free to contact us by phone (0120-873-835) or email (info@mainmark.co.jp).

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Correction of floor tilt and subsidence with zero downtime! "Teratec Method"

No noise and night construction is possible! We will correct the floor's tilt and subsidence with "zero" downtime!

The "Teratec Method" restores the deflection and distortion of concrete floors to a level surface within a day without stopping operations. Unlike conventional methods, there is no need to move equipment or materials. Corrections can be made without breaking the floor and without halting operations. Additionally, we have over 300 construction achievements annually in various facilities, including metal processing factories, logistics warehouses, food factories, offices, machinery manufacturing plants, supermarkets, material warehouses, condominiums, residential equipment manufacturing plants, and precision machinery factories. 【Features】 ■ Does not stop site operations ■ 4,200 construction achievements ■ Available nationwide 24/7, 365 days a year ■ Patent method ■ 10-year warranty for peace of mind ■ Maximum warranty construction limit of 50 million yen *For more details, please refer to the PDF materials or feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Achieve the levelness of floors necessary for factory and warehouse automation! 'TerraTech Method'

The first step in automating factories and warehouses starts with the level of the floor. You can rely on us for issues related to floor tilt and subsidence.

The "Teratec Method" is a technique for leveling floors that have tilted or settled in a short construction period. In the current era where AI and big data are advancing in delivery management and the automation of factories and warehouses, the leveling of facility floors is an important theme for the introduction of automated equipment. We solve concerns such as: - "The installation of high racks has become unstable for liner compatibility." - "There is a risk of the high-pick work vehicle tipping over, making it unusable." - "The stacking of pallets and nestainers is becoming tilted and cannot be done." 【Features】 - Does not damage the floor - Short construction period - Patent obtained - Over 4,200 construction achievements *For more details, please refer to the PDF materials or feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pest Control: The 'TerraTech Method' fills habitats and entry points with resin.

Leave pest control and foreign matter intrusion prevention for factories and warehouses to us! We will fill the gaps and shut out intrusions!

The "Teratec Method" is a technique for filling voids under floors that have developed over time with Teratec resin. The voids under the floor created by aging deterioration become ideal hiding places for insects. Harmful organisms breed using the dirty water from cleaning the floors as a nutrient source, and they invade the facility through cracks and routes where contaminated water flows in. This method not only eliminates the entry points and habitats for pests by filling the voids under the floor, but it also reduces the risk of insect emergence from beneath the floor. Furthermore, it can be implemented at night, allowing the factory to operate from the morning. 【Features】 ■ Fills habitats and blocks entry points ■ Long-term pest control ■ Can be implemented without stopping operations ■ Nationwide construction support 24 hours a day, 365 days a year *For more details, please refer to the PDF materials or feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Measures against management risks! Prevention of worsening tilt and hollowing out 'TerraTech Method'

Is it okay to leave the floor slant caused by earthquakes or ground subsidence as it is? Shall we start risk management from the floor?

The tilt and hollowing of the floor can cause various issues, leading to management risks. The "Teratec Method" is recommended for addressing tilt and hollowing and preventing deterioration. This patented method involves injecting Teratec resin under the concrete floor slab, using its expansion force to fill the voids beneath the floor and restore the sunken floor to a level position. It corrects the "tilt," "sinking," "steps," and "deflection" of the concrete floor without damaging it and without interrupting operations. 【Management Risks Due to Floor Tilt (Excerpt)】 ■ Human Damage - Employees tripping over steps and getting injured, leading to labor accident issues - Employees experiencing health problems such as poor physical condition, shoulder stiffness, and headaches ■ Quality and Function Decline - Machines unable to maintain level, resulting in product defects (quality decline) - Vibrations causing inaccuracies in machines and inspection equipment (affecting production) ■ Decreased Work Efficiency - Time spent adjusting machine levels - Safety devices on automatic transport systems activating, halting operations *For more details, please refer to the PDF document or feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The first step in automating factories and warehouses starts with floor leveling [with case studies included].

With the advancement of factory and warehouse automation using FA machines and AGVs, the leveling of facility floors has become a "mandatory requirement" for equipment installation.

Have you ever experienced this? If the floor is not level... ■ It affects the precision of robots in packaging and boxing operations! ■ The installation of high-rise racks becomes a concern for liner compatibility! ■ There is a risk of high-level picking vehicles tipping over and becoming unusable! ■ There may be obstacles to the operation of AGVs (automated guided vehicles)! ■ High stacking of pallets and nestainers becomes tilted and impossible! ≪The 'Teratec Method' levels out floor inclinations and subsidence in a short construction period.≫ ◆ What is the 'Teratec Method'? Is your factory or warehouse's concrete floor sloped or sunken? The Teratec Method is a patented technique that injects Teratec resin under the concrete floor, using its expansion force to return the sunken floor to level and fill any voids beneath the floor. It corrects the "tilt," "subsidence," "steps," and "deflection" of concrete floors without breaking them, achieving a level surface in a short time.

  • Other machine tools

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The first step in warehouse automation is the "Terra Tech Method" from the level of the floor.

Currently, with the advancement of delivery management and warehouse automation utilizing AI and big data, the levelness of the facility's floor is an important theme for the introduction of automation equipment.

If the floor is not level... ☑ The installation of high-rise racks will require liner support, causing anxiety! ☑ There is a possibility that high-pick operators may fall, making it unusable! ☑ There may be obstacles to the operation of AGVs (automated guided vehicles)! ☑ High stacking of pallets and nestainers may become tilted and impossible! The "TerraTech Method" levels the floor's tilt and subsidence in a short construction period. ◆ What is the TerraTech Method? Is your warehouse's concrete floor tilted or sunken? The TerraTech Method involves injecting TerraTech resin beneath the concrete floor, using its expansion force to return the sunken floor to level and fill any voids underneath. This patented method corrects the "tilt," "sinking," "steps," and "deflection" of the concrete floor without damaging it, and does so in a short period. Please feel free to contact us. Toll-free number: 0120-873-835

  • Other machine tools

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

For correcting the slope and subsidence of earthen floors in factories, warehouses, and stores, use the "TerraTech Method."

Correcting the slope, subsidence, and unevenness of the concrete floor without stopping. No need to move machinery. Available for surveys and construction 24 hours a day, 365 days a year across Japan!

We quickly correct the tilting, sagging, distortion, and steps of factory, warehouse, store, and shopping center floors caused by ground subsidence by injecting a special foamed urethane resin called "Teratec Resin." ◆ Teratec Method * A preliminary investigation of the voids under the floor will be conducted. 1. Measure the tilt of the floor. 2. Drill a 6mm diameter hole at the correction point. 3. Use proprietary equipment to inject resin under the floor slab. 4. The injected resin begins to expand instantly. This expansion force compresses and strengthens the ground, pushing the floor upward. 5. Corrections are made while measuring the floor movement in millimeters. ◆ Features of Teratec Resin ◎ Strong → Withstands a minimum load of 19 tons per square meter. ◎ Light → Weighs about 50kg per cubic meter (1/30 of mortar). ◎ Fast → Curing time is approximately 30 minutes, allowing heavy trucks to operate immediately after construction. Utilizing these features, we carry out short-term construction without stopping operations. The standard construction area per day (8 hours) is 200 square meters. We accommodate factories, warehouses, and stores ranging from 30 square meters to several thousand square meters. Please feel free to contact us. Toll-free number: 0120-873-835

  • Other machine tools

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Unevenness Correction" Correction of uneven concrete floors "TerraTech Method

We will quickly fix the "wobbling" and "unevenness" at the floor joints caused by the hollow space under the floor without damaging it!

Unevenness and bumps in the concrete floor that hinder the smooth operation of forklifts. Every time the forks pass, it rattles, causing damage to the cargo, items to fall from the forks, and requiring a reduction in speed, which significantly decreases work efficiency, doesn't it? Not only does the decline in work efficiency pose a problem, but it also presents numerous safety hazards for employees. With the "Teratec Method," we can eliminate the unevenness and bumps in the concrete floor without breaking it and without halting operations, all in a short time. Since we do not break the floor, there is almost no noise, debris, or dust generated. We offer services 24 hours a day, 365 days a year, including weekends and holidays! For adjustments to the unevenness and bumps in concrete floors in factories, warehouses, cold storage facilities, and distribution centers, please feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Leveling Correction] Leveling correction of concrete floors "Teratec Method"

We will quickly correct dangerous floor level differences in warehouses, factories, and stores without damaging the floor and without stopping operations. We provide services nationwide in Japan, 365 days a year.

The unevenness of concrete floors in factories, warehouses, and stores can hinder the smooth operation of forklifts, carts, and hand trucks, potentially leading to decreased work efficiency and compromising employee safety. With the "Teratec Method," we can correct these "unevenness" issues in a short time without breaking the floor and without stopping operations. **Features of the Teratec Method:** For concrete floors with issues such as tilting and sinking, we drill holes smaller than a one-yen coin and inject a special urethane resin called "Teratec Resin." The injected resin expands and spreads beneath the floor, filling voids (gaps). By injecting more resin, the expansion force of the resin lifts the floor back up to level. The resin can withstand a load of at least 19 tons per square meter. After the work is completed, it is possible to operate forklifts immediately. We can carry out the work on holidays, during year-end and New Year’s, and at night. We perform the work without breaking the floor and without interrupting regular operations. Please feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Free Inspection] Teratech Method to Fill Underfloor Cavities and Reduce Machine Vibration

Zero downtime for filling voids under the floor! The Teratec method reduces machine vibrations.

The machine, which should be firmly installed, has excessive vibrations despite regular adjustments. Leveling adjustments are needed repeatedly. It may be due to a hollow space under the floor. Machine vibrations negatively impact product quality and machine durability. Additionally, increased frequency of machine adjustments lowers work efficiency and poses various issues affecting employee health and safety. With the "Teratec Method," we can suppress machine vibrations without breaking the floor, moving the machines, or halting operations. If you are troubled by machine vibrations, please feel free to contact us. Toll-free number: 0120-873-835 [Examples of concerns regarding machine vibrations] - The operating noise of the machine has increased. - The machine shakes every time a forklift passes by. - Repeated leveling adjustments are being made to the machine. - Vibrations are causing inaccuracies in laser processing machines and inspection equipment. - Product defects are occurring due to machine vibrations. - Vibrations are affecting the health of on-site workers. - The machine's maintenance sensors are not measuring correctly due to vibrations. ★ We also accept inquiries from Asian countries such as Thailand, Vietnam, and Indonesia.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Pest Control] "TerraTech Method" Filling the voids under the floor without stopping operations.

Persistent pests in food factories and kitchens that keep reappearing even after extermination. The cause may be the hollow space under the dirt floor. The "TerraTech Method" will solve this!

The occurrence of pests is partly caused by "voids under the concrete floor." Voids under the floor, which can occur due to ground subsidence, have high humidity and little temperature variation throughout the year, making them ideal habitats and breeding grounds for pests. In the "Teratec Method," the voids below are examined with an endoscope to measure the volume of the voids. A small injection hole, smaller than a one-yen coin, is made in the floor surface with voids, and a special polyurethane resin called "Teratec Resin" is injected. The injected Teratec Resin expands within seconds, filling the voids. By filling the voids completely, it traps adult pests and eggs, eliminating their habitat and shutting off their entry routes. 【Features】 - Eliminates habitats and blocks entry routes - No use of insecticides, and no debris or dust generated - Does not interrupt operations in factories, warehouses, or stores (the construction period is just one day for an area of 200 square meters) - Accommodates construction on weekends or at night - Improves hygiene and operational efficiency by filling voids under the floor - Does not put a burden on the ground *For more details, please download the catalog or feel free to contact us. Toll-free number: 0120-873-835

  • Other food machinery

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Filling the voids under the footings" Measures against subsidence include the "TerraTech method.

The continuously sinking stepping board can be stabilized against subsidence with cavity filling.

■TerraTech Method for Suppressing Settlement of Footing Slabs The TerraTech method involves injecting a special polyurethane resin called "TerraTech" into voids that occur beneath footing slabs due to ground subsidence. By utilizing the expansion force of the resin, the voids are filled, the ground is compacted, and the footing slab is lifted. This patented method (Patent No. 4896949) addresses the concentrated loads at the edges of the footing slab caused by the formation of voids, which can accelerate the settlement of the slab and lead to issues such as wobbling. By filling the entire area beneath the footing slab with the TerraTech method, concentrated loads are alleviated, and the load is effectively transmitted to the ground. 【Features】 ◆ Installation of a single footing slab in one day ◆ The injected material is lightweight (about 1/30th the weight of mortar), significantly reducing the risk of ground subsidence due to its own weight ◆ The curing time of the injected material is quick (about 30 seconds), resulting in shorter road closure times and minimal penetration into the ground ◆ Does not use VOCs (volatile organic compounds), making it environmentally friendly and highly safe ◆ Reduces maintenance and repair costs that would otherwise need to be repeated multiple times ● For more details, please download the catalog or feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Filling of voids beneath the road" - "TerraTech method" for filling voids beneath paved roads.

Solve the problems of mortar filling! With a fast curing and lightweight injection material (about 1/30 of traditional mortar), it also reduces the risk of ground subsidence.

One of the causes of subsidence and collapse of paved roads is the hollowing out beneath the road. The "TerraTech Method" fills these voids without breaking the road, preventing subsidence and collapse. It achieves a reduction in maintenance and repair management costs. 【What is the TerraTech Method?】 A special lightweight and expandable urethane resin called "TerraTech Resin" is injected into the hollow areas beneath the road. The expansion force of the resin compacts the ground and fills the voids, suppressing subsidence. Since the curing time of the injected material is quick, the time for road restrictions is short, leading to significant reductions in labor and maintenance costs. 【Features】 ◆ Eliminates the risk of collapse in just a few hours ◆ TerraTech Resin cures quickly, resulting in shorter restriction times ◆ TerraTech Resin is a lightweight material (about 1/30 the weight of mortar), reducing the risk of re-subsidence due to its own weight ◆ Minimal construction by-products and waste generated ◆ Compressive strength of approximately 430 kN/m², stronger than flowable fill soil (300 kN/m²) ◆ No need for lifting and reinstallation of concrete pavement slabs, making it possible to work within tunnels ◆ The expansion force of TerraTech Resin compacts the subgrade, eliminating the need for compaction of the subgrade beneath the concrete pavement slabs. *For more details, please download the catalog or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Subsidance Correction" - Watch the "TerraTech Method" in a video.

Correcting floor subsidence caused by ground subsidence without stopping operations. "Subsidence correction and void filling" without dismantling the floor.

The "Teratech Method" is a construction technique that corrects the tilt, subsidence, and unevenness of concrete floors in factories, warehouses, stores, and shopping centers by injecting a special urethane resin called "Teratech Resin," without damaging the floor or halting operations. **Features of the Teratech Method:** - Injection holes smaller than a one-yen coin, with a diameter of 6 mm. There is no need to break the floor. - Specialized technicians perform corrections while measuring in millimeters. - Minimum load-bearing capacity of 19 tons per square meter. - Weighs approximately 10 kg per cubic meter, making it lightweight. *This is 1/20th the weight of concrete. - Short curing time of about 30 minutes, allowing large trucks to pass immediately after construction. - Standard daily construction area is 200 square meters (this may vary depending on construction conditions). Available nationwide in Japan. Construction achievements: Over 300 cases annually from Hokkaido to Okinawa. Total construction area: Over 1,177,000 square meters. We can handle projects ranging from 30 square meters to several thousand square meters for factories, warehouses, shopping centers, and more. Available nationwide in Japan, 24/7, feel free to consult us! Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Guarantee] 10-Year Warranty Service for Floor Leveling and Settlement Correction

10-year warranty service! We will "solve floor tilting and sinking without stopping operations."

The "Teratec Method" is a patented technique that uses the expansion force of a special polyurethane resin called "Teratec Resin," injected through small holes the size of a 1 yen coin, to "lift" and level concrete floors. It can be completed in one day for an area of 200 square meters. This method allows for the correction of sinking or tilting of concrete floors without breaking the floor or halting operations. We are pleased to announce that we have started a 10-year warranty service for our "Teratec" installations in factories, warehouses, shopping centers, and more. The maximum warranty limit is 50 million yen, providing peace of mind in case of unforeseen circumstances. 【Features of the Warranty Service】 ■ 10-year warranty based on insurance from a major insurance company (subject to review) ■ Covers costs for building restoration, ground restoration, and more ■ The maximum warranty limit for construction is a reassuring 50 million yen * Eligibility for the warranty can be confirmed through a preliminary review. * For more details, please refer to the materials or feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement Correction and Void Filling: TerraTech Method Case Study Collection Giveaway

Over 4,500 construction projects! With the extension of the lifespan of structures being considered now, the number of projects in factories, warehouses, and stores is rapidly increasing!

The Teratech method quickly corrects the tilting, sagging, distortion, and unevenness of floor slabs in factories, warehouses, stores, and shopping centers caused by ground subsidence by injecting a special urethane resin called "Teratech resin." ◆ Teratech Method * A cavity survey under the floor is conducted in advance. 1. Measure the tilt of the floor. 2. Drill holes with a diameter of 6 millimeters, smaller than a one-yen coin, at the correction points. 3. Use proprietary equipment to inject resin under the floor slab. 4. The injected resin begins to expand instantly. This expansion force compacts and strengthens the ground while pushing the floor upward. 5. Correct the floor while measuring its movement in millimeters. 【Features】 ■ Lifts from underneath the floor, so no damage to the floor. ■ Short construction period; can level an area of 200 square meters in one day. ■ Cost-effective compared to demolition and restoration work. ■ No demolition work means it is quiet and produces no waste. ■ Does not use water, so it does not dirty products or machinery. By addressing floor subsidence, tilting, and cavity filling, we can ensure the safety of workers and customers, improve work efficiency, and enhance the internal environment, leading to better business performance. Please feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil improvement: Correction of building tilt and soil improvement methods directly beneath the building.

Improve the ground directly beneath without destroying the building! Repair the tilted building and create a foundation that won't settle again. Five methods unique to specialized companies.

■Correction of Building Tilt and Ground Improvement Method Directly Under the Building "Comprehensive Catalog" This catalog introduces methods for correcting tilted buildings and creating ground that does not subside again. With extensive experience and knowledge in ground and construction, we can read necessary information from surveys and clarify the causes of subsidence. Based on a comprehensive understanding of various situations, we propose the most suitable methods tailored to your needs. We adopt hybrid methods that combine techniques according to the structural issues of the building, construction conditions, and the underground (ground) situation, providing proposals, designs, and construction that meet diverse needs. 【Featured Methods】 ○ High-Pressure Jet Mixing Method (Small Diameter Type, Medium to Large Diameter Type) ○ Underpinning Method ○ Side Pinning Method (Helical Pile Method) ○ GSIS Method ○ JOG Method For more details, please contact us or download the catalog. Toll-Free Number: 0120-873-835

  • Other processing machines

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Ground Improvement] "High-Pressure Jet Mixing Method" Ground improvement directly beneath the building.

Construct a uniform cylindrical improved body to enhance and strengthen the ground! It is also compatible with weak ground.

The "High-Pressure Jet Mixing Method" has a wide range of applications and can also be used for soft ground to improve and strengthen the soil. Cement-based solidifiers are injected at high pressure and rotated into the weak ground between the building and the supporting ground, mixing and stirring the soil and solidifier while cutting into the ground. This creates a uniform cylindrical improved body. The improved body also serves as a supporting pile. It can be adjusted to achieve the desired improvement strength suitable for each design condition. Please feel free to contact us. Toll-free number: 0120-873-835

  • Machinery and equipment installation/dismantling/relocation
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Ground Improvement" "GSIS Method" Ground improvement directly beneath the building.

Efficient ground reinforcement with minimal loss! Ideal for land with existing buildings.

The "GSIS Method" is suitable for ground reinforcement in areas where buildings already exist, as it does not involve excavation work and has minimal impact on adjacent structures. Based on meticulous survey results, the method allows for direct injection of agents into weak ground layers, enabling efficient ground reinforcement with minimal loss. [Features] - Ideal for ground improvement beneath existing buildings - No excavation work, resulting in minimal impact on adjacent structures *For more details, please refer to the PDF materials or feel free to contact us. Toll-free number: 0120-873-835

  • Other contract services
  • Machinery and equipment installation/dismantling/relocation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tilt correction: "JOG method" building tilt correction

No need for excavation work on the periphery, resulting in a short construction period! It is possible to construct even large buildings exceeding 10 stories.

The "JOG Method" does not require excavation work on the outer perimeter, resulting in a shorter construction period, and it is a method that does not apply localized forces to the structure. By injecting grout material under the foundation while controlling it with a computer, we can correct any tilting. The formulation of a two-component grout material injected through a double pipe allows us to set the curing time according to the ground and construction environment. We construct improved ground to ensure ground reaction force, and further correct tilting by pressing in quick-setting grout. 【Features】 ■ No excavation work on the outer perimeter is necessary ■ No localized forces act on the structure ■ Applicable for large buildings exceeding 10 stories *For more details, please refer to the PDF document or feel free to contact us. Toll-free number: 0120-873-835

  • Other contract services
  • Machinery and equipment installation/dismantling/relocation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tilt correction: "Underpinning method" for correcting building tilt.

By performing a jack-up at the top of the steel pipe piles, the tilt of the building is corrected!

"Underpinning Method" This method involves extending steel pipes beneath the foundation of a structure while using the building's own weight as a reaction force. The steel pipe piles are driven into the ground, and by performing a jack-up at the top of the steel pipe piles, the tilt of the building is corrected. Since the steel pipe piles are driven down to the supporting ground and act as support piles, there is no risk of the building settling again. This method is suitable for small to medium-sized structures. 【Features】 ■ Can be implemented even for heavy structures ■ Selection of steel pipe diameter based on load ■ Flexible arrangement of steel pipes *For more details, please refer to the PDF document or feel free to contact us. Toll-free number: 0120-873-835

  • Other contract services
  • Machinery and equipment installation/dismantling/relocation
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tilt correction: "Side Pinning Method" for correcting building tilt.

Rotary driven piles are installed to the supporting ground without relying on the building's own weight! Installation is possible even during ongoing settlement.

"Side Piling Method (Helical Pile Method)" Using a dedicated machine, a helical pile with a connecting spiral plate is rotated and pressed into the supporting ground, increasing the load-bearing capacity of the building and preventing settlement. A hydraulic jack is attached to the bracket section to correct any tilt. The tilt correction can be repeated. This method is suitable for small-scale structures. 【Features】 ■ Can be constructed even during ongoing settlement ■ Can be constructed in narrow spaces (at least 50 cm distance from neighboring properties) ■ Ideal for correcting external structures *For more details, please refer to the PDF materials or feel free to contact us. Toll-free number: 0120-873-835

  • Other contract services
  • Machinery and equipment installation/dismantling/relocation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Building 'Tilt Correction' and 'Ground Improvement' directly beneath the building *Comprehensive catalog available now*

The ground directly beneath existing buildings can also be improved! Appropriate methods are selected based on the building structure and ground conditions. Sometimes, two methods are combined to meet diverse needs!

■Selecting and implementing the optimal construction method with reliable technology and extensive experience■ With our extensive knowledge of ground and construction based on rich experience, we interpret the necessary information from surveys to clarify the causes of subsidence. We select appropriate construction methods while considering the situation and carry out the implementation. Sometimes, we adopt hybrid methods that combine different techniques to meet diverse needs. We can propose appropriate modification and reinforcement work for a wide range of structures and ground conditions, including factories, warehouses, stores, and public facilities. We correct the tilt of existing buildings and construct a solid foundation directly beneath them to prevent further subsidence. ★You can view our 'Comprehensive Catalog' introducing the construction methods we handle by downloading the PDF. 【Listed Construction Methods】 ■High-pressure injection mixing method ■Underpinning method ■Side pinning method (helical pier method) ■GSIS method ■JOG method ■TerraTech method Please feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Void Filling and Embankment Method: 'TerraFill Method' allows for the selection of permeable or impermeable options.

Lightweight filling and embankment method "Terrafill" designed for weak ground areas.

When cavities occur under the floors of factories and warehouses... the vibrations and noise from the installed machinery worsen, the floor shakes every time a fork (reach) lift passes, cracks and unevenness appear on the floor, causing employees to trip, which greatly reduces work efficiency. Additionally, in the event of natural disasters such as earthquakes, the floor may collapse. 【What is the Terafil Method?】 The Terafil method is the lightest cement-based filling and embankment method available, offering a choice between permeable type "Terafil OC" and impermeable type "Terafil CC." In areas with weak ground where ground subsidence occurs, the weight of the cavity filling material or embankment material can further burden the weak ground and promote subsidence. Developed for filling and embankment in soft ground areas, Terafil possesses about ten times the strength compared to filling and embankment materials made primarily of soil, while minimizing the load during construction. The permeable type "Terafil OC" is suitable for filling and embankment materials in areas with high groundwater levels due to its low buoyancy characteristics. ▼ Features of Terafil ▼ - Lightweight and strong - Excellent permeability - Consistently high quality - Compact preform method - Compatible with subsidence correction through combined methods Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

365-day monitoring of building structure integrity - log365 monitoring

"Is this building safe with just a visual inspection?" Supporting building safety management and BCP measures.

■ log365 Building Structure Monitoring It measures subtle vibrations using highly sensitive accelerometers installed in buildings to monitor the building's structure (earthquake resistance performance). The data is sent to a cloud server and automatically analyzed. When structural changes in the building exceed a certain threshold, a report is promptly sent to the building manager. During an earthquake, it provides real-time updates on the seismic intensity at the building's location and the damage status of the building. This allows for efficient prioritization of evacuation instructions, safety checks of the building, and on-site assessments even amidst confusion. *For more details, please refer to the PDF document or feel free to contact us. Toll-free number: 0120-873-835

  • Contract measurement
  • Structural Analysis

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Service "Structural Simulation"

By applying specific seismic motions to a 3D model of a building, it is possible to predict the destruction or damage of the building.

Services for building owners, management companies, and clients Introducing "Structural Simulation." We create a 3D model of the building based on the blueprints, recreating the building as it was at the time of design or construction. By applying specific seismic motions to the recreated building, we can predict how the building will fail and the extent of potential damage. We address challenges such as "I want to know the true necessity of repairs and reinforcements" and "I want to protect and enhance the value of the building." [Insights from the analysis] ■ Understand the differences between the design or construction period and the present (in terms of seismic performance and degree of deterioration) ■ Determine whether past earthquakes have caused any damage or loss to the building's seismic resistance and the extent of such damage ■ Assess the potential damage or loss that future earthquakes may cause to the building ■ Preemptively understand the effects of repairs and reinforcements under various assumptions *For more details, please refer to the PDF document or feel free to contact us. Toll-free number: 0120-873-835

  • Contract measurement
  • Structural Analysis

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"MPD Pipe," a drainage pipe with excellent water collection performance, strength, and maintenance characteristics.

For groundwater drainage measures against liquefaction and drainage of artificial ground such as embankment construction sites.

The "MPD Pipe" is a drainage pipe (drain pipe) with a three-dimensional mesh structure formed from fibrous polypropylene in a porous state. It is used in groundwater lowering methods through propulsion techniques and serves as a drainage pipe for artificial ground such as liquefaction countermeasures and embankment construction, as well as for preventing sliding collapses. Please feel free to contact us. Toll-free number: 0120-873-835

  • Wastewater/wastewater treatment equipment
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Currently Offering Free Samples] Case Studies of Floor Leveling Repair Work

We will correct the floor tilt and subsidence without stopping operations! Introducing examples of the "Terra Tech Method" for correcting subsided concrete floors!

Our company conducts the "TerraTech Method," a sinking correction technique that adjusts floor tilts, subsidence, steps, and voids in buildings such as factories, warehouses, stores, and schools, where it is difficult to halt operations, without breaking the existing floor. The "TerraTech Method" involves injecting a special urethane resin under the concrete slab floor, which levels the floor using its expansion force. Compared to traditional concrete replacement methods, the construction period is about 1/10 of the time, and there is no need to remove goods, machinery, or install large plants. We are offering free materials that introduce examples of sinking correction work carried out using the "TerraTech Method." The materials include detailed information about the situation before construction and the reasons for inquiries. Please feel free to download and review them. [Overview of Materials] ■ Case Study: Funabori Co., Ltd. (Manufacturing Factory) ■ Case Study Collection Vol. 1: Various case studies are introduced ■ Customer Feedback Vol. 1-4: Feedback from customers who have actually undergone construction *For more details, please refer to the PDF materials or feel free to contact us. Toll-Free Number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Customer Feedback Vol. 1: Warehouse "Teratec Method"

Introducing a discussion with Chuo Packing Transport, who performed subsidence correction of a warehouse using the TerraTech method.

In February 2017, we spoke with Mr. Yoshinori Shitaira, Executive Director of Chuo Packing Transport Co., Ltd., about the floor sinking correction work carried out in their warehouse using the "TerraTech Method." Chuo Packing Transport Co., Ltd., headquartered in Suginami Ward, Tokyo, is a transportation, warehousing, and recycling company. Founded in 1969, it has contributed to the development of the Japanese economy through office relocations for corporations, seasonal product storage/management, document storage services, PC kitting services, and logistics. This document includes information on the situation before construction, reasons for choosing our company, and details about the work performed. [Contents] ■ Situation before construction and the trigger for the inquiry ■ Reasons for choosing the TerraTech Method ■ Reasons for choosing our company ■ Impressions after construction *You can download materials containing customer feedback. *For more details, please feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Customer Feedback Vol. 2 Manufacturing Factory "TerraTech Method"

Introducing a discussion with Akebono Industries, who conducted a floor deflection reduction project using the Teratec method.

In July 2016, we spoke with Mr. Tatsuya Abe, the President, and Mr. Kiyotaka Abe, the Executive Vice President of Akebono Sangyo Co., Ltd., who conducted a floor deflection reduction project at their factory using our "Teratech Method." The company is headquartered in Minamisenju, Arakawa Ward, Tokyo, and has its first and second factories in Noda City, Chiba Prefecture. They primarily manufacture rubber mats and carpets for automobiles and are expanding their business into the production of industrial materials. This document includes information on the situation before construction, the issues faced, and the reasons for choosing our company. [Contents] - Situation before construction and the trigger for the inquiry - Reasons for choosing our company - Issues caused by floor deflection - Information about our construction work *You can download materials that include customer feedback. *For more details, please feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Customer Feedback Vol. 3 Refrigerated Warehouse "Teratec Method"

Introducing a conversation with Ichiyou regarding the floor sinking correction work using the Teratec method.

In September 2017, we spoke with Mr. Toshio Baba, Vice President of Oriichi Co., Ltd., who conducted floor sinking correction work for a refrigerated and frozen warehouse using the "Terra Tech Method." The company was founded in 1953 in Imaichi City, Tochigi Prefecture, with the aim of manufacturing and selling wooden folding boxes and paper containers. Since then, it has expanded its business to include cardboard manufacturing, corrugated production, a weight bag system division, a packaging division, a packaging materials and equipment division, and the refrigerated warehouse and frozen transportation division that we worked on this time. This document includes information about the situation before construction, the reasons for choosing our company, and details about the construction work. [Contents] ■ Situation before construction and the trigger for the inquiry ■ Reasons for choosing our company ■ I was surprised by the beauty of the finish ■ Space efficiency is important for refrigerated warehouses ■ Details about our construction work * You can download materials that include customer feedback. * For more details, please feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Customer Feedback Vol. 4: Rental Space "Teratec Method"

Introducing a conversation with the manager who conducted a floor deflection reduction project using the Teratec method.

In August 2018, we spoke with a customer who had construction work done to reduce the deflection of the concrete floor in their rental space using our "Teratech Method." The first floor of a building constructed in 1961 is operated as a rental space, and the customer requested the floor modification because they wanted to preserve the charm of the old building. This document includes information about the reasons for the request and the performance of the construction staff. [Contents] ■ The reason for contacting our company ■ Information about the historically significant building completed in 1961, located near Shibuya Station ■ Performance of the staff * You can download a document containing customer feedback. * For more details, please feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Teratec Construction Report: Factory

Solving your factory problems! Introducing "TerraTech" case studies for subsidence correction and void filling.

We would like to introduce a case where problems caused by subsidence and voids in a factory were resolved by Teratech. [Problem] In a steel processing factory located in Ibaraki Prefecture, the concrete floor sank by about 3.4 cm. Although the factory had not been in operation for long, subsidence occurred, causing issues with the laser processing machine purchased for steel processing, which could no longer operate according to the specifications. For precision machines like laser processing machines, having a level floor is crucial for normal operation. [Reasons for Choosing Teratech] - Work can be carried out without stopping operations. - The work can be completed in a short time. [Feedback After Construction] "We were planning to readjust the level of the laser processing machine after this construction, but the floor correction was done so well beyond our expectations that the processing machine is now operating normally. We were very relieved that the planned budget of 1 million yen for the laser level adjustment was no longer necessary," we received words of gratitude. In addition, we also introduce resolution cases from packaging material manufacturing factories. *For more details, please refer to the external link page or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[TeraTech Construction Report] Warehouse

Solve your warehouse problems! Introducing "TerraTech" case studies for settlement correction and void filling.

We would like to introduce a case where we solved problems related to subsidence and voids in a warehouse using the Teratec method. 【Problem】 We received a consultation from a manufacturer in Ibaraki Prefecture that produces forged parts for automobiles, industrial machinery, and ships. They were experiencing issues with the floor of their mold warehouse sinking, which made it difficult for the movable racks to operate smoothly. Upon measuring the floor where the rails for the movable racks were installed, we found unevenness ranging from +4mm to -27mm. 【Reasons for Choosing Teratec】 - No need to break the floor - Can be constructed while heavy molds are still on the movable racks 【Feedback After Construction】 The unevenness was corrected through the construction, significantly improving work efficiency. *For more details, please refer to the external link page or feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Teratec Construction Report: Store

Solving your store's problems! Introducing "TerraTech" case studies for settlement correction and void filling.

We would like to introduce a case where we solved problems caused by subsidence and voids at a store using the Teratech method. [Problem] A void was found under the concrete floor of a supermarket in Saitama Prefecture, just one month before its opening. It was also discovered that there was a 34mm height difference at the joints of the concrete floor. [Reason for Choosing Teratech] Due to the limited time before the opening, we were requested to address the issue using our polyurethane injection method. [Feedback After Construction] We performed void filling under the floor and correction of the floor height difference using the Teratech method. The adjustments were made to the millimeter level, resolving the height difference at the floor joints. Additionally, we also have examples of height difference correction work related to the renovation of a large supermarket in the Hokuriku region. [Case Overview] ■ Supermarket - Work performed: Void filling under the floor and height difference correction - Date of work: October 2016 - Location: Saitama Prefecture - Work area: 97m² - Height difference correction: 34mm *For more details, please refer to the external link page or feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Teratec Construction Report: School

Solving problems at school! Introducing "TerraTech" construction examples for settlement correction and void filling.

We would like to introduce a case where we solved problems caused by subsidence and voids at a school using the Teratec method. 【Problem】 We received a consultation from a junior high school in Yamagata Prefecture stating, "The classroom floor is sagging, and the desks are wobbling." Upon investigation, it was confirmed that voids were present under the floors in six classrooms due to long-term ground subsidence. 【Reason for Choosing Teratec】 It was believed that the methods to address ground subsidence of concrete floors were either to redo the flooring or to apply a topping and adjust the level. However, considering the time required for moving, demolition work, and the curing period after concrete pouring, it was determined that the construction would take more than a month, making it difficult to complete during the summer vacation. Therefore, the Teratec method was adopted. 【Feedback After Construction】 By utilizing the summer vacation period to implement this method, we were able to completely eliminate the wobbling of desks and chairs. *For more details, please visit the external link page or feel free to contact us. https://teretek.jp/plus/case/school Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Teratec Construction Report: Gymnasium

Solving your problems at the gym! Introducing "TerraTech" case studies for settlement correction and void filling.

We would like to introduce a case where we solved issues related to subsidence and voids in a gymnasium using the Teratec method. 【Issue】 We received a consultation from a public elementary school in Ise City, Mie Prefecture, stating that "the gymnasium floor is sinking." 【Reasons for Choosing Teratec】 - Short construction period and low cost - Minimal waste as the floor does not need to be destroyed 【Feedback After Construction】 During the summer vacation, we carried out large-scale subsidence correction work and successfully leveled the entire gymnasium. ■ For more details, please visit https://teretek.jp/plus/case/gym *For more information, please refer to the external link or feel free to contact us. Toll-free number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Report: Hospital

Solving your concerns at the hospital! Introducing case studies of "Mainmark" for subsidence correction and void filling.

We would like to introduce a case that solved issues related to subsidence and cavities in a hospital. [Issues] A certain neurology clinic located in Sendai City was leaning, but as it is a comprehensive clinic equipped with both outpatient services and inpatient facilities, it operated almost 24 hours a day, 365 days a year. We received a request to carry out the construction without affecting the hospital's operations. [Feedback after Construction] Although it was a large-scale project, we successfully resolved the floor sagging and building subsidence in just two days of construction. The clinic resumed normal operations after the holiday, and the client was very satisfied. [Case Overview] ■ Comprehensive Clinic - Construction Details: Floor sagging and subsidence correction work - Construction Date: November 2013 - Location: Miyagi Prefecture - Construction Area: 900m² Other cases are also introduced on the following page: https://teretek.jp/plus/case/hospital *For more details, please refer to the external link page or feel free to contact us. Toll-Free Number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Teratec Construction Report: Nursing Care Facility

Ensuring the safety of event halls where elderly people gather! Introducing examples of floor sinking correction work.

We would like to introduce a case where the issues of subsidence and voids at a nursing care facility were resolved using the Teratec method. 【Issues】 At a nursing care facility in Aomori Prefecture, built 14 years ago, the floor of the event hall where elderly individuals gather had sagged significantly, causing the doors to not close properly. 【Reason for Choosing Teratec】 The work can be completed in one day, minimizing the burden on the residents. 【Feedback After Construction】 The construction was completed in one day, and except for areas where the flooring had developed a warp due to long-term subsidence, we were able to raise the height to ±0. 【Case Overview】 ■ Nursing Care Facility - Construction Details: Floor subsidence correction work - Construction Date: October 2014 - Location: Aomori Prefecture - Construction Area: Total 65m² - Step Correction: 30mm *For more details, please refer to the external link page or feel free to contact us. Toll-Free Number: 0120-873-835

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Teratec Construction Report: Concrete Paved Road

Solving issues with concrete paved roads! Introducing examples of void filling and unevenness correction.

We would like to introduce a case where the issues of subsidence and voids in concrete paved roads were resolved using the Teratec method. The "Teratec method" is a technique that allows for the filling of "voids" beneath concrete paved roads caused by ground subsidence and groundwater, enabling the quick correction of dangerous "differentials and bumps" in the road surface. [Issues] In the concrete paved road within a tunnel on a national highway in Shizuoka, differentials and bumps were occurring. [Reason for Choosing Teratec] Due to the short duration of the national highway maintenance and repair work, conventional methods were not feasible, so we were looking for a method that could be implemented in a short time. The Teratec method was adopted because it allows for the correction of differentials in a short construction time. [Feedback After Construction] We were able to complete the work over an area of 115m2 in 2 days (from 9 PM to 6 AM the following morning). [Case Summary] ■ Concrete paved road within a national highway tunnel - Location: Shizuoka Prefecture - Construction area: 115m2 - Construction period: 2 days (from 9 PM to 6 AM the following morning) *For more details, please refer to the external link page or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 12 Next
  • 大型品の切削や低コストな複合加工に。ロボットシステムの資料進呈

    大型品の切削や低コストな複合加工に。ロボットシステムの資料進呈

  • 3Dデータ活用WEBセミナー iCAD Technical Fair 10th 人手不足を解消! 設計製造DXの取組 最新3D活用を徹底解説 設計リードタイム1/2!生産性の向上 60日間で実現した2D→3D設計移行 1つのデータを全部門で使い倒す!
  • 抗体薬物複合体(ADC)医薬品開発 コンテンツ集のダウンロード ADC医薬品開発におけるMIDD活用事例を一挙公開
    • Contact this company

      Contact Us Online
    • Before making an inquiry

      Download PDF

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.