iPROS Manufacturing
  • Search for products by classification category

    • Electronic Components and Modules
      Electronic Components and Modules
      56058items
    • Machinery Parts
      Machinery Parts
      70951items
    • Manufacturing and processing machinery
      Manufacturing and processing machinery
      95586items
    • Scientific and Physics Equipment
      Scientific and Physics Equipment
      33078items
    • Materials
      Materials
      34937items
    • Measurement and Analysis
      Measurement and Analysis
      52813items
    • Image Processing
      Image Processing
      14579items
    • Control and Electrical Equipment
      Control and Electrical Equipment
      50370items
    • Tools, consumables, and supplies
      Tools, consumables, and supplies
      62940items
    • Design and production support
      Design and production support
      11730items
    • IT/Network
      IT/Network
      40511items
    • Office
      Office
      13186items
    • Business support services
      Business support services
      32019items
    • Seminars and Skill Development
      Seminars and Skill Development
      5707items
    • Pharmaceutical and food related
      Pharmaceutical and food related
      23652items
    • others
      59641items
  • Search for companies by industry

    • Manufacturing and processing contract
      7354
    • others
      5041
    • Industrial Machinery
      4430
    • Machine elements and parts
      3292
    • Other manufacturing
      2872
    • IT/Telecommunications
      2520
    • Trading company/Wholesale
      2454
    • Industrial Electrical Equipment
      2316
    • Building materials, supplies and fixtures
      1818
    • software
      1648
    • Electronic Components and Semiconductors
      1576
    • Resin/Plastic
      1493
    • Service Industry
      1409
    • Testing, Analysis and Measurement
      1131
    • Ferrous/Non-ferrous metals
      980
    • environment
      702
    • Chemical
      630
    • Automobiles and Transportation Equipment
      558
    • Printing Industry
      506
    • Information and Communications
      434
    • Consumer Electronics
      422
    • Energy
      321
    • Rubber products
      311
    • Food Machinery
      303
    • Optical Instruments
      282
    • robot
      275
    • fiber
      250
    • Paper and pulp
      232
    • Electricity, Gas and Water Industry
      172
    • Pharmaceuticals and Biotechnology
      166
    • Warehousing and transport related industries
      145
    • Glass and clay products
      142
    • Food and Beverage
      134
    • CAD/CAM
      122
    • retail
      110
    • Educational and Research Institutions
      107
    • Medical Devices
      101
    • Ceramics
      96
    • wood
      87
    • Transportation
      83
    • Petroleum and coal products
      61
    • Medical and Welfare
      61
    • Shipbuilding and heavy machinery
      52
    • Aviation & Aerospace
      47
    • Fisheries, Agriculture and Forestry
      39
    • self-employed
      23
    • Public interest/special/independent administrative agency
      22
    • equipment
      20
    • Mining
      17
    • Research and development equipment and devices
      17
    • Materials
      16
    • Government
      15
    • Finance, securities and insurance
      13
    • Individual
      10
    • Restaurants and accommodations
      8
    • cosmetics
      8
    • Police, Fire Department, Self-Defense Forces
      7
    • Laboratory Equipment and Consumables
      3
    • Contracted research
      3
    • Raw materials for reagents and chemicals
      2
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Electronic Components and Modules
  • Machinery Parts
  • Manufacturing and processing machinery
  • Scientific and Physics Equipment
  • Materials
  • Measurement and Analysis
  • Image Processing
  • Control and Electrical Equipment
  • Tools, consumables, and supplies
  • Design and production support
  • IT/Network
  • Office
  • Business support services
  • Seminars and Skill Development
  • Pharmaceutical and food related
  • others
Search for Companies
  • Search for companies by industry

  • Manufacturing and processing contract
  • others
  • Industrial Machinery
  • Machine elements and parts
  • Other manufacturing
  • IT/Telecommunications
  • Trading company/Wholesale
  • Industrial Electrical Equipment
  • Building materials, supplies and fixtures
  • software
  • Electronic Components and Semiconductors
  • Resin/Plastic
  • Service Industry
  • Testing, Analysis and Measurement
  • Ferrous/Non-ferrous metals
  • environment
  • Chemical
  • Automobiles and Transportation Equipment
  • Printing Industry
  • Information and Communications
  • Consumer Electronics
  • Energy
  • Rubber products
  • Food Machinery
  • Optical Instruments
  • robot
  • fiber
  • Paper and pulp
  • Electricity, Gas and Water Industry
  • Pharmaceuticals and Biotechnology
  • Warehousing and transport related industries
  • Glass and clay products
  • Food and Beverage
  • CAD/CAM
  • retail
  • Educational and Research Institutions
  • Medical Devices
  • Ceramics
  • wood
  • Transportation
  • Petroleum and coal products
  • Medical and Welfare
  • Shipbuilding and heavy machinery
  • Aviation & Aerospace
  • Fisheries, Agriculture and Forestry
  • self-employed
  • Public interest/special/independent administrative agency
  • equipment
  • Mining
  • Research and development equipment and devices
  • Materials
  • Government
  • Finance, securities and insurance
  • Individual
  • Restaurants and accommodations
  • cosmetics
  • Police, Fire Department, Self-Defense Forces
  • Laboratory Equipment and Consumables
  • Contracted research
  • Raw materials for reagents and chemicals
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Trading company/Wholesale
  3. 酒重
  4. Product/Service List
Trading company/Wholesale
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

酒重

capital1000Ten thousand
number of employees40
addressMie/Yokkaichi-shi/1-71 Shiomahama Town
phone059-345-4343
  • Official site
last updated:Feb 15, 2024
酒重logo
  • Contact this company

    Contact Us Online
  • Before making an inquiry

    Download PDF
  • Company information
  • Products/Services(84)
  • catalog(8)
  • news(0)

酒重 List of Products and Services

  • category

1~45 item / All 84 items

Displayed results

class="retina-image"

Infrared survey using drones: Diagnosing building leaks and repair areas through aerial photography.

For exterior wall inspections and indoor/outdoor leak investigations! Case study materials are currently being offered! Numerous achievements in mechanical equipment and maintenance work, mainly in Mie Prefecture and Yokkaichi!

Our company has extensive experience in providing machinery and equipment, maintenance construction, and parts processing, primarily in the manufacturing industry and factories centered in Yokkaichi, Mie Prefecture. We also conduct "infrared surveys" using infrared thermal imaging cameras (including handheld and drone-mounted types) to visually confirm issues such as floating and water leaks. In leak investigations, we accurately identify damage locations using infrared cameras and determine the cause of leaks through various methods, including endoscopy and water spray tests. Additionally, we offer "drone surveys" utilizing various drones. Please feel free to contact us when you need our services. 【Benefits】 ■ Surveys can be conducted in a short period ■ Investigations can be performed at a lower cost compared to temporary probing ■ No noise from probing sounds due to temperature data analysis ■ Non-contact, so finishing materials are not damaged ■ Leak investigations are also possible *For more details, please download the PDF or feel free to contact us.

  • Contract Inspection

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Infrared survey using drones" Diagnosing building leaks and repair areas through aerial photography.

For exterior wall inspections and indoor/outdoor leak investigations! Case study materials are being offered! Numerous achievements in mechanical equipment and maintenance work, mainly in Mie Prefecture and Yokkaichi!

Our company has a wealth of experience in providing machinery, equipment, maintenance construction, and parts processing primarily in the manufacturing industry and factories centered in Yokkaichi, Mie Prefecture. Additionally, we conduct "infrared surveys" using infrared thermal imaging cameras (including handheld and drone-mounted types) to visually confirm issues such as floating and water leaks. In leak investigations, we accurately identify damaged areas with infrared cameras and determine the cause of leaks using various methods, including endoscopy and water spraying tests. We also offer "drone surveys" utilizing various types of drones. Please feel free to contact us when you need our services. 【Benefits】 ■ Surveys can be conducted in a short period ■ Investigations can be performed at a lower cost compared to temporary probing ■ No noise from probing sounds due to temperature data analysis ■ Non-contact, so finishing materials are not damaged ■ Leak investigations are also possible *For more details, please download the PDF or feel free to contact us.

  • Contract Inspection

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

7 Points to Check When Selecting a Pump

For those struggling with pump updates! An explanation of the types and principles of pumps.

This document explains seven points to check when selecting a pump. It provides detailed explanations on the characteristics and specifications of pumps, how to read performance curves, and the materials used in pumps. It is a useful reference, so please take a moment to read it. [Contents (excerpt)] ■ Types of pumps ■ Principles of pumps ■ Confirmation of pump characteristics and specifications ■ Types and properties of fluids ■ How to read performance curves *For more details, please refer to the PDF document or feel free to contact us.

  • Other pumps

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Assist suit

Reduce the risk of back pain! We support you in continuing to work in a healthy condition.

The "Assist Suit" is a product that significantly reduces the burden on the worker's lower back, especially during the lifting and transportation of heavy objects. The support system mounted on the lower back distributes the pressure on the back when lifting heavy loads, thereby reducing the risk of back pain. This is important for long-term workplace health management and supports workers in continuing their tasks in a healthy state. 【Features】 ■ Reduces the burden on the worker's lower back ■ Decreases fatigue during work, improving work quality ■ Suppresses the occurrence of work-related injuries *For more details, please refer to the PDF document or feel free to contact us.

  • Other office supplies

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Factory maintenance and maintenance, factory construction for production engineers [Case study collection available]

We present a collection of 10 case studies summarizing the maintenance achievements of machinery and equipment such as conveyors and air conditioning systems! Numerous achievements in machinery and equipment, as well as repair work, centered around Yokkaichi, Mie Prefecture!

Sakeju, which has a wealth of experience in manufacturing and factory-related machinery, equipment, maintenance work, and parts processing centered around Yokkaichi in Mie Prefecture, is currently offering a collection of case studies summarizing 10 examples of maintenance achievements for machinery such as conveyors and air conditioning systems! The collection includes a detailed list of available construction services and production achievements in industries such as food, textiles, and semiconductors. Additionally, Sakeju, with its extensive experience in machinery installation, is also providing "7 Points to Check When Selecting a Pump" for your reference! Please leave your factory construction and repair maintenance needs to us. 【Excerpt from the Construction Factory Case Studies】 ■ Food Factory Conveyor Roof Installation Work ■ Semiconductor Factory Proximity Sensor Addition Work 【Excerpt from the 7 Points to Check When Selecting a Pump】 ■ Types of Pumps ■ Replacement Cycle for Pump Parts *For more details, please refer to the PDF document or feel free to contact us.

  • Other services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Studies of Factory Booth Production for Factory Partitions

We handle everything from planning to design and construction! We will do our utmost to meet the different requests for each site.

In this case study collection, we introduce examples of factory booth production. It includes detailed information on "Features of our factory partition installation work" and "Solutions to factory space challenges." Additionally, we have included case studies on factory booths, partitions, and dividers, so please take a moment to read through them. 【Contents (Excerpt)】 ■ Common challenges in factory partitions ■ Features of our factory partition installation work ■ Business model: Planning, production, maintenance, modification, and removal of partitions ■ Solutions to factory space challenges ■ Modifications and special specifications ■ Examples of use *For more details, please refer to the PDF materials or feel free to contact us.

  • Clean Booth

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Example] Cooling Tower Maintenance Work

We conducted a cleaning operation by professionals, also serving as a visual inspection! Here are examples of maintenance construction work.

We received a request from the customer stating, "As we enter this season, we are concerned about the decrease in performance and energy loss due to dirt. We would like to ask a professional for assistance." We inspected the existing cooling tower and proposed a check for any internal clogging along with cleaning work. The customer had been performing cleaning work themselves, but we conducted a professional cleaning service along with a visual inspection. They expressed, "We are glad that we were able to clean areas that we couldn't manage ourselves." 【Case Overview】 ■ Industry: Manufacturing ■ Subject: Maintenance Work ■ Request Details: Cooling Tower Cleaning ■ Construction Deadline: 1 Day ■ Key Service Areas: Mie Prefecture, Hokusei District, Chusei District ■ *For more details, please refer to the related links or feel free to contact us.

  • Piping Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case of Machinery Equipment Repair] Pump Replacement Work

Comprehensive support from equipment selection to complete construction! Introducing case studies of mechanical equipment repairs for pump replacement projects.

"We are currently using pumps from Kamino Seisakusho and are considering an update, but we are having trouble because the existing pumps are old, there are no specifications left, and the manufacturer has gone out of business, leaving us without information," we received this request. Based on comparative materials, we held meetings with pump replacement contractors, piping construction contractors, and insulation construction contractors to confirm the details of the work. We calculated the costs for each construction work and the total project and submitted the estimate to the customer. We were able to receive the order as our ability to handle everything from equipment selection to the entire construction (pump replacement, piping, insulation) was appreciated. [Case Overview] ■ Industry: Manufacturing ■ Subject: Pump Maintenance ■ Request: Pump Replacement Work ■ Construction Deadline: 1 Day ■ Key Service Areas: Mie Prefecture, Hokusei Region, Chusei Region ■ *For more details, please refer to the related links or feel free to contact us.

  • Other pumps

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Example] Rain Leak Repair Work <Food Industry>

Prompt response from investigation of the cause to construction! Introducing case studies of repair work for rain leaks.

We received a request from a customer stating, "For some time now, rain has been running down the wall and the floor is soaked. Can you handle repairs for the leak?" After checking all possible causes, we identified that several pipe brackets attached to the exterior wall were slightly rusted, creating small gaps that were the source of the problem. We proposed to the customer to replace the seal above the leaking area and apply waterproof treatment to the pipe brackets. We received feedback saying, "I was grateful for the prompt response from investigation to construction." 【Case Overview】 ■ Industry: Food Industry ■ Subject: Leak Repair ■ Request Details: Maintenance Work ■ Construction Duration: 1 Day ■ Key Service Areas: Mie Prefecture, Kitasei District, Chusei District ■ *For more details, please refer to the related links or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Parts Processing Example] Roll Gripping Arm

Measuring while checking the specifications! An example of parts that can only be removed when production is halted.

We would like to introduce a case where we manufactured equipment parts without drawings at our company. We received a request to "update the arm for grabbing existing rolls." During production downtime, we researched the approximate sizes, processing details, and materials, and provided a quotation. We inquired about the intended use, and since the relationship between the bent claws that fit the inner diameter of the roll and the distance from the arm attachment to the claws could be misaligned, potentially causing issues when grabbing the product, we took measurements while confirming the specifications with the customer. [Case Overview] ■ Industry: Film Manufacturing ■ Client: Film Manufacturing Maintenance ■ Request: Manufacturing of equipment parts without drawings ■ Execution Time: Approximately 2 weeks *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Parts Processing Example] Improvement of the Fabric Wringer

Construction in about a week! A case where the processing contractor improved by increasing the number of support posts to three.

We would like to introduce a case where we received a request from a customer to improve a filter press that was previously manufactured at another factory. After contacting the customer and meeting to examine the actual product, we confirmed that because there was only one support pillar in the center, while the liquid was effectively pressed near the center pillar, other areas were not being fully squeezed. Among the three improvement methods proposed, it was decided to increase the number of support pillars to three. After submitting the estimate, we received the order, confirmed a schedule that would not interfere with on-site use, collected the equipment, and had the processing company make the improvements. 【Case Overview】 ■ Industry: Semiconductor ■ Subject: Chemical cloth squeezing ■ Request Details: Product improvement ■ Implementation Duration: About one week *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).

  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Parts Processing Example] Trolley Modification

Simultaneously solving two wishes! A case where we were able to manufacture according to the customer's specifications.

We would like to introduce a case where a handbrake was installed on a wagon cart. We selected the J-type stopper "HST-J100," which is specifically designed for swivel casters and can be installed on the customer's requested inclined wagon with dimensions W750 x D500 x H1300, along with an operation lever, and submitted a quote along with the documentation. We implemented proper safety measures and were able to manufacture the product according to the customer's specifications. Additionally, to accommodate requests for multiple units, we addressed the schedule for future orders and detailed requirements. [Case Overview] ■ Industry: Manufacturing ■ Subject: Wagon cart ■ Request: Handbrake installation ■ Construction period: 10 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Parts Processing Example] Production of a Duplicating Measurement Table

Manufactured according to requests such as wanting a coating! A case where the finish was beautiful and the customer was satisfied.

We received a request from a customer stating, "The duplicate measurement table used in the inspection process is made of wood, but it is deteriorating. Is it possible to make the same thing?" Upon receiving the request, we checked the actual item and the drawings on site. Manufacturing it in aluminum or wood would be expensive and did not match the customer's budget, so we decided to produce it in steel. We discussed the finer details with the customer, and they requested that the handle be made of wood, and since items will be placed on top, they wanted a rubber sheet to be separately produced and attached to prevent slipping, along with a request for painting. We proceeded with the production according to these specifications. [Case Overview] ■ Industry: Automotive parts manufacturing ■ Target: Manufacturing industry ■ Request details: Processed products ■ Construction period: Approximately 2 weeks *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).

  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Parts Processing Example] Engraving Base for Wooden Trim Press

Hearing about the customer's usage environment and operational methods! A case study created with a focus on ease of use.

We would like to introduce a case where we manufactured a wooden stamp holder. We received a rough image from the customer and conducted interviews to understand their usage environment and operational methods. Based on that information, we held discussions with our partner company. We focused on usability, considering the hole diameter for storing the stamps, the pitch of the storage holes, the depth of the storage holes, and even the angle of the holes for insertion, confirming with the customer at each stage of production. Initially, we planned to engrave the stamps in the shape of letters to establish a fixed position, but due to increased costs and limited durability, we proposed using a label maker for positioning, which also helped to reduce costs. 【Case Overview】 ■ Industry: Steel Industry ■ Subject: Stamp Holder ■ Request: Production of a stamp holder ■ Construction Duration: 7 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Nakasei District (surrounding Mie).

  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Parts Processing Example] Test Jig

We propose a matching type jig! An example of creating a model with cardboard to align the image.

We would like to introduce a case where we received a request from a customer for the proposal and production of a testing jig. We reviewed the current testing methods and looked at photos taken during work when visiting other business locations, and we discussed the products to be tested. Considering the need to minimize the gap between the product being tested and the jig for better workability, we proposed a butt-joint type jig. Additionally, we suggested creating a plate to serve as a base to allow for height adjustments. We produced one unit for testing, and since it met the customer's expectations, we were able to receive an additional order for two more units. [Case Summary] ■ Industry: Manufacturing ■ Request Details: Proposal and production request for a testing jig ■ Implementation Duration: Approximately 2 weeks *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Parts Processing Example] Liquid Tank Cart and Storage Rack

The work on-site can now be done safely, and the number of workers has been reduced! A case of modifying a ready-made cart.

We would like to introduce a case where we received a request from a customer to improve a cart so that a cylinder filled with liquid does not fall during its movement to the storage shelf. After discussing with the customer, we proposed adding rollers to the cart and the storage shelf to eliminate the need for two people to lift it. Later, we revisited the site with the processing contractor and suggested installing a frame and safety bar on the cart to prevent it from falling. By adding rollers, it became possible to move the cart to the storage shelf by simply rolling it, allowing one person to perform the task. 【Case Overview】 ■ Industry: Semiconductor ■ Subject: Cart modification ■ Request: Safety measures for transportation ■ Implementation period: Approximately 2 weeks *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Parts Processing Example] Manufacturing of Air Conditioning Duct Y-Pipe

We propose using tinplate material! An example of a design that combines flexibility with a duct hose.

We would like to introduce a case study of air conditioning duct component processing that we conducted. In the field, there were instances where two people were working together, but with the current air conditioning system, only one person was receiving airflow, while the other was completely without airflow. Therefore, we visited the site to first confirm the situation. We proposed a method to create and install a Y-branch duct so that both individuals would receive airflow. Since the dimensions were outside the standard specifications, we took actual measurements of the air conditioning duct. The main duct was 250mm in diameter, and the Y-branch part was 125mm x 2. To prevent the risk of falling due to increased weight, we chose galvanized steel as the material. [Case Overview] ■ Industry: Automotive parts manufacturing ■ Subject: Duct ■ Request: Split the air conditioning duct into two branches ■ Construction duration: Approximately 10 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).

  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study of Parts Processing] PTFE Processed Products

Delivery in about two weeks after receiving the order! An example of a combination welded based on ready-made products.

We would like to introduce a case requested by a customer regarding a funnel used for transferring liquids into containers. Due to its tapered shape, the mouth part tends to be sealed, making it difficult to solve the problem, so we proposed to manufacture a solution. Since machining from the raw material would result in significantly high material and processing costs, we combined existing products and welded them together to keep costs down. The customer has provided feedback saying, "I was able to work comfortably without creating a vacuum, and I would like to continue using it as is." [Case Overview] ■ Industry: Manufacturing ■ Subject: PTFE processed products ■ Request: Custom funnel manufacturing ■ Construction period: Approximately 2 weeks *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Case] Duct Repair Work

A duct has been installed on the chiller for heat dissipation! The direction of the exhaust can now be adjusted.

We would like to introduce a case study of duct repair work that we conducted. We confirmed the installation location of the chiller on-site. We installed ducts to the chiller for heat exhaust and carried out valve installation work. This allows for adjustment of the exhaust direction, enabling seasonal adaptations. We received feedback from the customer stating, "The request was to prevent the summer heat, but you were also able to address the winter cold with the same work." 【Case Overview】 ■ Industry: Automotive Parts ■ Subject: Duct ■ Request: Duct repair work ■ Construction Duration: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Example] Valve Maintenance

Cleaning of the main body casing was performed, and the damaged parts were checked! This is a case where a report submission was also requested.

Here is a case study of regular maintenance for a valve used daily. Immediately after receiving the request, we conducted a verification operation on-site. We performed cleaning of the main casing and checked for any damaged parts. As rust had progressed, we applied anti-rust paint. Additionally, due to wear from aging, we replaced the gland packing and valve bolts, and prepared a report. 【Case Overview】 ■ Industry: Chemical Plant ■ Subject: Valve ■ Request Details: Valve Maintenance ■ Work Duration: 10 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Construction Case] Anchor Fixing Work

Immediately after receiving the request, we conducted a verification operation on-site! A case where the floor load capacity was calculated and constructed.

We would like to introduce a case where anchor fixing work was carried out to prevent the tipping of equipment and machinery within the factory. Immediately after receiving the request, we conducted a site inspection. First, we checked the condition of the space under the floor, as the length of the anchors varies depending on the underfloor conditions. Additionally, since the legs of the anchors can break, we calculated the load-bearing capacity of the floor and proceeded with the installation. 【Case Overview】 ■ Industry: Automotive Parts ■ Subject: Anchors ■ Request Details: Anchor fixing work ■ Construction Duration: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Nakasei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Case] Damper Maintenance Work

Serviced 3 dampers! The assembly, including the replacement, was completed 10 days later and submitted along with the drawings.

We would like to introduce a case where we undertook maintenance work on dampers for a chemical manufacturer. We received three dampers and disassembled them for a condition check. Upon inspection after disassembly, it was determined that the blades and shafts needed to be replaced, so we proceeded with the replacements. The assembly, including the replacements, was completed after 10 days, and we submitted it along with the drawings. We received feedback stating, "We are very grateful for the maintenance done in such a short period of 10 days, and for the submission of the drawings." 【Case Overview】 ■ Industry: Chemical Manufacturer ■ Subject: Dampers ■ Request: Maintenance work on dampers ■ Work Duration: 10 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Example] Blower Maintenance

Clarify dangerous points in advance before the work! Examples of maintenance conducted within a specific period.

We would like to introduce a case where we received a maintenance request for a blower from a chemical manufacturer. To confirm the work on-site, the blower was disassembled. The actual inspection and cleaning were conducted on seven areas: bearings, motor, casing, impeller, shaft, V-belt, and others. We received feedback from the customer stating, "The hazard prediction was thorough, and I felt very secure in making the request." 【Case Overview】 ■ Industry: Chemical Manufacturer ■ Subject: Blower ■ Request Details: Maintenance of the blower ■ Work Duration: 2 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei region, Chusei region (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Example] Cyclone Root Clogging

Raw material powder has adhered due to moisture! Here is an example of a case where we visited the site the same day to investigate and respond.

We received a message from a beverage manufacturer stating that "the cyclone for raw material storage and supply has become clogged" and that they would like to remove the blockage as soon as possible. As it was an urgent matter, we visited the site the same day to investigate and address the issue. We emptied the cyclone and the associated piping to investigate the cause of the blockage. It was inferred that the raw material powder had adhered due to humidity because the line had not been operational for a certain period, which caused difficulties in proper discharge. In this response, we were able to confirm normal operation by removing the adhered raw material, and we also confirmed that there were no significant issues with the cyclone itself, completing the task. 【Case Summary】 ■ Industry: Beverage Manufacturer ■ Subject: Cyclone ■ Request: Cyclone Clogging ■ Work Duration: 1 Day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Construction Case] Chain Block Installation Work

Installation of a chain block near the ceiling inside the building! A case where the manufacturer and model were also selected.

There is a process for transporting gas cylinders in the building for waste disposal, and we received a request to consult about the installation of a chain block there. To install the chain block near the ceiling inside the building, high-altitude work is required. Considering the construction period, using a crane for the work would be the smoothest option, but based on the layout of the factory and the space for delivery, we decided to set up a rolling tower this time. We safely set up the Kito chain block and trolley purchased by Sakashige. This made it possible to carry out the gas cylinder transportation work smoothly. [Case Overview] ■ Industry: Waste disposal facility ■ Request: Chain block installation work ■ Work details: Half a day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Example] Filter Regular Maintenance

Cleaning the filter clogging! A case where it was possible to return to a dust collector with suction power.

We received a request from a customer stating, "The dust collector's filter gets clogged with dirt and dust, so I would like to request regular maintenance." First, we conducted a flow processing at the site and cleaned the dust collector's filter to remove the clogging. The filter itself is in good condition, and by removing the accumulated dust and adhering dirt, it is possible to restore the suction power. By resolving the filter clogging, we were able to return the dust collector to one that has suction power again. The dust collector varies depending on the installation environment and the objects being collected, but regular cleaning of the filter contributes to environmental conservation at the site. For maintenance of the dust collector's filter, please feel free to consult with Sakashige. 【Case Overview】 ■ Industry: Waste treatment facility ■ Request Details: Filter regular maintenance ■ Work Details: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei region, Chusei region (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Example] Safety Measures - Mixer Sheet Cover

Preventing operators from easily intervening! A case study of manufacturing from pipe frames to sheets.

To enhance the safety of the mixer and prevent operators from accidentally putting their hands inside, we would like to introduce a case where the entire mixer was covered with a vinyl sheet. To cover the entire mixer, we first used pipes around the mixer to allow the sheet to be draped over it. This way, even when the mixer is in operation, the vinyl draped over the steel pipes prevents operators from easily inserting their hands. Additionally, by placing the cover from a height above the mixer, we have filled the gaps that previously existed at the top. [Case Summary] ■ Industry: Electrical equipment manufacturer ■ Subject: Mixer ■ Request: Safety measures ■ Implementation: 1 week *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Construction Case] Safety Measures: Pigeon Invasion Prevention Work

Check the location where the pigeons are perching in advance! An example of bird damage control focused on areas with significant damage.

We received a request from a customer stating, "The bird damage in the factory has become serious, so we would like you to implement bird control measures." We confirmed in advance the locations where pigeons were perching and implemented deterrent measures by placing repellent agents primarily in areas favored by the birds. Even if we address some areas, pigeons are intelligent and can avoid treated spots, so we physically prevented their entry by covering other locations with spike strips and glass wool. The customer has expressed, "Since the professionals took care of it, the bird damage has decreased." [Case Overview] ■ Industry: Equipment Parts Manufacturer ■ Target: Factory Roof ■ Request Details: Safety Measures ■ Implementation Duration: 1 Week *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Construction Case] Measures Against Viral Infections

Everything was completed the day after the request! Dust and odors were reduced, and the workplace environment improved.

We would like to introduce a case where measures against viral infections were implemented throughout the factory. In the past, there were instances of infections occurring within the factory, leading to several close contacts being identified. We received inquiries about wanting to implement measures immediately. As a solution for air purification, we proposed the installation of the NACK Air System air conditioner filter "NEOZONE." Since there was an urgent need for action, we ordered the products and carried out the installation ourselves. The installation itself took about 5 minutes per unit, and there were approximately 100 air conditioners in total. We divided the work and completed it in half a day, finishing all installations by the day after we received the request. 【Case Overview】 ■ Industry: Manufacturing ■ Target: Air conditioners throughout the factory, primarily in the office ■ Request Details: Installation of air conditioner filters (100 units total) ■ Installation Duration: Half a day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitase District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Case] Tree Cutting Operations within Factory Grounds

Felling trees to prevent them from falling onto the neighboring company! We will also carry out land leveling with the fallen trees to allow for new trees to grow on the property in the future.

We received a request stating, "The underbrush on the property is likely to come into contact with the power lines of the railway running next door, so we would like you to address this somehow." We conducted an immediate on-site investigation of three logging areas and discussed the logging methods with the lumberjack. On the day of the operation, we notified the railway company about the logging work and proceeded while confirming the operation status. Additionally, we logged the trees to prevent them from falling onto the neighboring company's side, and we also leveled the area with the fallen trees to allow for future growth of trees on the property. 【Case Overview】 ■ Industry: Steel processing manufacturer ■ Subject: Underbrush ■ Request Details: Logging work for the underbrush around the property ■ Execution Details: 5 days (2 weeks after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Example] Factory Roof Leak Repair Work

Measures for deteriorating caulking! A case study proposing a method to reduce costs through sheet metal processing work.

We received a request from a customer stating, "Recently, there has been a leak in the factory, and when it rains, the floor gets flooded. We can't figure it out ourselves, so we would like to ask for an investigation into the cause and repairs for the leak." We promptly visited the site and began our investigation in the attic. By tracing the water stains, we discovered that the leak was coming from the ventilation fan area. We focused our investigation on that area and identified that the deterioration of the caulking on the roof side was the cause. After the repairs, the customer mentioned, "It has rained continuously since the work was done, but there has been no leakage at all. Thanks to your prompt response, we managed to minimize the damage from the leak." [Case Overview] ■ Industry: Parts Manufacturing ■ Subject: Factory Roof ■ Request: Roof Leak Repair ■ Work Details: Half a day (3 days after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Construction Example] Blind Installation Work

Implementing construction while thoroughly managing safety during ladder work and other tasks! A case study from a residential materials manufacturing company.

We received a request from a customer asking, "Could you please install blinds on the windows of the office and meeting room for the new building setup?" At the time of the request, we proposed products based on a sample book of the blinds. After selecting the desired blinds and surveying the installation site, we conducted a detailed confirmation of the installation position and method, and aligned the image of the completed installation. During the on-site work, with the new building setup and other contractors working in the same building, we carried out the installation while thoroughly managing safety, including ladder work. [Case Overview] ■ Industry: Residential materials manufacturing ■ Target: Windows and sashes ■ Request: Blind installation ■ Work details: 1 day (1 week after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Example] Changing the Flooring in the Changing Room

Thoroughly sectioned and safety measures implemented! A case where the client was satisfied with the beautiful finish.

We would like to introduce a case where we received a request from a customer stating, "The floor in the changing room of the large public bath on the premises has deteriorated over time and is becoming corroded and rough. At this rate, we don't know when the floor might collapse, so we would like to have it repaired urgently." As soon as we received the request, we visited the site with our partner company to assess the situation. Although the working hours were limited to 9:30 AM to 3:30 PM, the on-site work was completed in three days. Additionally, during the construction, it was discovered that areas other than the targeted location were also corroded, so we obtained the customer's consent and carried out similar measures for repairs. [Case Overview] ■ Industry: Steel manufacturing ■ Target: Floor replacement ■ Request Details: Replacement of the floor in the changing room of the large public bath ■ Construction Details: 3 days (one week after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Example] Interior Renovation Work

A case where we provided layout drawings and confirmed them in detail with the customer, successfully completing the construction on schedule.

We would like to introduce a case where we received a request from a customer stating, "Since the contracted process will be used, we want it to be used comfortably, and we would like to improve the atmosphere in the office by making the break room more beautiful, so we would like to redo the interior design." After hearing about the budget and image, we conducted meetings based on the proposal to discuss the arrangement of furniture and other details. We held thorough discussions multiple times to determine the colors of the walls and ceilings and the arrangement of furniture to ensure there was no discrepancy in the image, and we received the order. We were able to complete the construction on schedule, and we received feedback saying, "The finish of the interior was just as we had envisioned, thanks to the numerous meetings we had." 【Case Overview】 ■ Industry: Manufacturing ■ Subject: Interior Design ■ Request Details: Interior Construction ■ Construction Duration: 8 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Construction Case] Floor Replacement Work

Using double-sided tape that is about twice as strong as conventional tape! Strengthened to prevent wrinkles and shifting of the artificial turf during passage.

We received a request from a customer stating, "The artificial turf laid in the aisle has become discolored due to aging and oil stains from shoes, and in some places, the underlying flooring is peeling up, so we would like to repair and replace it." In response, we first brought three types of artificial turf samples for the customer to choose from while discussing prices. After removing the existing artificial turf and adhesive tape to create a flat surface, we repaired the lifted flooring and then applied the new artificial turf. The customer commented, "As expected from a professional, the finish is beautiful and unrecognizable." 【Case Overview】 ■ Industry: Manufacturing ■ Target: Flooring ■ Request: Artificial turf replacement work ■ Construction Duration: 3 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Example] Air Conditioner Replacement Work

Construction scheduled to match the customer's holiday! We also performed caulking to prevent water from entering.

I received a request from a customer saying, 'The air conditioner that is currently installed has been there for a long time, and it seems to have poor heating efficiency, which has led to negative feedback from the office staff. I would like to take this opportunity to replace it, so could you please provide a quote?' I visited the site and conducted an on-site survey. I also selected the air conditioner, and provided a comprehensive estimate that included the selection of a new unit, replacement from the current air conditioner, refrigerant recovery and destruction, and removal work. On the day of the work, since it was an office, I took precautions to prevent dirt and scratches by covering the steel boards installed on the walls before proceeding with the installation. [Case Overview] ■ Industry: Retail ■ Subject: Air conditioning unit ■ Request: Air conditioner replacement work ■ Work details: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Example] Electrical Switch Replacement Work

On-site replacement work was carried out! It was completed about an hour after receiving the inquiry.

I received a request stating, 'When I tried to turn on the lights in the changing room by flipping the switch, the lights did not turn on and the switch automatically reverted to the off position. Is it possible to have this repaired before employees use the changing room at the end of the workday?' I received a call from the customer and immediately went to the site to check the situation. I removed the electrical cover from the relevant area and confirmed the model number of the switch. Since the nearby home improvement store had the corresponding switch in stock, I purchased it and completed the restoration about an hour after receiving the initial inquiry from the customer. [Case Summary] ■ Industry: Automotive Parts ■ Subject: Electricity ■ Request: Urgent replacement of electrical switch ■ Work Duration: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Renovation Project Example] New Toilet Installation

The structure inside the restroom is made with lightweight steel framing, creating a foundation for construction! This is an example where a washbasin space was also secured.

We would like to introduce a case where a customer requested, "I want to convert the current restroom into a women's restroom and create a separate men's restroom." First, we investigated whether it was possible to install a restroom in this location, including checking the drainage pipe installation up to the septic tank and the feasibility of installing a water supply pipe. The structure inside the restroom was built with lightweight steel framing. Additionally, the western-style toilet area was designed as a complete private room rather than using panels. We discussed and decided on each element, such as the exterior walls and interior finishes, while reviewing samples with the customer. 【Case Overview】 ■ Industry: Manufacturing ■ Subject: Restroom ■ Request: New restroom installation ■ Construction Duration: 3 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitase District, Nakuse District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Example] Asphalt Paving

Repairing the concrete of the catch basin with mortar! Introducing a construction case of the outer road within the factory.

We received a request stating, "There are several holes in the outer road within the factory, and the areas where trucks pass are uneven, so we would like to repair them." We immediately contacted our partner company, conducted a site survey, and submitted an estimate. On the day of construction, when we actually removed the asphalt, we found that the ground was worse than expected, and the nearby drainage pit was also broken, so we reported this to the customer. On a separate day, we removed 8m² of asphalt again and repaired the concrete of the drainage pit with mortar. After that, we filled the excavated area with crushed stone, compacted it, laid asphalt, and marked the lines. 【Case Overview】 ■ Industry: Manufacturing ■ Subject: Customer's internal road ■ Request: Asphalt paving ■ Construction duration: 4 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Example] Parking Lot Repair

Avoiding weekdays, work was carried out on Saturday! A case of repairing a parking lot with an area of 30m x 30m.

We received a request from the customer stating, "There is an employee parking lot within the factory, but some areas of the road are uneven, and when it rains or snows, puddles form, making the road messy, so we would like to have it repaired." We contacted a partner company and later accompanied them to the site for an on-site investigation. After the investigation, we submitted a quote to the customer based on the measurements. Following that, we received an order for the construction and coordinated the schedule for the work. On the day of the work, we used two 10-ton dump trucks to lay crushed stone in the designated areas and successfully completed the task. [Case Overview] ■ Industry: Manufacturing ■ Subject: Customer's parking lot ■ Request: Parking lot repair ■ Work details: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Example] Curtain Replacement Work

Measure the size of the curtains and check other areas that need repairs! An example from the automotive parts manufacturing industry.

We received a request from the customer stating, "The vinyl curtain outside the factory has deteriorated over time and has torn, and it has also come off the rail, so I would like to request the replacement of the curtain." After measuring the size of the curtain and checking other areas that needed repair, we found not only the deterioration of the curtain but also deformation of the curtain rail and missing drop pins. We explained these repair areas during the estimate and received a request for arrangements. Unfortunately, the construction day was rainy, but the work was completed in about four hours after starting. We received feedback saying, "The repairs were done beautifully, and the appearance has improved significantly." [Case Summary] ■ Industry: Automotive Parts Manufacturing ■ Target: Manufacturing Industry ■ Request Details: Curtain Replacement ■ Construction Duration: Approximately 4 hours *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Example] Sheet Shutter Replacement Work

Utilizing the existing main body and frame as they are! A case where the work was completed without obstructing the passage of the fork.

We received a request from a customer stating, "The window of the sheet shutter has deteriorated over time and is dirty, making it difficult to see through, which is not good for safety. However, due to budget constraints, we cannot completely replace the sheet shutter and would like to only replace the sheets." Therefore, we decided to utilize the existing body and frame and only replace the sheets. Measuring and creating each sheet took time, but due to high traffic, it was difficult to work during operation. After consulting with the customer, we managed to split the work into the lunchtime break when the factory was stopped. 【Case Overview】 ■ Industry: Manufacturing ■ Subject: Sheet Shutter ■ Request Details: Replacement of Sheet Shutter ■ Construction Duration: 3 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Construction Case] Bird Damage Prevention Work (Pigeon Control)

Submit a completion report after the work! Limited the installation locations of the scaffolding to two places and proposed the content as requested.

We received a request from a customer stating, "Due to pigeon droppings and feathers, our products and packaging boxes are being damaged, and we would like you to respond urgently. We would like the installation of the scaffolding to be considered at the minimum necessary locations." We visited the site with a specialist in bird damage control and conducted an on-site hearing to assess the situation. We confirmed the timing and locations of the pigeon damage and proposed two options on-site based on the budget and construction period. The customer expressed, "This time, with a limited budget, your suitable proposal that matched our budget and timeline was extremely helpful." 【Case Overview】 ■ Industry: Residential equipment manufacturer ■ Subject: Building repair ■ Request: Pigeon control ■ Construction details: 2-week construction period (2 days for scaffolding installation, approximately 10 days for construction, 1 day for scaffolding dismantling) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei region, Chusei region (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Case] Rain Leak Repair Work

Introducing a case where the seal at the upper part of the leak was replaced and waterproofing treatment was applied to the pipe fixing brackets!

We received a request from a customer stating, "For some time now, rain has been running down the wall and the floor is soaked. Can you handle repairs for the leak?" After consulting with the customer, we went to the site with a craftsman to check the situation. We identified that several pipe brackets attached to the exterior wall were slightly rusted, creating small gaps that were the cause of the leak. We proposed to the customer to replace the seal above the leaking area and to waterproof the pipe brackets. We received feedback saying, "Thank you for your prompt response from investigation to repair." 【Case Overview】 ■ Industry: Food Industry ■ Subject: Leak Repair ■ Request Details: Maintenance Work ■ Work Details: 1 Day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Maintenance Work Case] Integrated Drainage Work

We propose a project to integrate the cover and the drainage ditch! A case where the work was completed without affecting operations.

Asphalt depression at the truck stopping area (for unloading work with a lift). When we conducted repair work, we noticed significant cracks in the concrete cover of the drainage ditch, so we removed the cover for inspection and found that the edges were quite chipped as well. Upon reporting to the customer, they consulted us, saying, "Since trucks and lifts pass through every day, we want to take measures to ensure safety, but is there a cost-effective solution?" Initially, we planned to replace only three severely damaged areas, but it turned out to be more cost-effective to address the entire area, so we integrated the drainage ditches for the entire truck parking area. Additionally, we installed a grating in the center for drainage during rainy weather. 【Case Summary】 ■ Industry: Manufacturing ■ Request: Repair of drainage ditch ■ Work Details: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 12 Next
  • 大型品の切削や低コストな複合加工に。ロボットシステムの資料進呈

    大型品の切削や低コストな複合加工に。ロボットシステムの資料進呈

  • PFAS規制に対応 PFASフリー コーティング剤 ・潤滑性を付与 摩擦低減、耐摩耗性向上 ・離型性を付与 撥水・撥油性、非粘着 など、多様の用途で提案が可能 素材は、金属・プラスチック・ゴムなど問いません!
  • フロン排出抑制法に関わるフロン管理工数0 ノンフロンチラー 冷媒「R1234yf(HFO)」採用 小型水槽付きインバーターチラー
    • Contact this company

      Contact Us Online
    • Before making an inquiry

      Download PDF

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.